Bulk Ore Sorting Delivers Exceptional 13x Tin Grade Uplift
Released
Released
Announcement PDF
:
–
+
%
• Excellent ore sorting results achieved from four bulk samples totalling over 75 tonnes,
processed using a full-scale TOMRA XRT Ore Sorter in a two-stage circuit. The overall
outcomes of the two stages are:
▪ Stage 1 Sorting: Tin upgraded from 0.17% Sn to 2.32% Sn (a 13x increase) with +94.8%
Sn recovery in total.
▪ Stage 2 Sorting: Further upgrade to 10.8% Sn (a further 4.6x increase on Stage 1)
with a +70% Sn recovery.
• Mass reduction of over 93% achieved with Stage 1 expected to significantly reduce the
potential CAPEX and OPEX for any future mining operation at Tallebung.
• Silver and tungsten also upgraded with high recoveries achieved. The average for silver
showed:
▪ Stage 1 Sorting: Silver upgraded from 7.44g/t Ag to 75.9g/t Ag (a 10x increase) with
+80% Ag recovery in total.
• The results validate the scalability of SKY’s prior metallurgical testwork and confirm the
effectiveness of ore sorting, even in highly weathered surface mineralisation—likely the least
favourable zone of the deposit for ore sorting due to its friable nature.
• Bulk samples will now undergo Dense Medium Separation (DMS) at ALS Perth, followed
by pilot-scale gravity processing at ALS Burnie to produce a saleable tin concentrate for offtake marketing.
SKY Managing Director & CEO Oliver Davies commented: “These outstanding results are a major milestone for
SKY. Achieving strong grade upgrades and high recoveries in a large bulk sample confirms and improves on the
past testwork, while further demonstrating the scalability and reliability of our ore sorting strategy. Tallebung’s
geology—characterised by ubiquitously large, discrete cassiterite grains in shallow veins—is ideally suited to ore
sorting technology, enabling exceptional performance even in challenging zones, as were excavated for the bulk
sample.
“The bulk sampling program reinforces the opportunity to substantially reduce future OPEX and CAPEX with over
93% of the mass removed in this testwork while maintaining exceptional tin recoveries. With pilot-scale gravity
processing to follow and further drilling results imminent, SKY is well-positioned to continue accelerating the
Tallebung Project towards development.”
Watch a video summary of this announcement & engage with SKY here
SKY METALS LIMITED
+61 2 6360 1587
2 HAWTHORN PLACE, ORANGE NSW 2800
WWW.SKYMETALS.COM.AU
ABN 46 098 952 035
Sky Metals Ltd (ASX: SKY) (“SKY” or the “Company”) is pleased to report great results from recent full-scale ore
sorting testwork on four bulk samples, totalling over 75 tonnes, from its flagship 100%-owned Tallebung Tin Project
in central NSW.
TALLEBUNG PROJECT (EL 6699, SKY 100%)
EXCEPTIONAL ORE SORTING RESULTS FROM BULK SAMPLES
This bulk sampling program represents a critical step in SKY’s strategy to advance Tallebung through ongoing
mining studies. The program was designed to replicate real-world mining and processing conditions, enabling SKY
to validate and optimise its metallurgical flowsheet at pilot scale.
Samples were selected to represent a range of tin grades across the deposit, with the ultimate goal of producing
a saleable tin concentrate and supporting off-take discussions with downstream partners (see Figure 1).
Figure 1: Plan showing the location of the bulk sampling-trenching sites across the deposit with results from the
latest ore sorting testwork shown in orange labels along with the latest drilling results. Previous testwork results
and drill-hole intercepts are shown with black labels. Drill-holes over the project are shown and coloured by
inclusion in the last MRE – NB: all green drill-holes have not yet been included in the MRE. The current Tallebung
MRE is also shown over surface geology.
2
The bulk samples were excavated earlier this year from beneath mineralised zones identified in the recent
trenching program (see SKY ASX announcement dated 24 January 2025), using a large excavator and rock hammer
to extract 1m deep cuts directly below the excavated trenches. The material was then transported to Condobolin,
NSW, where it was crushed to –40mm and screened to separate –7mm fines.
The 7–40mm fraction was processed through a full-scale TOMRA XRT Ore Sorter in a two-stage circuit, delivering
exceptional upgrades in tin grade and showing excellent tin recovery, with the average across the four bulk
samples shown below (see Table 2 for more details):
Stage 1 Sorting: Tin upgraded from 0.17% Sn to 2.32% Sn (a 13x increase) with +94.8% Sn recovery total.
Stage 2 Sorting: Further upgrade to 10.8% Sn (a further 4.6x increase) with +70% Sn recovery.
Importantly, over 93% of mass was rejected in Stage 1, significantly reducing the volume for downstream
processing and highlighting the potential for substantial reductions in CAPEX and OPEX for future mining
operations at Tallebung.
Additionally, the bulk samples were extracted from highly weathered and friable near-surface material, which is
likely to be the least favourable zone of the deposit for ore sorting.
The nature of this at-surface excavated material, being crushed with limited controls and the transport of the
material from site to laboratories across Australia to complete the testwork, are all likely to have contributed to an
over-representation of fines (-7mm) material in the program. Despite this, the ore sorting results were exceptional,
demonstrating the robustness and scalability of SKY’s flowsheet using the TOMRA ore sorting.
The success in upgrading and recovering tin from this challenging material highlights the potential for even
stronger performance from deeper, more competent zones of mineralisation, as would be encountered in any
future mining operation.
Silver and tungsten by-products also demonstrated strong upgrades and recoveries:
Stage 1 Sorting: Silver upgraded from 7.44g/t Ag to 75.9g/t Ag (a 10x increase) with +80% Ag recovery.
A large proportion of the tungsten reported to the crushing fines and recoveries of tungsten in the processing will
be re-evaluated once the results of the Dense Medium Separation (DMS) testwork on the fines is completed.
Both silver and tungsten show strong potential to be valuable by-products at the Tallebung Project.
Figure 2 shows a schematic of the proposed pre-concentration flowsheet being trialled with these bulk ore sorting
results demonstrating that this can deliver a +90% mass reduction, prior to more costly processing.
These results validate the scalability and robustness of SKY’s metallurgical flowsheet, confirming the
effectiveness of ore sorting – even in highly weathered surface mineralisation.
Next Steps in Metallurgical Program
The fines material (-7mm) and the waste from the Stage 2 ore sort will now undergo DMS trials at ALS Perth,
followed by pilot-scale gravity processing at ALS Burnie of the products from the ore sorting and DMS testwork.
The gravity circuit will be designed to produce a final tin concentrate which will be used in off-take marketing and
end-user engagement, supporting SKY’s near-term tin production strategy.
3
Figure 2: Schematic of the pre-concentration flowsheet currently being trialled in the bulk sampling testwork.
The bulk ore sorting results demonstrate the potential for over 90% mass reduction with high tin recoveries. This
approach is expected to significantly lower future CAPEX and OPEX, while also delivering significant
environmental benefits through substantial reductions in any water and energy consumption in processing.
This announcement is authorised for release by the Board of Sky Metals Limited.
Investors:
Oliver Davies – Managing Director & CEO
+61 (0) 430 359 547
Media:
Nicholas Read – Read Corporate
+61 (0) 419 929 046
JOIN SKY METALS’ INTERACTIVE INVESTOR HUB
Visit skymetals.com.au to interact with Sky Metals’ announcements and updates
To watch a video summary of this announcement & engage with SKY click here
About the Tallebung Tin Project (100% SKY)
Tallebung stands as an open-pit, technology enabled, near-term tin development project. Tallebung is uniquely
placed to provide secure tin supply, to feed irreplaceable and rapidly expanding tin demand, essential in semiconductors, electronics and solar PV technologies.
The Tallebung Tin Project is located at the site of large-scale historical tin mining in central Western NSW
where tin was first discovered in the 1890s. SKY is progressively defining a large-scale hardrock tin resource
with recent higher-grade tin zones discovered on the margins of the known deposit and exceptional
metallurgical performance demonstrated across the entire known deposit.
The shallow, open-pit tin veins combined with the ideal nature of the tin, hosted as large, discrete grains of
simple tin-oxide (cassiterite minerals), all ideally lends itself to low-cost tin production advantages, including
exceptional X-ray based ore sorting performance, demonstrated to upgrade the tin up to 44x, prior to low-cost
gravity separation to produce a saleable tin concentrate.
4
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver
Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee and
director of Sky Metals Ltd and has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves.’ Mr. Davies consents to the inclusion in this report of the matters based on his information in the
form and context in which it appears.
The information in this report that relates to Metallurgical Results is based on information compiled by Michael
Gunn, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Michael Gunn is a contractor of Sky
Metals Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Gunn consents to the inclusion in this report of the matters based on his information in the form and context in
which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www.asx.com.au). The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves
and resources, production levels and rates, costs, prices, future performance or potential growth of Sky Metals
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Sky Metals Ltd.
Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may
differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been,
and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining,
and Metallurgy and Australian Institute of Geoscientists.
Table 1: Trench coordinates (MGA94 Zone 55) with start and end with name and length of trench.
TRENCH
ID
START
END
LENGTH
EASTING
NORTHING
RL
EASTING
NORTHING
RL
6376278
6376641
294
283
460855
460760
6376288
6376653
292
281
25
T5
460832
460726
T7
460440
6377163
266
460466
6377175
265
28
T8
460500
6376841
287
460529
6376856
288
32
T4
5
36
COMMENTS
Table 2: Tallebung Tin Project – TOMRA Ore Sorting Bulk Sample Testwork Results.
Element
Ore
Sort
Stage
1
Sn
2
Feed
Mass
Head
Grade
Product
Mass
Product
Grade
Waste
Mass
Waste
Grade
Total
Recovery
Mass
Reduction
Sort
Upgrade
Overall
Upgrade
kg
Sn %
kg
Sn %
kg
Sn %
%
%
x
x
T4
T5
T7
T8
8826.1
8603.9
7736.0
12541.2
0.04%
0.42%
0.09%
0.14%
195.5
1150.5
359.0
769.4
1.11%
2.93%
1.74%
1.99%
8630.6
7453.4
7377.0
11771.8
0.015%
0.035%
0.010%
0.015%
82.2%
96.2%
95.6%
94.3%
97.8%
86.6%
95.4%
93.9%
28.3
6.9
19.3
14.6
Weighted
Average
37707.1
0.17%
2474.3
2.32%
35232.8
0.018%
94.8%
93.4%
13.7
T4
195.5
1.11%
14.6
8.69%
180.9
0.50%
82.6%
91.9%
7.8
221.2
T5
1150.5
2.93%
252.0
11.86%
898.5
0.42%
56.6%
72.0%
4.1
28.1
T7
359.0
1.74%
48.0
7.23%
311.0
0.89%
79.1%
84.6%
4.2
80.2
T8
769.4
1.99%
100.0
10.10%
669.4
0.78%
67.3%
85.1%
5.1
74.1
Weighted
Average
2474.3
2.32%
414.5
10.79%
2059.8
0.78%
70.1%
79.9%
4.7
63.8
kg
Ag (g/t)
kg
%
%
Sample
T4
8826.1
Ag
(g/t)
5.20
195.5
78.5
8630.6
Ag
(g/t)
4.00
T5
8603.9
6.73
1150.5
26.7
7453.4
T7
7736.0
4.53
359.0
48.9
T8
12541.2
11.3
769.4
Weighted
Average
280.4
7.44
T4
195.5
T5
kg
1
Ag
2
1
W
2
x
50%
98%
15.08
2.00
68%
85%
3.97
7377.0
2.00
89%
95%
10.79
161.5
11771.8
2.00
90%
93%
14.31
2474.3
75.9
35232.8
2.45
81%
93%
10.21
78.5
14.6
2.00
180.9
3.30
25%
92%
0.03
1150.5
26.7
252.0
2.00
898.5
14.4
36%
72%
0.07
T7
359.0
48.9
48.0
2.00
311.0
0.87
79%
85%
0.04
T8
769.4
161.5
100.0
14.0
669.4
33.7
20%
85%
0.09
Weighted
Average
2474.3
75.9
414.5
7.09
2059.8
17.1
44%
80%
0.09
kg
W%
kg
W%
kg
W%
%
T4
8826.1
0.010%
195.5
0.015%
8630.6
0.010%
48%
98%
1.5
T5
8603.9
0.015%
1150.5
0.047%
7453.4
0.010%
81%
85%
3.2
T7
7736.0
0.010%
359.0
0.015%
7377.0
0.010%
56%
95%
1.5
T8
12541.2
0.015%
769.4
0.089%
11771.8
0.010%
57%
93%
6.0
Weighted
Average
37707.1
0.013%
2474.3
0.053%
35232.8
0.009%
65%
93%
4.1
T4
195.5
0.015%
14.6
0.080%
180.9
0.010%
53%
92%
5.3
T5
1150.5
0.047%
252.0
0.145%
898.5
0.020%
23%
72%
3.1
T7
359.0
0.015%
48.0
0.048%
311.0
0.010%
46%
85%
3.2
T8
769.4
0.089%
100.0
0.420%
669.4
0.040%
53%
85%
4.7
Weighted
Average
2474.3
0.053%
414.5
0.198%
2059.8
0.024%
60%
80%
3.7
6
%
x
Table 2: Tallebung Tin Project – Crush fines (-7mm) summary.
Fines (-7mm)
T4
T5
T7
Sn%
Ag ppm
+1.0
5154.0
0.080
0.010
1.00
-1.0
Calculated
Head
Assay
Head
+1.0
2285.5
0.070
0.010
1.00
7439.5
0.077
0.010
1.00
0.050
0.010
<2
3858.3
0.330
0.010
1.00
-1.0
2786.0
0.210
0.010
1.00
6644.3
0.280
0.010
1.00
0.240
0.010
<2
4950.0
0.130
0.020
1.20
-1.0
3685.5
0.150
0.010
1.20
Calculated
Head
8635.5
0.139
0.016
1.20
0.110
0.020
1.50
Calculated
Head
Assay
Head
+1.0
Assay
Head
T8
W%
+1.0
5552.0
0.170
0.010
3.00
-1.0
2981.0
0.140
0.010
3.90
Calculated
Head
8533.0
0.160
0.010
3.31
0.160
0.010
3.60
Assay
Head
7
JORC CODE, 2012 - TABLE 1
Section 1 Sampling Techniques and Data – TALLEBUNG PROJECT
(Criteria in this section apply to all succeeding sections)
Criteria
Explanation
Sampling techniques
Commentary
•
Sample were from approximately 1m deep x 1m wide from the floor of a 0.5-1m deep x 1m wide trench to
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation, such expose an even surface of bedrock before excavation and sampling was parallel to trench orientation and
as downhole gamma sondes, or handheld XRF instruments, etc). These examples should not taken across exposed bedrock only.
be taken as limiting the broad meaning of sampling.
All samples were transported to ALS Perth for preparation and assaying.
•
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
All sample lab received weights show consistency with interval length, indicating no overrepresentation of
any interval within an assayed interval. Excavations were supervised closely to ensure a consist depth and
width was maintained over the trenching to ensure no metre was unduly over-represented.
•
Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (e.g.
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In other cases, more explanation may be required,
such as where there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of
detailed information.
Each sample was crushed to -40mm and transported to TOMRA Ore Sorting Solutions, Sydney, where they
were sorted before being transported to ALS Perth and product was sent to ALS Burnie. Waste was
transported to ALS Perth at expense to the company due to the suitable equipment, procedures and
expertise of ALS Perth to homogenise and sample representative material for assay to ensure the best assay
result possible was gained for the waste as well as the product materials.
Once samples were obtained, whole sample pulverised as per standard industry practice with the entire
sample crushed to sub 2mm, split and then 2-3kg pulverised to >90% passing 75um.
Standard assay procedures performed by a reputable assay lab, ALS Perth including Ag (method ME-MS41).
Sn and W assays were generated by lithium borate fusion XRF (method ME-MS85) – considered appropriate
for these elements and by XRF fusion for +1% ore grade assays.
Drilling techniques
•
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, N/A – no drilling results reported
sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if so, by what method, etc)
Drill sample recovery
•
•
N/A – no drilling results reported
Method of recording and assessing core and chip sample recoveries and results assessed.
Measures taken to maximise sample recovery and ensure representative nature of the
samples.
Whether a relationship exists between sample recovery and grade and whether sample bias
may have occurred due to preferential loss/gain of fine/coarse material
Whether core and chip samples have been geologically and geotechnically logged to a level Systematic geological and geotechnical logging was undertaken when the trenches were originally
of detail to support appropriate Mineral Resource estimation, mining studies and
excavated. Data collected includes:
metallurgical studies
•
Nature and extent of lithologies.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
•
Relationship between lithologies.
photography
•
Amount and mode of occurrence of ore minerals.
The total length and percentage of the relevant intersections logged
•
Location, extent, and nature of structures such as bedding, cleavage, veins, faults etc. Structural
data (alpha & beta) are recorded for orientated core.
•
Logging
•
•
•
8
Criteria
Explanation
Commentary
Both qualitative and quantitative data is collected.
Sub-sampling techniques
and sample preparation
•
•
•
•
•
•
Quality of assay data
and laboratory tests
•
•
•
Verification of sampling •
and assaying
•
•
•
Each channel sample was dried, crushed and pulverised as per standard industry practice with the entire
If core, whether cut or sawn and whether quarter, half or all core taken
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry sample crushed to sub 2mm, split and then 2-3kg pulverised to >90% passing 75um.
For all sample types, the nature, quality and appropriateness of the sample preparation
Bulk samples were homogenised and rotary split as per ALS Perth procedures to ensure a representative
technique
assay for the large masses involved were obtained.
Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples
Large sample sizes (7-10kg) were taken and considered appropriate; however, this work will form the basis
of a study into sample representivity for the whole deposit. See body of announcement.
Measures taken to ensure that the sampling is representative of the in-situ material collected,
including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled
The nature, quality and appropriateness of the assaying and laboratory procedures used and Standard assay procedures performed by a reputable assay lab, ALS Perth including Ag (method ME-MS41).
Sn and W assays were generated by lithium borate fusion XRF (method ME-MS85) – considered appropriate
whether the technique is considered partial or total
For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in for these elements and by XRF fusion for +1% ore grade assays.
determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc
No geophysical tools were used in the determination of assay results.
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision
have been established
The verification of significant intersections by either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data
Drill data is compiled, collated and reviewed by senior staff and external consultants. The calculations were
viewed by >1 personnel.
No drilling results are reported.
Assay data was provided by ALS Perth and ALS Burnie via spreadsheets. The data was validated using the
results received from the known certified reference material. Hard copies of the assay certificates were
stored with drill hole data such as drillers plods, invoices, and hole planning documents.
Assay data is not adjusted.
Location of data points
•
•
•
Data spacing and
distribution
•
•
•
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
Specification of the grid system used
Quality and adequacy of topographic control
SKY has used DGPS surveying of across the trenches (± 0.1m) to accurately locate them.
All coordinates are based on Map Grid Australia Zone 55E, Geodetic Datum of Australia 1994.
Data spacing for reporting of Exploration Results
Data spacing has been applied to gather data from across the deposit at varying grades. This is to ensure that
Whether the data spacing, and distribution is sufficient to establish the degree of geological results are presentive of the whole deposit. All previous variability studies have shown no appreciable
and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation
change in deposit characteristics in regard to metallurgical performance.
procedure(s) and classifications applied
Whether sample compositing has been applied
Sample Compositing is not applied.
9
Criteria
Orientation of data in
relation to geological
structure
•
•
Explanation
Commentary
Whether the orientation of sampling achieves unbiased sampling of possible structures and
the extent to which this is known, considering the deposit type
If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced sampling bias, this should be assessed and
reported if material
Trenches were orientated to cross the mineralisation trend at moderate to high angles perpendicular to
strike. As the trench is along the surface, not adjust can be made for the dip of the mineralisation, a near
horizontal trench is not ideal to intercept the shallow dipping veins at Tallebung but cannot be changed and
is a factor of using trenching.
No sample bias due to trench orientation is known. The structural controls on mineralisation is considered
well understood and consistent.
Sample security
•
The measures taken to ensure sample security
Sample chain of custody has been managed by the employees of Sky Metals who commissioned the
trenching and transport samples from the site to test facilities.
The Company has in place protocols to ensure data security.
Audits or reviews
•
The Company has external consultants to verify the metallurgical testwork and exploration data for the
resource estimation process. Further details for the MREs can be found in SKY ASX Announcement 22 Match
2023 and SKY ASX Announcement 23 January 2024.
The results of any audits or reviews of sampling techniques and data
Section 2 Reporting of Exploration Results – TALLEBUNG PROJECT
(Criteria listed in the preceding section also apply to this section)
Criteria
Explanation
Mineral tenement and
land tenure status
Exploration done by
other parties
Commentary
•
Type, reference name/number, location and ownership including agreements or material issues The Tallebung Project is described by NSW Exploration Licence 6699
with third parties such as joint ventures, partnerships, overriding royalties, native title interests, The tenement is 100% owned by Stannum Pty Ltd, a 100% owned subsidiary of Big Sky Metals Pty Ltd
historical sites, wilderness or national park and environmental settings.
and a 100% owned subsidiary of Sky Metals Ltd.
The Tallebung tenement is overlain by Native Title Determination Application No NC12/1 (Federal Court
No NSD 415/12). A determination of extinguished native title was received over a portion of the
Tallebung Tin Field.
An agreement between for the remainder of the tenement where Native Title has not been
extinguished, an agreement has been reached between Stannum and the Native Title Applicant to allow
access to the remainder of the tenement.
•
The security of the tenure held at the time of reporting along with any known impediments to
obtaining a licence to operate in the area
Stannum Pty Ltd have previously Commenced a Right to Negotiate Process (RTN) with the claimant
group with respect to Application No NC12/1 (Federal Court No NSD 415/12). These negotiations have
resulted in a land access agreement to be sign with Stannum Pty Ltd. A determination of extinguished
native title was received over a major portion of the Tallebung Tin Field and Stannum has also signed an
access agreement with the Native Title Applicant for access to the entire lease.
•
Acknowledgment and appraisal of exploration by other parties
The Tallebung Project area was subject to a modern, large-scale alluvial/colluvial mining by the Tullebong
Tin Syndicate in the period 1963-1972. The Tullebong Syndicate Completed a program of 24 short
diamond holes in 1968-69 designed to test the lode mineralisation at Tallebung.
Pruessag Completed a large-scale assessment of the alluvial tin deposits in 1984-85, including RC drilling,
10
Criteria
Explanation
Commentary
identifying the potential for a large, low grade alluvial deep lead.
In recent exploration, YTC Resources (now Aurelia Metals Ltd) Completed trenching, diamond drilling,
aircore drilling of tailings, and resistivity geophysics (EH4) at the Tallebung tin field. YTC recognised the
continued potential for both shallow high grade, and large scale low-grade porphyry-style- tin
mineralisation.
Geology
•
Drill hole Information
•
•
Data aggregation
methods
•
•
•
Deposit type, geological setting and style of mineralisation
The Ordovician aged Tallebung Group sediments in the Tallebung Tin Field area outcrop as a sequence of
weakly metamorphosed shales, siltstones, carbonaceous mudstones and minor quartz-rich sandstones.
The rocks are tightly folded, striking NNW at around 330o with variable dips. The tin mineralisation is
thought to be sourced from the Silurian-aged Erimeran granite, which outcrops 2km south of the
Tallebung Tin Field. The Tallebung Tin Field represents a site of significant tin and tungsten production
from high grade, quartz lodes and their associated alluvial and deep lead deposits. The field has been
worked sporadically from the discovery of lode tin in the 1890’s, through to the large-scale open cut
mining of alluvial tin by the Tullabong Tin Syndicate in the period 1963 to 1971. The Tallebung Tin Field
contains significant, tin bearing, unconsolidated sediments which are alluvial to elluvial in nature, poorly
sorted and contain coarse bedrock fragments up to 15cm in a matrix of sandy/silty clay with some iron
oxides and cemented layers. Sediment thickness varies from 5m to 36 metres. The east-trending, tin
bearing leads and deep leads