Quarterly Activities Report - March 2026
Released
Released
Announcement PDF
SKY METALS LIMITED
+61 2 6360 1587 2 HAWTHORN PLACE, ORANGE NSW 2800 WWW.SKYMETALS.COM.AU ABN 46 098 952 035
ASX: SKY
ASX ANNOUNCEMENT
29 April 2026
QUARTERLY ACTIVITIES REPORT TO 31
MARCH
202
6
TALLEBUNG ACCELERATES TOWARD DEVELOPMENT
ONSTRONG DRILLING
RESULTS
AND
ADVANCING
APPROVALS
DRIVEN BY
$20.5M
CAPITAL RAISE
TALLEBUNG TIN-TUNGSTEN-SILVER PROJECT, NSW
• Multiple shallow, high-grade tin, tungsten and silver intercepts returned from ongoing
multi-rig drilling campaign, with results including:
TBRC317: 8m @ 1.18% tin & 0.25% tungsten from 41m, including:
- 3m @ 2.88% tin & 0.45% tungsten from 42m
TBRC274: 3m @ 604g/t silver & 0.68% tin from 24m;
5m @ 123g/t silver & 0.11% tin from 50m; and
5m @ 90.2g/t silver & 0.14% tin from 66m
TBRC304: 24m @ 0.34% tin & 31.5g/t silver from 101m, including:
- 4m @ 1.02 % tin & 131g/t silver from 112m
TBRC302: 25m @ 0.27% tin, 0.09% tungsten & 17.0g/t silver from 7m, including:
- 2m @ 0.76% tin & 0.25% tungsten from 8m;
TBRC263: 21m @ 0.75% tin & 0.02% tungsten from 27m; including:
- 6m @ 2.40% tin & 0.03% tungsten from 40m
• Drilling and surface sampling defined significant extensions to the known mineralisation
to the east and south-east of the current deposit footprint.
• Updated MRE and mining studies on track for H1 2026, incorporating an additional ~350
drill holes and positioning for a step‑change in Resource size and confidence.
• Approvals pathway advancing, with the NSW State Significant Development process
initiated, Approvals Scoping Report commenced and environmental consultants engaged.
DORADILLA PROJECT, NSW
• Drilling planned for the next quarter to continue to expand on the emerging large-scale,
high-grade tin project at Doradilla.
CORPORATE
• Successful $20.5 M capital raise completed, underpinning a strong $20.6 M cash balance at
31 March 2026, with a further $492k commitment SKY Board pending shareholder approval.
2
JUNE 2026 QUARTER – PROPOSED WORK PROGRAM
TALLEBUNG TIN-TUNGSTEN-SILVER PROJECT
• Completion of large drilling program at Tallebung targeting ongoing Resource expansion and
extension of newly discovered high-grade zones.
• Bulk sample metallurgical program ongoing to optimise the process flowsheet, tungsten and
silver recoveries and produce marketable tin concentrates to aid in offtake marketing.
• Delivery of an updated MRE and associated mining studies.
The Board of Sky Metals Limited (‘SKY’ or ‘The Company’) is pleased to provide a Quarterly Activities Report
outlining SKY’s exploration and development programs during the March 2026 Quarter.
TALLEBUNG PROJECT (EL 6699, SKY 100%)
COMMENCEMENT OF MAJOR NEW RESOURCE GROWTH-FOCUSED DRILLING PROGRAM
Sky Metals continued to progress a growth-focused drilling program at the Tallebung Project throughout the
March Quarter. The drilling was designed to target Resource extensions, with a particular focus on the numerous
high-grade tin-silver-tungsten zones that have been discovered on the margins of the existing deposit.
The program also included in-fill and diamond drilling to support an updated Mineral Resource Estimate (MRE),
which is targeted for completion in the first half of 2026.
Assay results reported during the Quarter returned multiple shallow high grade tin, silver and tungsten intercepts
across several emerging zones of the expanding deposit.
In particular, drill-hole TBRC268 confirmed strong potential along the southern extent of the Tallebung deposit,
where the mineralisation remains open along strike. This hole highlights the presence of persistent high grade
silver tin mineralisation in this area, extending beyond the limits of the current Mineral Resource outline, with
intercepts including:
TBRC268: 5m @ 103g/t Ag & 0.30% Sn from 76m
Other standout drilling results include:
TBRC317: 8m @ 1.18% Sn & 0.25% W from 41m, including
3m @ 2.88% Sn & 0.45% W from 42m
TBRC296: 46m @ 0.26% Sn & 30.2g/t Ag from 15m, including
3m @ 2.18% Sn from 47m
TBRC304: 24m @ 0.34% Sn & 31.5g/t Ag from 101m, including
4m @ 1.02 % Sn & 131g/t Ag from 112m
TBRC302: 25m @ 0.27% Sn, 0.09% W & 17.0g/t Ag from 7m, including
2m @ 0.76% Sn & 0.25% W from 8m
TBRC274: 3m @ 604g/t Ag & 0.68% Sn from 24m;
5m @ 123g/t Ag & 0.11% Sn from 50m; and
5m @ 90.2g/t Ag & 0.14% Sn from 66m
TBRC276: 8m @ 59.4g/t Ag, 0.26% Sn & 0.06% W from 49m; and
3m @ 206g/t Ag, 0.63% Sn & 0.03% W from 86m
TBRC263: 21m @ 0.75% Sn & 0.02% W from 27m; including:
6m @ 2.40% Sn & 0.03% W from 40m
TBRC267: 12m @ 0.24% Sn & 21.5/t Ag from 58m, including:
3
2m @ 1.01% Sn, 82.8g/t Ag & 0.06% W from 66m;
2m @ 1.03% Sn, 61.5g/t Ag & 0.22% W from 118m
Collectively, these holes demonstrate both grade and thickness at depths ideal for shallow open pit development.
These results build on earlier programs that identified high grade positions on the deposit margins, reinforcing the
open-ended nature of the Tallebung system and its capability to deliver material Resource growth.
Figure 1: Plan showing the location of new drilling results and newly discovered surface sampling results. Drill-
hole collars, previously reported highlight drill intercepts and the limits of the existing Tallebung MRE are shown
over surface geology.
4
SOUTHERN EXTENSION CONFIRMED AT SURFACE
Tin-cassiterite-bearing rock chips grading up to 1.35% Sn (GC20260107-2) and 1.10% Sn and 18.2g/t Ag
(GC20260107-1) have been collected from newly identified historical workings south of the current Resource
envelope. These results have confirmed the continuity of mineralisation at surface and highlight additional
high-priority targets for immediate drill testing.
Follow-up drill holes are permitted and approved, ready to be drilled, and will be added to the current multi-rig
drilling schedule.
Figure 2: Cross‑section showing new drilling results from TBRC317 and TBRC318 alongside previously reported
drill‑hole intercepts. The surface positions of historical workings are displayed, with the mineralisation trending
towards these historical workings. Note: faults strike obliquely to the section, and some drill holes lie off section
centre, which may limit the precision of representing the geology in two dimensions.
APPROVALS & PERMITTING – SSD PROCESS INITIATED
SKY has initiated the NSW State Significant Development (SSD) approvals process for Tallebung, with
environmental consultants engaged to prepare and submit the Scoping Report in the coming months. The Company
has also appointed an Environmental Manager to support Executive Director Scott Todd and the leadership team,
ensuring dedicated capacity to coordinate baseline studies, community and stakeholder engagement, and to
advance the Environmental Impact Statement (EIS) work program on schedule.
The initiation of the SSD process represents an important milestone that runs in parallel with SKY’s multi-rig
drilling, metallurgical testwork and mine design activities. This integrated approach is designed to compress
timelines between exploration success, resource growth and development readiness.
Work is now underway to integrate these new target areas into the active drilling schedule, ensuring that both
extensional and in-fill drilling components progress simultaneously. The significant datasets being generated,
5
including detailed geological logging, structural interpretation, and expanding geotechnical coverage, will directly
feed into ongoing mine design, mining studies and metallurgical modelling, maintaining SKY’s strong momentum
toward development readiness.
Figure 3: Cross‑section showing drilling results from TBRC296 and TBRC301 alongside previously reported
drill‑hole intercepts. The surface positions of historical workings are displayed, with mineralisation trending
towards these historical workings. Note: faults strike obliquely to the section, and some drill holes lie off section
centre, which may limit the precision of representing the geology in two dimensions.
NEXT STEPS
Following the completion of the current drilling campaign, data from more than 450 drill holes will be used to inform
an updated Mineral Resource Estimate and mining studies which are scheduled for completion in the first half of
2026.
DORADILLA PROJECT (EL 6258, SKY 100%)
ROCK CHIP SAMPLING PROGRAM
Surface rock-chip sampling undertaken at the Doradilla Tin Project in north-western New South Wales during the
reporting period has significantly expanded the known mineralised strike length and further reinforced Doradilla’s
potential as a large-scale tin development opportunity, complementary to SKY’s flagship Tallebung Project.
The new rock-chip results continue to outline a large, coherent tin-polymetallic system at Doradilla, with
high-grade tin, lead, copper, zinc and indium identified over a growing strike length. Sample MP20250903-1
returned 3.10% tin with strong supporting base-metal values from the historical Wednesday Shaft area.
These results from the Wednesday Shaft site confirm the continuity of the tin mineralisation at Doradilla coincident
with the magnetic geophysical anomaly, which provides strong evidence that the Doradilla Strike is folded around
a northeast-southwest axis, substantially increasing the prospective strike extent.
6
These results extend the mineralised corridor to more than 10km, demonstrating that previous drilling and
exploration had only tested a small portion of the overall system. SKY’s earlier Exploration Target, defined over just
2.5km, already indicated the potential for a large tin system; the extension of mineralisation to the north and south
suggests that the scale of opportunity at Doradilla may be significantly greater than previously recognised.
Metallurgical testwork completed last year demonstrated excellent tin recovery (~78%) into a high-grade
concentrate using SKY’s updated flowsheet. This confirmed that mineralisation at Doradilla is well-suited to
modern processing technology and is capable of producing marketable tin products consistent with global smelter
specifications.
EXPLORATION TARGET
An Exploration Target has been defined for the Doradilla Tin Deposit, situated at the southwestern end of the
Doradilla–Midway–3KEL (DMK) skarn line within EL6258. The target is estimated at 10-15 million tonnes (Mt)
grading 0.32-0.42% Sn, representing a potential 32,000 to 63,000 tonnes of contained tin.
Table 1: Doradilla Tin Deposit: Initial Exploration Target for only 2.5km of the total 10km strike
Exploration Target
Tonnage Range Grade Range Contained Metal
Mt Tin (%) Tin (t)
Total @ 0.20% tin cut-off
grade
10 – 15 0.32 – 0.42 32,000 – 63,000
The potential quantity and grade of the Exploration Target are conceptual in nature. As such, there has been
insufficient exploration to estimate a Mineral Resource, and it is uncertain whether further exploration will result
in a Mineral Resource. The Exploration Target has been prepared in accordance with the JORC Code 2012.
The Exploration Target is based on:
• Historical drilling data from North Broken Hill Ltd, Renison Ltd, Aberfoyle Exploration Pty Ltd, and others
between 1972 and 1984.
• Compilation of over 94 drill collars and 5,150 assay records from SKY’s database.
• Observed mineralisation style and host geology, delineating the cassiterite-rich skarn system.
Full details of the Exploration Target were provided in the Company’s ASX Announcement dated 31 July 2025.
NEXT STEPS
SKY is preparing a targeted drilling program at Doradilla designed to:
• Confirm historical high-grade tin intersections;
• Test extensions of mineralisation identified in new surface sampling; and
• Begin systematic drill coverage across newly defined priority zones along the 10km corridor.
This drilling will form the foundation for future resource work, metallurgical optimisation and broader development
studies.
7
Figure 1: Plan showing the initial Exploration Target area and the extensions to quadruple the Exploration Target strike,
overlaid on regional magnetics, strongly indicating that the mineralised strike is continuous over more than 10km of strike
and open along strike in both directions.
NARRIAH PROJECT (EL 9524, SKY 100%)
DATA REVIEW AND SURFACE GEOCHMISTRY
Compilation of historic data showed strong potential for near surface tin-tungsten mineralisation at the Conapaira
Mining Reserve. This was further evidenced by the extensive historic workings in the area.
A site visit for ground-truthing historic data, geological mapping and rock chip sampling was completed in the
March Quarter and discovered extensive workings throughout the mining reserve and widespread evidence for
these workings occurring in close proximity to the Erigolia Granite Margin. Evidence for the close proximately to
the granite margin included exposed and preserved roof pendants.
Given the prospective position of these historic workings, rock chip samples were taken of areas of outcrop and
mine workings. These rock chip samples successfully identified high-grade tin, tungsten and silver mineralisation
over a strike length of more than 3km, with results including:
• 1.80% tin, 13.9g/t silver & 0.05% copper (JN240223-05);
• 1.50% tin, 0.26% tungsten & 14.7g/t silver (JN240223-04);
• 1.20% tin & 1.77% tungsten (JN240223-10).
GEOPHYSICAL MAGNETICS SURVEY
In the September Quarter 2024, a large aeromagnetics survey was flown over the +16km long prospective horizon
8
within the Narriah Project. The results from this survey will be combined with the rock chip results from the
Conapaira Mining Reserve to aid in targeting large-scale and high-grade tin and tungsten mineralisation.
Furthermore, the potential hard rock tin mineralisation in the majority of the Narriah Project remains untested by
previous explorers.
The results of the geophysical survey will be combined with the thorough compilation of the historic data and the
rock chip results to target follow up drilling, aiming to discover a large-scale and high-grade tin-tungsten deposit.
CULLARIN PROJECT: GOLD-LEAD-ZINC-COPPER
SKY 80%; DVP JV (EL7954)
Initial exploration at the Cullarin Project successfully validated historical results, returning broad zones of high-
grade mineralisation. Most notably:
HUD002: 93m @ 4.24g/t Au & 1.87% Pb+Zn from 56m
In addition to the excellent drill results, re-assay of historical auger drilling pulps has revealed multiple untested
gold anomalies, including at the Poplar Prospect, where 9.91g/t Au was intercepted with no follow-up work
completed to date, demonstrating the prospectivity of a +20km gold corridor at Cullarin.
Given the exceptional potential of these high-grade gold prospects and SKY’s strategic focus on advancing its tin
portfolio, the Company is open to partnering with groups capable of accelerating exploration and development at
Cullarin. SKY is enthusiastic to see further exploration on this project offering significant upside in a proven +20km
mineralised corridor.
IRON DUKE PROJECT: COPPER-GOLD
100% SKY (EL6064 & 9191)
SKY exercised the option to purchase EL6064 – Iron Duke Project and SKY now holds 100% of the Project. The Iron
Duke Project covers the Iron Duke Shear Zone, which extends over a strike length of at least 4km and remains
open to the south. Several historic copper mines occur along the Iron Duke Shear Zone including the Iron Duke,
Christmas Gift, Monarch, Mount Pleasant and Silver Linings mines, along with several unnamed copper workings
and shafts.
An RC and diamond drilling program is planned to test for further extensions to the Iron Duke mine and test the
previously undrilled historic mines at the Christmas Gift Workings (comprising of the Christmas Gift, Monarch,
Mount Pleasant and Silver Linings mines).
CALEDONIAN PROJECT: GOLD
100% SKY (EL8920 & EL9020)
SKY has now completed a soil sampling program, a phase of AC drilling, two phases of RC drilling and two diamond
drill holes at the Caledonian Target. SKY has completed a soil sampling program, a phase of AC drilling, two phases
of RC drilling and two diamond drill holes at the Caledonian Prospect and intersected high-grade gold, results
included:
CARC011: 5m @ 4.46 g/t Au from 11m including,
2m @ 8.82 g/t Au from 11m
CARC002: 3m @ 13.6 g/t Au from 14m including,
1m @ 38.4 g/t Au from 15m
CAD001: 2m @ 11.4 g/t Au from 22m including,
1m @ 21.9 g/t Au from 22m
Recent review of drill core indicates that SKY was incorrect to target the Caledonian Prospect as a strata-hosted
skarn deposit and instead is more similar to the McPhillamys Deposit as first interpreted.
9
SKY has been informed of the proposed development of a solar farm on the northern area of EL8920. This area
covers the Jerrawa Strike, which is a trend of metallic occurrences that SKY interprets to be an exhalative horizon
with strong potential to host gold-silver and base metal mineralisation. Work to date has delineated a gold soil
anomaly which SKY plans to follow up in the following quarters, pending ongoing negotiations with the Solar Farm
developers.
GALWADGERE PROJECT: COPPER-GOLD
100% SKY (EL6320)
In 2021, SKY announced the Galwadgere maiden JORC-2012 Inferred Resource of 3.6Mt at 0.82% Cu & 0.27g/t Au
prepared by H&S Consultants (H&SC). H&S were engaged by SKY to complete the maiden resource using drilling
completed by SKY in 2020 and previous drilling completed by Alkane Resources (ALK) and other past explorers. A
drilling program at the Galwadgere Target is planned for the next quarters to further expand on the maiden JORC
2012 resource.
Soil sampling undertaken along strike from the Galwadgere MRE has identified two prospective copper-gold,
multielement pathfinder soil anomalies. The northern soil sampling program has delineated a soil anomaly which
is coincident with the McDowell’s mine, where several historic mine shafts and copper-carbonate minerals were
discovered near these workings. Soil sampling south of the Galwadgere Target has identified another soil anomaly
which appears similar in tenor to the anomaly identified at the McDowell’s mine. These anomalies are within 3km
of the Galwadgere resource and provide strong support for expanding the copper-gold resource at Galwadgere
with along strike exploration. These are priority drill targets to be tested along with other copper-gold working
within the tenement.
KANGIARA PROJECT: GOLD
80% SKY (EL8400 & EL8573; DVP JV)
The Kangiara Project (EL8400, EL8573) is located 30km north-west of Yass in the Southern Tablelands of New South
Wales. The project contains volcanic/volcaniclastic rocks of the Silurian Douro Group, considered prospective for
gold and base metal (copper-zinc) mineralisation. The high-grade Kangiara Mine operated during the early 1900s,
with documented production of ~40,000 tonnes at 16% Pb, 3% Cu, 5% Zn, 280g/t Ag and 2g/t Au from narrow north-
south trending sulphide veins (ASX: PDM 18 June 2009). Previous work by Paradigm Metals led to the calculation
of an Indicated and Inferred Mineral Resource at Kangiara.
Desktop studies have identified potential for copper-gold mineralisation at the Crosby Prospect. Field
investigations are planned for the upcoming quarters to investigate this prospect.
10
CORPORATE
CAPITAL RAISING
On 13 February 2026, SKY announced that it had received binding commitments to raise $20.5 million (before costs)
through a share placement (Placement) to fund the next stage of development at the Tallebung Project.
The Placement was undertaken to institutional, sophisticated and professional investors at an issue price of
A$0.155 per share, with approximately 132.2 million new fully-paid ordinary shares to be issued. Tranche 1 of the
Placement was completed utilising the Company’s existing placement capacity under ASX Listing Rule 7.1
(100,000,000 Shares) and 7.1A (29,032,258 Shares), with a second tranche of 3,200,000 Shares to be issued subject
to shareholder approval, committed by the Company’s Directors.
The proceeds of the Placement will be used to progress the continued development of the Tallebung Project,
including:
• Continued Resource expansion and in-fill drilling targeting growth and increased confidence in the
high-grade tin-silver-tungsten zones.
• Delivery of an updated Mineral Resource Estimate next quarter to underpin development studies.
• Completion of bulk sampling and metallurgical testwork to optimise processing and ore-sorting pathways.
• Progression of environmental studies and approvals supporting project advancement and future
development.
• Preparation for upcoming mining feasibility studies to position Tallebung for future tin-silver-tungsten
production.
Additionally, a portion of the funds will be allocated to advancing the large-scale Doradilla Project, including
follow-up drilling to build on the recent metallurgical breakthrough that delivered a saleable tin concentrate with
~78% tin recovery, unlocking the project as a strong second tin development opportunity within SKY’s portfolio.
Planned work at Doradilla will continue to expand the extensive mineralised footprint along the now 10km-long
corridor, where high-grade tin and broad polymetallic mineralisation have been identified, positioning the project
for significant growth. This program aims to further demonstrate Doradilla’s potential to mature into a future
large-scale, long-life tin deposit.
TENEMENT SUMMARY
Table 1: Tenement Summary.
Holder Equity
Licence
ID
Grant Date
Expiry
Date
Units Area Comment
Tarago Exploration Pty Ltd (DVP sub) 80% EL7954 19-6-2012 19-6-2028 51 144 km2 Cullarin Project, SKY:
DVP JV
Ochre Resources Pty Ltd (DVP sub) 80% EL8400 20-10-2015 20-10-2024 52 147 km2 Kangiara Project,
SKY: DVP JV
Ochre Resources Pty Ltd (DVP sub) 80% EL8573 23-5-2017 23-5-2029 17 48 km2 Kangiara Project,
SKY: DVP JV
Aurum Metals Pty Ltd (SKY sub) 100% EL8920 5-12-2019 5-12-2025 65 183 km2
Caledonian Project
Cuprum Aurum Pty Ltd (SKY sub) 100% EL6320 12-10-2004 12-10-2026 14 41 km2
Galwadgere Project
Balmain Minerals Pty Ltd (SKY sub) 100% EL6064 21-3-2003 20-3-2028 5 15 km2
Iron Duke Project
Balmain Minerals Pty Ltd (SKY sub) 100% EL9191 8-6-2021 8-6-2027 60 174 km2
Iron Duke Project
Stannum Pty Ltd (SKY sub) 100% EL6258 21-6-2004 21-6-2026 38 113 km2
Doradilla Project
Stannum Pty Ltd (SKY sub) 100% EL6699 10-1-2007 10-1-2027 14 41 km2
Tallebung Project
Stannum Pty Ltd (SKY sub) 100% EL9524 8-2-2023 8-2-2029 92 262 km2
Narriah Project
Stannum Pty Ltd (SKY sub) 100% EL9779 5-7-2024 15-05-2031 101 287 km2
Narriah Project
Stannum Pty Ltd (SKY sub) 100% ELA6926
Applied for
on 3-7-2025
- 177 514 km2 Tallebung Project –
Application
Stannum Pty Ltd (SKY sub) 100% EL9864 6-2-2026 6-2-2032 6 18 km2
Tallebung Project
11
FINANCIAL
During the quarter $2,340k was spent on the exploration activities outlined in this report.
No mining production and development activities were undertaken for the quarter.
During the quarter $72k was paid as Non-Executive Director and Consulting fees.
This announcement is authorised for release by the Board of Sky Metals Limited.
For further information:
Investors:
Oliver Davies, CEO – Sky Metals
M: 0430 359 547
Media:
Nicholas Read – Read Corporate
M: 0419 929 046
JOIN SKY METALS’ INTERACTIVE INVESTOR HUB
Visit skymetals.com.au to interact with Sky Metals’ announcements and updates
To watch a video summary of this announcement & engage with SKY click here
About the Tallebung Tin Project (100% SKY)
Tallebung stands as an open-pit, technology enabled, near-term tin development project. Tallebung is uniquely
placed to provide secure tin supply, to feed irreplaceable and rapidly expanding tin demand, essential in semi-
conductors, electronics and solar PV technologies.
The Tallebung Tin Project is located at the site of large-scale historical tin mining in central Western NSW
where tin was first discovered in the 1890s. SKY is progressively defining a large-scale hardrock tin resource
with recent higher-grade tin zones discovered on the margins of the known deposit and exceptional
metallurgical performance demonstrated across the entire known deposit.
The shallow, open-pit tin veins combined with the ideal nature of the tin, hosted as large, discrete grains of
simple tin-oxide (cassiterite minerals), all ideally lends itself to low-cost tin production advantages, including
exceptional X-ray based ore sorting performance, demonstrated to upgrade the tin up to 44x, prior to low-cost
gravity separation to produce a saleable tin concentrate.
12
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver
Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee and
director of Sky Metals Ltd and has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves.’ Mr. Davies consents to the inclusion in this report of the matters based on his information in the
form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www.asx.com.au). The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves
and resources, production levels and rates, costs, prices, future performance or potential growth of Sky Metals
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Sky Metals Ltd.
Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may
differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been,
and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining,
and Metallurgy and Australian Institute of Geoscientists.