Blue Ocean Equities - NSW and Qld Mining Day Presentation
Released
Released
Announcement PDF
DEVELOPING LARGE SCALE
TIN DEPOSITS IN NSW –
TO FEED GLOBAL
ELECTRIFICATION
FEBRUARY 2024
ASX: SKY
DISCLAI ME R - IMPORTANT INFORMATI ON
Disclaimer
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to be materially different from those expressed or implied by such forward looking information, including risks
associated with investments in private and publicly listed companies such as the Company; risks associated with general economic conditions; the risk that further funding may be required but unavailable for the ongoing development of the
Company’s projects or future acquisitions; changes in government regulations, policies or legislation; unforeseen expenses; fluctuations in commodity prices; fluctuation in exchange rates; litigation risk; restrictions on the repatriation of earnings
by the Company’s subsidiaries; the inherent risks and dangers of mining exploration and operations in general; risk of continued negative operating cashflow; the possibility that required permits may not be obtained; environmental risks;
uncertainty in the estimation of mineral resources and mineral reserves; general risks associated with the feasibility and development of each of the Company’s projects; foreign investment risks in Australia; changes in laws or regulations; future
actions by government; breach of any of the contracts through which the Company holds property rights; defects in or challenges to the Company’s property interests; uninsured hazards; disruptions to the Company’s supplies or service providers;
reliance on key personnel and retention of key employees.
Forward-looking information is based on the reasonable assumptions, estimates, analysis and opinions of management of the Company made in light of their experience and their perception of trends, current conditions and expected
developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. The Company believes that the assumptions
and expectations reflected in such forward-looking information are reasonable.
Assumptions have been made regarding, among other things: the Company’s ability to carry on its future exploration, development and production activities, the timely receipt of required approvals, the price of tin, gold, copper and base metals,
the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all
factors and assumptions which may have been used. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other
factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such
information. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
No Liability/Summary Information
The Company has prepared the Presentation Materials based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the fairness, accuracy or completeness of the information,
opinions and conclusions contained in the Presentation Materials. To the maximum extent permitted by law, the Company, its related bodies corporate (as that term is defined in the Corporations Act 2001 (Commonwealth of Australia)) and the
officers, directors, employees, advisers and agents of those entities do not accept any responsibility or liability including, without limitation, any liability arising from fault or negligence on the part of any person, for any loss arising from the use of
the Presentation Materials or its contents or otherwise arising in connection with it. Post 1989, exploration results detailed in this presentation have previously been reported to the ASX or in the independent geologist report contained in the
Prospectus lodged on 18 April 2019. Endowment = current resource plus production. Coordinate system on maps is MGA94 Zone55 unless otherwise stated.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee of Sky Metals Ltd and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr. Davies consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
The information in this report that relates to the Mineral Resource Estimate was prepared by Luke Burlet, who is a Member and Chartered Professional (Geology) of the Australasian Institute of Geoscientists. Luke Burlet is a Director of H & S
Consultants and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
2
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr Burlet consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
ASX: SKY
SKY’S T E AM
EXPERIENCED AND PROVEN MANAGEMENT
NORMAN SECKOLD | Chairman
RICHARD HILL | Non-Executive Director
CAPITAL STRUCTURE
30+ years in the full-time management of natural resource
companies. Past Chairman and Director of listed companies
including Bolnisi Gold NL, Timberline Minerals Inc.,
Perseverance Corporation Ltd, Valdora Minerals NL,
Palmarejo Silver, Kings Minerals NL, Mogul Mining NL and
Gold Corp. Currently Chairman of both Nickel Industries Ltd
and Alpha HPA Ltd.
25+ years experience in the mineral resources sector as a
geologist and solicitor. Mr. Hill has a successful track record
of guiding ASX listed mining companies from the exploration and
discovery phase through to development in a range of
commodities. These have included past roles as founding Director
for Aurelia Metals Ltd, Strandline Resources Ltd and as Chairman
of Genesis Minerals Ltd as well as current Chairman of New
World Resources.
Shares on issue
Options & Performance Rights
Share price (close 1 Feb 2024)
Market capitalisation
Cash (31 Dec 2023)
Debt
461.4M
45.4M
~$0.030
~$13.8M
~$1.12M
Nil
BOARD AND MANAGEMENT
RIMAS KAIRAITIS | Non-Executive Director
OLIVER DAVIES | CEO
25+ years experience in minerals exploration and resource
development in gold, base metals and industrial minerals.
In his most recent role, Mr. Kairaitis was founding Managing
Director and CEO of Aurelia Metals (ASX: AMI), which he
steered from a junior exploration company to a profitable NSW
based gold and base metals producer. Mr. Kairaitis is also the
Managing Director of Alpha HPA Limited.
Geologist with SKY since listing in 2019. Previously in exploration
and operational roles with Evolution Mining and Alkane
Resources in NSW and Qld. Mr. Davies has worked closely on
several successful NSW exploration projects including Evolution
Mining’s significant expansion of the Lake Cowal gold resource
and Alkane’s exploration success at Tomingley and Boda.
EXPERT GUIDANCE | SKY’s Consultants
Norm Seckold
Richard Hill
Rimas Kairaitis
Richard Willson
Oliver Davies
Chairman
Non-Executive Director
Non-Executive Director
Company Secretary
Chief Executive Officer
SHAREHOLDERS
Aurelia Metals
Board and Management
Top 20 holders
4%
9%
48.1%
Tallebung Environmental Mining Approvals: R.W. Corkery & Co. to advise on best practice for environmental studies and mining approvals process.
Tallebung Metallurgy – Gunn Metallurgy, TOMRA Ore Sorting Solutions and ALS Burnie engaged to conduct metallurgical testwork.
Tallebung Resource Estimation – H&SC modelled and estimated the MRE and Exploration Target.
3
ASX: SKY
APPE NDIX : TIN MARKET
TIN: KEY TECHNOLOGY METAL
Supply crunch driven by 30+ year under investment & growing demand for
tin primarily within EVs, Renewable Energy and all electronic goods.
Demand Increase with Emerging Technologies
ASX: SKY
APPE NDIX : TIN MARKET
TIN: THE FORGOTTEN ELECTRIFICATION METAL
Inelastic tin price driven by irreplaceable demand in electronics sector
20-year 3M tin price (AUD/tonne) (source: LME).
ASX: SKY
TIN MARKET
Visible Global Tin Stockpiles
TIN: THE FORGOTTEN ELECTRIFICATION METAL
– GLOBAL SUPPLY DISRUPTIONS
– Inelastic tin price – driven by irreplaceable demand in
electronics sector and global electrification.
– Record low stockpiles – US strategic stockpile depleted,
currently less than 2-3 days tin supply stock on LME.
– Pending Indonesia 2024 export ban – 1/5th of global tin
Source: LME – 25 March 2023
Global Tin Supply by Country (tpa)
– Myanmar suspended tin mining – 4th largest supplier
producing 10% of world tin supply.
– +30 year under investment in tin supply, metal shortages
inevitable, growing tin price.
– Limited ethical and reliable sources.
6
ASX: SKY
TALLEBUNG TIN PROJECT
MAJOR HISTORIC TIN OPERATION
•
Tin discovered in the 1890s and mined into
the mid-1980s.
•
Small shafts and open pits mined hardrock
tin veins, culminating in large scale alluvial
mining production in the 1960s-70s.
•
Infrastructure already in place from previous
mining includes:
•
•
Powerlines to site.
•
Haul roads constructed to site.
Large scale, hardrock tin deposit still in
place and only minor selective mining
historically.
Aerial Photo - Tallebung Tin Mine Historic Mining and Infrastructure. 7
ASX: SKY
TALLE B UN G TIN PROJECT
LARGE HISTORIC OPEN PIT ALLUVIAL MINING OPEATION
Tallebung Tin Mining Field – Drone Photo looking North.
8
ASX: SKY
TALLEBUNG TIN PROJECT
TALLEBUNG TIN PROJECT
Low-Cost Mining – Shallow deposit from
surface with very low strip ratio.
Exceptional Ore Sorting –increases grade
>5x and removes 80% of mass as waste.
Low-Cost Processing – Simple gravity
circuit for a saleable tin concentrate.
High Payability on Tin Concentrate – over
+95% payability on +60% tin concentrates.
Tallebung Tin Mine – Drone Photo looking West down the Central Lead Open Pit .
9
ASX: SKY
TALLEBUNG TIN PROJECT
LARGE HARDROCK TIN RESOURCE
• Updated Jan 2024 MRE, totals:
15.6 Mt @ 0.15% Tin for 23kt of contained Tin.
• New Exploration Target estimate:
23 – 32 Mt @ 0.14 – 0.17% Tin
• Tin mineralisation highly amenable to 5x upgrade
using TOMRA Ore Sorting – 0.15% = +0.70% Tin
• 0.70% Tin equivalent to +2.7g/t Au or +2.1% Cu.
• MRE and Exploration Target are open along
strike and up and down dip – only limited by
drilling.
• Maiden Indicated MRE:
5.00 Mt @ 0.16% Tin for 7.93kt of contained Tin.
Schematic Plan View - Tallebung Tin Mine
Recent results in yellow.
10
ASX: SKY
TALLE B UN G TIN PROJECT
Cassiterite Ore from Tallebung – Scale in mm
TOMRA – GAME CHANGER
Black Tin – cassiterite “nuggets”
detected by ore sorter and accepted
Host rock and quartz vein without tin
are rejected by ore sorter
• TOMRA Ore Sorting increase grade to
quintuple grade (+500%).
Schematic of a TOMRA XRT Ore Sorter
• Grade increases from 0.15% Tin x 5 =
over 0.70% Tin with +98% tin recovery
• +80% of mined mass rejected upfront.
• Reduced mass means smaller, lower
plant costs to produce a saleable tin
concentrate.
Rejected
Accepted
11
ASX: SKY
TALLE B UN G TIN PROJECT
TOMRA – GAME CHANGER
12
Video Courtesy of Carlos Crowley Vazquez, BOEq and TOMRA Ore Sorting Solutions
ASX: SKY
TALLE B UN G TIN PROJECT
TOMRA – PROVEN TECHNOLOGY
• Renison Tin Mine, Australia’s largest
operating tin mine, uses TOMRA Ore Sorters.
• TOMRA Ore Sorters commissioned 6 years
ago in 2018.
• Operate 24/7, year-round, sorting 1Mtpa
ROM.
• Sorting started with rejecting 10-15% of
mass, increasing to 20-25% of mass after
strong results in the first year of operation.
• Tallebung tin is ideal for ore sorting.
TOMRA Ore Sorters in operation at the Renison Tin Mine, Tas.
• SKY’s TOMRA Ore Sorting rejection of 80%
mined mass – significantly lower Capex and
Opex, only 1/5th of mass mined is processed.
13
ASX: SKY
TALLE B UN G TIN PROJECT
Feed: 0.15% Tin
EXCEPTIONAL, CONSISTENT
TOMRA ORE SORTING RESULTS
• TOMRA Ore Sorting first tested on drill chips:
• Upgrading of 0.19% tin to 0.70% tin
• +96% recovery of tin
• 74% mass reduction.
• Follow-up bulk testwork showed exceptional results:
• 0.29% tin upgraded to 0.89% tin
• +98% recovery of tin from a 542kg bulk sample
• 67% mass reduction.
Rejected
Waste: <0.01% Tin
Accepted
Upgraded Ore: +0.70% Tin
+80% of mass
<20% of mass
• Recent ore sorting variability testwork across the
entire deposit demonstrated:
• Average of over 5x increase in grade.
• Over 98% tin recovery with no tin detected in the
waste all but one sample.
• 80% reduction in mined mass.
Pictures Courtesy of Ian Spence and TOMRA Ore Sorting Solutions
14
ASX: SKY
TALLE B UN G TIN PROJECT
UNIQUELY SIMPLE METALLURGY –
LOW-COST PROCESSING
• Simple, conventional gravity circuit produces a
desirable +60% tin concentrate for sale.
• Environmentally best practice, no chemicals or
water required for TOMRA Sorting.
Cassiterite Ore from Tallebung – Scale in mm
• TOMRA Sorting and DMS results in only 20% of
mined mass requiring downstream processing
with +95% of tin recovered.
• Extremely low-cost processing – significant
reduction in Capex and Opex from ore sorting
and simple downstream processing.
• Dense Medium Separation (DMS) reduces fines
mass by over 80% with +94% tin recovery of tin.
Simplified Schematic Processing Flowsheet
15
ASX: SKY
TALLE B UN G TIN PROJECT
SHALLOW, HIGH-GRADE START UP
• Shallow, at surface high-grade tin zone identified for
fast payback potential at commencement of mining.
• Results within the high-grade zone include:
TBD002: 60.2m @ 0.54% Tin from 12.8m.
TBD003: 60.55m @ 0.36% Tin from 23m.
Schematic Cross-Section of Shallow High-Grade Zone
Plan View Aerial Image of the Tallebung Project
16
ASX: SKY
TALLE B UN G TIN PROJECT
LARGE TIN SYSTEM EXPANDING
• Previous drilling interpreted tin associated with
tungsten in the north and with silver in the south.
• Recent drilling and rock chip samples have changed
this – now two different lode packages are seen in
the deposit.
• These lodes have been offset by faulting.
• New interpretation substantially expands the
footprint of mineralisation.
• Large areas are untested due to these new
discoveries.
• Already a large 23-32Mt Exploration Target has been
estimated despite limited testing of the entire system.
Plan View of the Tallebung Project with New Lode Concept
17
ASX: SKY
TALLE B UN G TIN PROJECT
UPCOMING CATALYSTS
MRE Growth: converting +20-30Mt
Exploration Target into resources.
Drill high-grade tin zones and
grow Indicated Resources for
Mine Scoping Studies.
Bulk sampling across the deposit,
growing confidence in low-cost
sorting upgrade and metallurgy.
Release Mine Scoping Studies,
commencing mining approvals.
Drone over the Tallebung Tin Mining Field – Old Crusher and ROM to Southern Open Pit
18
DEVELOPING LARGE SCALE
TIN DEPOSITS IN NSW –
TO FEED GLOBAL
ELECTRIFICATION
ASX: SKY
NARRIAH PROJECT
NARRIAH PROJECT
– TIN-TUNGSTEN-LITHIUM
• Six major historic workings
discovered at surface, however,
most of the area is undercover.
• Six diamond drillholes completed
to test the tin and tungsten at
depth.
• Strong tin and tungsten
intercepted in all holes.
• Drilling indicates best areas for
large-scale, high-grade tin and
tungsten are untested.
• Further work planned to discover
potential large-scale tin systems.
20
ASX: SKY
NARRIAH PROJECT
NARRIAH PROJECT – UNDERCOVER & UNDER-EXPLORED
21
Share your feedback
Discover