International Mining and Resources Conference Presentation
Released
Released
Announcement PDF
ASX: SKY
LARGE-SCALE TIN DEPOSIT
MATCHED WITH TECHNOLOGY ADVANTAGE
TO MEET GROWING GLOBAL DEMAND FOR TIN –
A VITAL TECHNOLOGY METAL
A S X : S KY
DISCLAIMER - IMPORTANT INFORMATION
Disclaimer
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to be materially different from those expressed or implied by such forward looking information, including
risks associated with investments in private and publicly listed companies such as the Company; risks associated with general economic conditions; the risk that further funding may be required but unavailable for the ongoing
development of the Company’s projects or future acquisitions; changes in government regulations, policies or legislation; unforeseen expenses; fluctuations in commodity prices; fluctuation in exchange rates; litigation risk; restrictions on
the repatriation of earnings by the Company’s subsidiaries; the inherent risks and dangers of mining exploration and operations in general; risk of continued negative operating cashflow; the possibility that required permits may not be
obtained; environmental risks; uncertainty in the estimation of mineral resources and mineral reserves; general risks associated with the feasibility and development of each of the Company’s projects; foreign investment risks in
Australia; changes in laws or regulations; future actions by government; breach of any of the contracts through which the Company holds property rights; defects in or challenges to the Company’s property interests; uninsured hazards;
disruptions to the Company’s supplies or service providers; reliance on key personnel and retention of key employees.
Forward-looking information is based on the reasonable assumptions, estimates, analysis and opinions of management of the Company made in light of their experience and their perception of trends, current conditions and expected
developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. The Company believes that the
assumptions and expectations reflected in such forward-looking information are reasonable.
Assumptions have been made regarding, among other things: the Company’s ability to carry on its future exploration, development and production activities, the timely receipt of required approvals, the price of tin, gold, copper and base
metals, the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not
exhaustive of all factors and assumptions which may have been used. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking
information, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ
materially from those anticipated in such information. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in
accordance with applicable securities laws.
No Liability/Summary Information
The Company has prepared the Presentation Materials based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the fairness, accuracy or completeness of the
information, opinions and conclusions contained in the Presentation Materials. To the maximum extent permitted by law, the Company, its related bodies corporate (as that term is defined in the Corporations Act 2001 (Commonwealth
of Australia)) and the officers, directors, employees, advisers and agents of those entities do not accept any responsibility or liability including, without limitation, any liability arising from fault or negligence on the part of any person, for
any loss arising from the use of the Presentation Materials or its contents or otherwise arising in connection with it. Post 1989, exploration results detailed in this presentation have previously been reported to the ASX or in the
independent geologist report contained in the Prospectus lodged on 18 April 2019. Endowment = current resource plus production. Coordinate system on maps is MGA94 Zone55 unless otherwise stated.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee of Sky Metals Ltd
and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr. Davies consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
The information in this report that relates to the Mineral Resource Estimate was prepared by Luke Burlet, who is a Member and Chartered Professional (Geology) of the Australasian Institute of Geoscientists. Luke Burlet is a Director of
H & S Consultants and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr. Burlet consents to the inclusion in this report of the matters based on his information in the form and context in which it
appears.
ASX: SKY
2
EXPERIENCED AND PROVEN MANAGEMENT
NORMAN SECKOLD | Chairman
RICHARD HILL | Non-Executive Director
30+ years in the full-time management of natural
resource companies. Past Chairman and Director of
listed companies including Bolnisi Gold NL, Timberline
Minerals Inc., Perseverance Corporation Ltd, Valdora
Minerals NL, Palmarejo Silver, Kings Minerals NL,
Mogul Mining NL, Gold Corp and Santana Minerals Ltd.
Currently Chairman of both Nickel Industries Ltd and
Alpha HPA Ltd.
25+ years experience in the mineral resources sector as a
geologist and solicitor. Mr. Hill has a successful track record
of guiding ASX listed mining companies from the exploration
and discovery phase through to development in a range of
commodities. These have included past roles as founding
Director for Aurelia Metals Ltd and as Chairman of Genesis
Minerals Ltd as well as current Chairman of New World
Resources Ltd and Accelerate Resources Ltd.
RIMAS KAIRAITIS | Non-Executive Director
OLIVER DAVIES | MANAGING DIRECTOR
25+ years experience in minerals exploration and resource
development in gold, base metals and industrial minerals.
In his most recent role, Mr. Kairaitis was founding Managing
Director and CEO of Aurelia Metals (ASX: AMI), which he
steered from a junior exploration company to a profitable
NSW based gold and base metals producer. Mr. Kairaitis is
also the Managing Director of Alpha HPA Limited.
Geologist with SKY since listing in 2019. Previously in
exploration and operational roles with Evolution Mining
and Alkane Resources in NSW and Qld. Mr. Davies has
worked closely on several successful NSW discoveries
including Evolution Mining’s significant expansion of the
Lake Cowal gold resource and Alkane’s exploration success
at Tomingley and Boda.
CAPITAL STRUCTURE
Shares on issue
Options & Performance Rights
Share price (28 Oct 2024)
Market capitalisation
Cash (30 June 2024)
Debt
589.6M
49.9M
~$0.056
~$33.0M
~$3.26M
Nil
BOARD & MANAGEMENT
Norm Seckold
Richard Hill
Rimas Kairaitis
Richard Willson
Oliver Davies
Chairman
Non-Executive Director
Non-Executive Director
Company Secretary
Managing Director
EXPERT GUIDANCE | SKY’s Consultants
SHAREHOLDERS
Tallebung Environmental Mining Approvals: R.W. Corkery & Co. to advise on best practice for environmental studies and mining approvals process.
Tallebung Metallurgy – Gunn Metallurgy, TOMRA Ore Sorting Solutions and ALS Burnie engaged to conduct metallurgical testwork.
Tallebung Resource Estimation – H&SC modelled and estimated the MRE and Exploration Target.
Aurelia Metals
Board and Management
Top 20 holders
ASX: SKY
3.2%
9%
47.5%
3
Tin is vital within EVs,
Renewable Energy, AI
and all electronics.
Tin Price
Fundamental
structural demand
growth – Triggering
supply crunch after
30+ year under
investment.
Increase in tin demand
TIN: VITAL TECHNOLOGY METAL
Source: BNEF, Rho Motion, Macquarie Strategy – April 2024
ASX: SKY
4
TIN: THE FORGOTTEN ELECTRIFICATION METAL
– GLOBAL SUPPLY DISRUPTIONS
Global Tin Supply by
Country (tpa)
• Inelastic tin price – driven by irreplaceable
demand in electronics sector, AI and global
electrification.
• Heavily disrupted Indonesian tin production –
previously 20% of global supply.
• Tin mining suspended in Myanmar
–
previously 4th largest source globally and over
40% of concentrate supply to China.
• Limited reliable and ethical sources.
• Very few tin investment options on ASX
Source: ITA
Source: ITA
ASX: SKY
5
MAJOR HISTORIC TIN OPERATION
TALLEBUNG TIN PROJECT
•
Tin discovered in the 1890s and mined into
the mid-1980s.
•
Small shafts and open pits mined hardrock tin
veins, culminating in large scale alluvial mining
production in the 1960s-70s.
•
Infrastructure already in place from previous
mining includes:
-
Tallebung Tin Mine – Aerial Image of Historic Mining and Infrastructure.
Powerlines to site.
Excellent road access.
•
Hard-rock tin source remains intact and largely
unmined.
•
Large scale tin deposit now defined over
1.7km and still growing.
ASX: SKY
6
EVOLVING HIGH-GRADE TIN
Discoveries
•
New shallow, high-grade intercepts in TBRC078 and TBRC090
show potential for shallow, higher-grade tin outside of the
current MRE, results included:
11m @ 1.02% Sn, 77.9g/t Ag & 0.13% W from 64m
10m @ 0.69% Sn & 23.7g/t Ag from 23m
•
Southern extension drilling has intercepted further shallow,
higher-grade tin with developing continuity, results include:
6m @ 0.59% Sn & 28.8g/t Ag from 50m
7m @ 0.58% Sn from 62m
•
0.58% Sn equates to ~2% Cu, before ore sorting.
•
Additionally, TBRC090 has intercepted very shallow, highergrade tin, showing the potential for resource extensions down
dip, beyond the eastern edge of the MRE.
•
Results continue to demonstrate deposit remains open in all
directions.
ASX: SKY
7
TALLEBUNG TIN PROJECT
Tallebung Tin Mine – Drone Photo looking East down the
Central Lead Open Pit.
• Low-Cost Mining Proposition – Shallow
deposit at surface, very low strip ratio and
deposit grows with every new drillhole.
• Exceptional Upgrade– Ore sorting ideally
suited to the deposit and increases grade
>5x, removing 80% of mined mass.
• Low-Cost Processing – Simple gravity circuit
for a saleable tin concentrate.
• High Payability on Tin Concentrate – over
90% payability on a +60% tin concentrate.
ASX: SKY
8
GROWING LARGE HARDROCK TIN
RESOURCE
• Existing MRE updated Jan 2024, totalling:
15.6 Mt @ 0.15% Tin for 23kt of contained Tin.
• Exploration Target estimated concurrently:
23 – 32 Mt @ 0.14 – 0.17% Tin
• Tin mineralisation highly amenable to 5x upgrade
using TOMRA Ore Sorting – 0.15% = +0.70% Tin.
• 0.70% Tin equivalent to +2.7g/t Au or +2.4% Cu.
• Recent higher-grade expansion not included in the
MRE or Exploration Target estimates.
• Maiden Indicated MRE:
5.00 Mt @ 0.16% Tin for 7.93kt of contained Tin.
Schematic Plan View - Tallebung Tin Mine
Highlight drill intercepts and TOMRA ore sorting results.
ASX: SKY
9
TOMRA– HIGH TECHNOLOGY CHANGES
THE GAME
Cassiterite from Tallebung – Scale
in mm
• Tallebung tin deposit is ideally matched to ore
sorting technology.
Dense tin – cassiterite “nuggets” detected by
ore sorter and accepted
• Conservative TOMRA Ore Sorting increases grade
+500% and rejects +80% of mass.
Host rock and quartz vein without tin
rejected by ore sorter
• Resource grade increases from 0.15% Tin x 5 = to
over 0.70% Tin with +98% tin recovery.
• Recent aggressive ore sorting results shows:
44x grade increase, 0.10% Tin upgraded to
4.42% Tin,
98% upfront mass rejection,
83% Tin recovery
• Reduced mass means smaller, lower plant costs
to produce a saleable tin concentrate.
Schematic of a TOMRA XRT Ore
Sorter
Rejected
Accepted
ASX: SKY
10
TOMRA– HIGH TECHNOLOGY CHANGES
THE GAME
• Extremely effective sorting of
Tallebung Tin is possible as Tin is
present as large, discrete ‘chunks’,
easily classified by the TOMRA XRT
ore sorter.
• Initial, conservative ore sorting
aimed to accept all rocks with Tin
shown in the scan – this gave an
average of 5x upgrade with +98%
Tin recovery and +80% mass
rejection.
• Latest aggressive ore sorting aim
for just large Tin responses and
ignored smaller Tin grains – this
gave a 44x upgrade with an 83%
Tin recovery and 98% mass
rejection.
ASX: SKY
11
SHALLOW, HIGHER-GRADE START UP
• Shallow, at surface high-grade tin zone identified for fast
payback potential at commencement of mining.
• Results within the high-grade zone include:
TBD002: 60.2m @ 0.54% Tin from 12.8m.
TBD003: 60.55m @ 0.36% Tin from 23m.
Schematic Cross-Section of Shallow High-Grade Zone
Plan View Aerial Image of the Tallebung Project
ASX: SKY
12
TALLEBUNG TIN PROJECT
LOW-RISK PATHWAY SET TO ADD VALUE
QUICKLY
ASX: SKY
13
BUILDING AUSTRALIA’S
FUTURE TIN PRODUCTION
ASX: SKY
SKYMETALS.COM.AU
Share your feedback
Discover