Tallebung Tin Project - Drilling Update
Released
Released
Announcement PDF
ASX: SKY
ASX ANNOUNCEMENT
17 July 2024
TALLEBUNG TIN PROJECT – DRILLING UPDATE
DEPOSIT SIGNIFICANTLY EXPANDED AND REMAINS OPEN
Assay results for the remaining 15 RC holes have now been returned with all results
now received for the 29-hole RC program. The latest results include:
TBRC090:
10m @ 0.69% tin & 23.7g/t silver from 23m, including;
2m @ 2.68% tin & 51.4g/t silver from 28m
TBRC091:
12m @ 0.37% tin & 13.2g/t silver from 58m, including;
2m @ 0.67% tin & 72.6g/t silver from 58m, and
3m @ 0.97% tin from 67m.
TBRC088:
18m @ 0.19% tin & 60.5g/t silver from 104m, including;
1m @ 2.14% tin & 113g/t silver from 105m
These strong results have successfully infilled and expanded the deposit footprint at
Tallebung with an additional 170m strike extension discovered to the north of the
deposit – mineralisation remains open in all directions.
Assay results are still pending for the 5 diamond drillholes completed in this program.
The second phase drilling campaign is planned to commence next week, beginning
with 12 RC holes to build on the high-grade tin discovered in the 150m step out to the
south, where results included:
TBRC078: 11m @ 1.02% tin, 77.9g/t silver & 0.13% tungsten from 64m
This drilling is expected to take approximately 3 weeks with assays for this high-grade
extension drilling expected by early September.
SKY CEO Oliver Davies commented: “This latest drilling program has exceeded our expectations. First, with the
high-grade tin discovered on a 150m strike extension to the south, then the exceptional grades intercepted under
the southern lead open pit, and now with the expansion of the deposit in the north, east and west.
This program has added over 300m of strike to the Tallebung tin deposit, which now extends for 1700m and remains
open in all directions.
We are excited to resume drilling to expand the high-grade hit on the southern margin of Tallebung. The discovery
of more high-grade mineralisation will further propel Tallebung as an exciting prospect for future tin supply.“
SKY METALS LIMITED
+61 2 6360 1587
2 HAWTHORN PLACE, ORANGE NSW 2800
WWW.SKYMETALS.COM.AU
ABN 46 098 952 035
The Board of Sky Metals Limited (‘SKY’ or ‘The Company’) is pleased to announce the final batch of assay results
from the resource expansion drilling program at the Tallebung Tin Project, NSW.
TALLEBUNG PROJECT (EL 6699, SKY 100%)
CENTRAL INFILL AND NORTHERN EXPTENSION DRILLING
The final batch of assay results from the latest RC drilling have now been received with results for all 29 RC holes
now returned. Results for the first 14 holes of the RC program, namely TBRC074-TBRC087, were announced
previously (please see SKY:ASX Announcement 5 June 2024 and 25 June 2024). These latest results from holes
TBRC088-TBRC102 were designed to test for extensions to the north of the known deposit and to infill the central
area of the existing Tallebung deposit and MRE.
Figure 1: Tallebung Tin Project – Plan showing the current boundary of the MRE outlined in the dashed red line
with new intercepts shown in yellow. Highlight intercepts from past drilling are also shown and new planned
holes are shown in red, recently drilled diamond holes with assays still pending are in orange.
The first of these latest results from hole TBRC088 were designed to extend mineralisation to the west of the known
deposit where untested historic workings have been uncovered. TBRC088 intercepted further strong tin
2
mineralisation, including a broad tin and silver mineralised envelope with higher-grade tin intercepts within,
results included:
TBRC088:
9m @ 0.15% Sn, 97.5g/t Ag, 0.15% W, 0.10% Cu & 1.61% Zn from 73m, and;
2m @ 0.58% Sn, 55.1g/t Ag, 0.04% W, 2.16% Zn & 0.04% Cu from 89m, and;
18m @ 0.19% Sn, 60.5g/t Ag, 0.04% W, 0.29% Zn & 0.08% Cu from 104m, including;
2m @ 2.14% Sn, 113g/t Ag, 0.02% W, 1.64% Zn & 0.18% Cu from 105m, and;
TBRC089 was drilled to test under historic working north of the central lead open pit where previous drilling is
shallow and extremely sparse. Additionally, hardrock historic workings were untested at depth in this area. Strong
tin mineralisation was intercepted close to surface and interpreted to coincide with the veins mined in the historic
working at surface. This hole successfully increased the depth and strike of tin mineralisation and results included:
TBRC089:
11m @ 0.21% Sn, 5.58g/t Ag & 0.02% W from 35m, including;
1m @ 1.49% Sn, 16.2g/t Ag & 0.08% W from 39m.
TBRC090 and TBRC091 were then collared in the north of the southern lead open pit to test the northern extension
of the higher-grade tin mineralisation intercepted in TBRC083, TBRC084 and TBRC085 (best results included 11m
@ 0.38% Sn & 69.0g/t Ag from 53m (TBRC084), 9m @ 0.40% Sn & 57.1g/t Ag from 63m (TBRC085) reported previously
in SKY:ASX Announcement 25 June 2024). Both holes intercepted high-grade, strong tin mineralisation close to
surface, results included:
TBRC090:
10m @ 0.69% Sn, 23.7g/t Ag & 0.03% W from 23m, including;
2m @ 2.68% Sn, 51.4g/t Ag & 0.06% W from 28m.
TBRC091:
12m @ 0.37% Sn, 13.2g/t Ag & 0.04% W from 58m, including;
2m @ 0.67% Sn, 72.6g/t Ag & 0.15% W from 58m, and;
3m @ 0.97% Sn & 0.06% W from 67m.
4m @ 0.34% Sn, 22.4g/t Ag 0.06% W & 0.43% Zn from 171m.
Drilling then moved back to the north extensions with TBRC092 drilled to test mineralisation on the southern edge
of the central lead open pit. TBRC092 successfully intercepted further tin mineralisation which has further
increased the mineralised footprint at Tallebung and demonstrates the deposit remains open to the west, results
included:
TBRC092:
9m @ 0.23% Sn, 10.3g/t Ag & 0.02% W from 98m, including;
1m @ 1.78% Sn, & 0.12% W from 98m.
A series of holes, TBRC094, TBRC095 and TBRC096 were drilled to infill drilling between historic holes to the south
and two modern diamond drillholes to the north (the previously northernmost drilling at Tallebung, TD001 and
TD002). These holes all successfully intercepted further tin mineralisation. Results included:
TBRC094:
2m @ 0.28% Sn from 15m.
12m @ 0.15% Sn, 6.82g/t Ag & 0.04% W from 25m, including;
1m @ 1.14% Sn & 0.53% W from 34m
2m @ 0.23% Sn from 44m.
2m @ 0.28% Sn, 10.8g/t Ag & 0.02% W from 56m.
TBRC095:
21m @ 0.15% Sn, 26.3g/t Ag & 0.04% W from 0m, including;
1m @ 1.16% Sn, 0.34% W & 39.6g/t Ag from 4m.
3
11m @ 0.11% Sn, 15.8g/t Ag & 0.05% W from 49m, including;
1m @ 0.46% Sn, 105g/t Ag, 0.16% W & 0.20% Cu from 59m.
8m @ 0.18% Sn, 47.7g/t Ag, 0.93% Zn & 0.08% Cu from 107m, including;
2m @ 0.48% Sn, 89.4g/t Ag, 0.02% W, 0.10% Cu & 1.01% Zn from 113m.
5m @ 0.28% Sn from 165m, including;
1m @ 1.05% Sn & 0.31% Zn from 165m.
TBRC096:
7m @ 0.11% Sn from 2m, including;
1m @ 0.55% Sn from 8m.
5m @ 0.14% Sn, 6.20g/t Ag & 0.03% W from 122m, including;.
1m @ 0.53% Sn, 0.12% W, 24.2g/t Ag & 0.70% Zn from 122m.
To explore and extend the deposit to the north, TBRC097 and TBRC098 were drilled over 170m further north than
any previous drilling of the Tallebung deposit. These holes have established that the tin mineralisation extends
well north of the previous drilling, extending the deposit by over 170m along strike in the north and confirming the
deposit remains open along strike and both to the east and west. Results included:
TBRC097:
5m @ 0.17% Sn from 110m, including;
2m @ 0.39% Sn & 0.03% W from 110m.
Finally, drilling was completed to infill south of the southern lead open pit and test for mineralisation under the
central open pit with TBRC100, TBRC101 and TBRC102. Results included:
TBRC100:
11m @ 0.19% Sn, 14.8g/t Ag & 0.03% W from 30m, including;
1m @ 0.85% Sn, 72, 0.05% W & 72.2g/t Ag from 35m.
6m @ 0.17% Sn & 0.30% Zn from 123m.
1m @ 0.88% Sn, 0.07% W & 1.23% Zn from 128m.
This RC program has successfully expanded the mineralisation at Tallebung, as well as discovered further highergrade areas very close to surface, bolstering the existing resources.
The results will have significant impact on future mine scheduling and SKY will now quickly move to infill the
exceptional, high-grade tin mineralisation intercepted in TBRC078 on the southern edge of the current drilling at
Tallebung.
NEXT STEPS
Follow up drilling will resume in the coming week to quickly build on the discovery of the high-grade tin
mineralisation on the southern margin of the current drilling, intercepted in TBRC078. Figure 1 shows the planned
locations of these approved drillholes.
This southern high-grade extension and infill program is planned to commence in the coming week and take at
least 3-4 weeks with first results anticipated by early September.
Additionally, assay results from the diamond drilling program are also anticipated over the coming weeks
4
Table 1: Tallebung Project – Drillhole Collar Details.
Hole ID
Easting
(MGA)
Northing
(MGA)
RL (m)
DIP
Azimuth
(MGA)
Total
Depth
(m)
Comment
TBRC088
TBRC089
TBRC090
TBRC091
TBRC092
TBRC093
TBRC094
TBRC095
TBRC096
TBRC097
TBRC098
TBRC099
TBRC100
TBRC101
TBRC102
460388.76
460284.59
460684.02
460680.62
460371.25
460594.63
460259.44
460131.5
460194.63
459991.2
460168.02
460569.21
460649.72
460427.59
460370.77
6376865.84
6377165.79
6376850.31
6376755.15
6377020.95
6377059.81
6377262.74
6377212.64
6377223.2
6377465.52
6377466.28
6377157.72
6376604.56
6377148.61
6377120.09
291.63
284.16
276.96
275.57
284.81
283.11
285.4
295.38
290.18
288.01
286.21
274.04
283.44
266.35
268.35
-59.75
-59.74
-59.85
-60.0
-60.14
-59.92
-60.15
-59.93
-60.03
-60.07
-59.9
-59.66
-56.99
-59.92
-59.93
251.81
267.47
250.54
236.92
262.41
257.57
267.69
248.49
248.14
251.54
249.31
250.06
263.8
250.28
250.78
148
198
180
180
198
168
180
198
204
186
198
180
198
168
180
Abandoned; Excessive water
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Complete
Abandoned; Excessive Water
Complete
Complete
Complete
Complete
Complete
Table 2: Tallebung Project – Significant Intercepts.
Hole ID
TBRC088
including
including
TBRC089
including
including
including
TBRC090
including
including
TBRC091
including
including
and
including
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
43
73
89
104
105
24
35
39
75
82
131
134
0
17
23
28
43
50
53
56
75
162
7
23
27
58
58
67
150
152
(m)
137
82
91
122
106
25
46
40
86
83
136
136
1
18
33
30
46
51
57
57
77
163
9
28
28
70
60
70
153
153
(m)
94
9
2
18
1
1
11
1
11
1
5
2
1
1
10
2
3
1
4
1
2
1
2
5
1
12
2
3
3
1
%
0.09
0.15
0.58
0.19
2.14
0.29
0.21
1.49
0.07
0.16
0.14
0.3
0.14
0.21
0.69
2.68
0.08
0.02
0.24
0.58
0.09
0.13
0.11
0.2
0.73
0.37
0.67
0.97
0.32
0.84
%
0.05
0.15
0.06
0.04
0.02
0.03
0.02
0.08
0.02
0.04
0.09
0.03
0.06
0.02
0.85
0.03
0.03
0.03
0.04
0.15
0.06
-
g/t
27.9
97.5
55.1
60.5
113
12.8
5.58
16.2
8.89
62.7
23.7
51.4
7.98
7.29
13
13.2
13.15
72.6
-
%
0.04
0.1
0.04
0.08
0.18
-
%
0.29
1.61
1.1
0.29
1.64
0.35
-
5
Comment
Hole ID
TBRC092
including
including
TBRC093
TBRC094
including
TBRC095
including
including
including
and
including
TBRC096
including
including
TBRC097
including
TBRC098
TBRC099
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
171
3
46
53
56
78
98
98
123
130
85
15
25
34
44
56
71
110
0
4
49
59
66
80
107
107
113
129
154
165
165
2
8
25
35
42
59
64
122
122
169
20
30
74
82
93
96
110
110
143
36
65
0
(m)
175
4
49
57
57
79
107
99
124
133
86
17
37
35
46
58
72
111
21
5
60
60
73
81
115
109
115
131
155
170
166
9
9
26
36
43
60
66
127
123
171
21
31
75
85
94
97
115
112
144
37
66
3
(m)
4
1
3
4
1
1
9
1
1
3
1
2
12
1
2
2
1
1
21
1
11
1
7
1
8
2
2
2
1
5
1
7
1
1
1
1
1
2
5
1
2
1
1
1
3
1
1
5
2
1
1
1
3
%
0.34
0.25
0.1
0.1
0.16
0.26
0.23
1.78
0.61
0.13
0.3
0.28
0.15
1.14
0.26
0.28
0.35
0.12
0.15
1.16
0.11
0.46
0.09
0.31
0.19
0.23
0.48
0.14
0.4
0.28
1.05
0.11
0.55
0.13
0.39
0.1
0.17
0.12
0.14
0.53
0.15
0.15
0.12
0.23
0.14
0.16
0.13
0.17
0.38
0.12
1.28
0.61
0.06
%
0.06
0.09
0.42
1.63
0.05
0.02
0.12
0.12
0.09
0.06
0.53
0.02
0.08
0.04
0.34
0.05
0.16
0.03
0.56
0.02
0.02
0.05
0.07
0.03
0.12
0.02
0.03
0.04
0.03
-
g/t
22.4
19
9.72
21.3
10.3
72.6
34.2
6.82
10.8
8.17
43.2
26.3
39.6
15.8
105
12.8
44.6
47.7
94.5
89.4
5.1
7.34
7.13
6.2
24.2
6.36
11.4
7.71
-
%
0.06
0.34
0.05
0.2
0.14
0.08
0.18
0.1
0.12
-
%
0.43
2.23
0.2
1.48
0.93
2.43
1.01
1.72
0.31
0.7
-
6
Comment
Hole ID
TBRC100
including
including
TBRC101
TBRC102
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
34
48
0
11
30
35
55
123
128
31
56
80
131
140
27
158
(m)
42
56
1
12
41
36
56
129
129
32
60
82
133
143
29
161
(m)
8
8
1
1
11
1
1
6
1
1
4
2
2
3
2
3
%
0.12
0.26
0.19
0.85
0.1
0.17
0.88
0.37
0.19
0.09
0.1
0.13
0.28
0.34
%
0.06
0.08
0.03
0.05
0.07
0.05
0.02
-
g/t
14.8
72.2
33.9
6.62
23
8.84
-
%
-
%
0.3
1.23
-
7
Comment
This report has been approved for release by the Board of Directors.
ABOUT SKY (ASX: SKY)
SKY is an ASX listed public Company focused on the exploration and development of high value mineral resources in Australia.
SKY’s project portfolio offers exposure to the tin, gold, and copper markets in the world class mining jurisdiction of NSW.
TIN PROJECTS
TALLEBUNG PROJECT (EL6699, 100% SKY)
The Tallebung Project is located ~70km north-west of Condobolin in central NSW. The project encompasses the historic
Tallebung Tin Mining Field at the northern extent of the Wagga Tin Belt within the central Lachlan Orogen where SKY has an
updated MRE of 15.6Mt @ 0.15% Tin*. SKY plans to advance the Tallebung by increasing the resource to the 23-32Mt1
Exploration Target and progress development for future mining (1SKY:ASX Announcement 23 January 2024).
DORADILLA PROJECT (EL6258, 100% SKY)
The Doradilla Project is located ~ 30km south of Bourke in north-western NSW and is a large and strategic REE and tin
project with excellent potential for associated polymetallic mineralisation (tungsten, copper, bismuth, indium, nickel, cobalt).
NARRIAH PROJECT (EL9524, 100% SKY)
The Narriah Project is located ~70km west of West Wyalong in western NSW represents a large tin project with multiple
historic workings prospective for tin, tungsten and lithium mineralisation with limited drill testing Completed to date.
COPPER GOLD PROJECTS
IRON DUKE (EL6064, EL9191 100% SKY)
The Iron Duke project is located ~10km southeast of Tottenham in central NSW and covers
at least 4 significant historic copper-gold
mines.
High
grade
copper-gold
mineralisation intersected by previous
explorers (e.g. 13m @ 1.56% Cu & 4.48g/t Au).
GALWADGERE (EL6320, 100% SKY –
BML: OPTION TO PURCHASE)
The Galwadgere project is located ~15km
south-east of Wellington in central NSW. An
MRE of 3.6Mt @ 0.78% Cu and 0.28g/t Au at
Galwadgere with numerous targets with
limited drilling testing adjacent to the MRE.
GOLD PROJECTS
CULLARIN / KANGIARA projects (EL7954;
EL8400 & EL8573, 80% SKY-DVP JV)
The Cullarin Project contains equivalent host
stratigraphy to the McPhillamys deposit with
a similar geochemical, geophysical &
alteration signature. ‘McPhillamys-style’ gold
results from previous drilling at the Cullarin
Project. SKY’s maiden drill program was
successful, including HUD002 which returned
93m @ 4.2 g/t Au from 56m.
CALEDONIAN PROJECTS (EL8920 &
EL9120 100% SKY)
Highlight, ‘McPhillamys-style’ gold results
from previous exploration include 36m @ 1.2
g/t Au from 0m to EOH in drillhole LM2 and
81m @ 0.87g/t Au in a costean on EL8920 at
the Caledonian Project.
Figure 2: SKY Tenement Location Map
8
Competent Persons Statement
The information in this report that relates to Exploration Results and Results which underpin the Mineral Resource
Estimate is based on information Compiled by Mr. Oliver Davies, who is a Member of the Australasian Institute of
Geoscientists. Mr. Oliver Davies is an employee of Sky Metals Ltd and has sufficient experience which is relevant
to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking
to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting of
Exploration Results, Mineral Resources and Ore Reserves.’ Mr. Davies consents to the inclusion in this report of
the matters based on his information in the form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www. asx.Com.au). The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves
and resources, production levels and rates, costs, prices, future performance or potential growth of Sky Metals
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Sky Metals Ltd.
Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may
differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been
prepared in accordance with the Australasian Code for Reporting of Exploration Results, Minerals Resources and
Ore Reserves JORC Code 2012.
9
JORC CODE, 2012 - TABLE 1
Section 1 Sampling Techniques and Data – TALLEBUNG PROJECT
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling techniques
Explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry RC Drilling – the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
standard measurement tools appropriate to the minerals under investigation, such as downhole for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
the time of drilling.
gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
For RC drilling, assay standards or blanks are inserted at least every 50 samples.
All sample lab received weights show consistency with recovery and interval length.
Aspects of the determination of mineralisation that are Material to the Public Report. In cases Each sample was dried, crushed and pulverised as per standard industry practice.
where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a RC Drilling – the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
30 g charge for fire assay’). In other cases, more explanation may be required, such as where
for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
there is coarse gold that has inherent sampling problems. Unusual Commodities or
the time of drilling. Where mineralisation has not been logged, 4m Composites have been made by using
mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information. a spear to Combine equal amounts of samples from each 1m calico.
The primary metal of interest, tin (Sn) and also tungsten (W) were determined by lithium borate fusion
XRF (method ALS – ME-MS85) – considered appropriate for these elements. Multielement assaying was
Completed for 48 elements by 0.25g four-acid digest with ICPMS determination (method ALS – MEMS61)
Reverse circulation (RC) drilling using 110mm rods, 144mm face sampling hammer.
Drilling techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by what method, etc)
Drill sample recovery
Method of recording and assessing core and chip sample recoveries and results assessed.
RC drilling - high capacity RC rig was used to enable dry samples collected. Drill cyclone is cleaned
Measures taken to maximise sample recovery and ensure representative nature of the samples. between rod changes and after each hole to minimise cross-hole contamination.
Whether a relationship exists between sample recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of fine/coarse material
Sample weights are recorded for each sample. Recoveries were generally excellent and consistent,
however, if samples were wet the recoveries were less consistent.
There is no known relationship between sample recovery and grade. Where samples recoveries are less
than 95% there is no relationship observed between grade and sample recovery. Relationships between
sample recovery and grade are not considered significant where recoveries exceeded 95% in fresh rock.
10
Criteria
Logging
Explanation
Commentary
Whether core and chip samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography
The total length and percentage of the relevant intersections logged
Systematic geological and geotechnical logging was undertaken when the holes were originally drilled.
Data collected includes:
Nature and extent of lithologies.
Relationship between lithologies.
Amount and mode of occurrence of ore minerals.
Location, extent, and nature of structures such as bedding, cleavage, veins, faults etc.
Structural data (alpha & beta) are recorded for orientated core.
Geotechnical data such as recovery, RQD, fracture frequency, qualitative IRS, microfractures, veinlets and
number of defect sets. For some geotechnical holes the orientation, nature of defects and defect fill are
recorded.
Both qualitative and quantitative data is collected.
RC chips, half core (HQ) & ¾ core (PQ) samples are retained in trays for future reference.
A representative sample of each one metre RC interval is retained in chip trays for future reference.
All chips were geologically logged.
Sub-sampling techniques
and sample preparation
If core, whether cut or sawn and whether quarter, half or all core taken
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry
For all sample types, the nature, quality and appropriateness of the sample preparation
technique
Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples
Measures taken to ensure that the sampling is representative of the in-situ material collected,
including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled
RC drilling - the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
the time of drilling. Where 4m Composites have been made, a spear is used to split equal amounts of
each metre into the 4m Composite.
Samples were dried crushed and pulverised to 90% passing 75 microns. This is considered to
appropriately homogenise the sample to allow subsampling for the various assay techniques.
SKY: Certified Reference Material (CRM) and blanks were inserted at least every 50 samples to assess the
accuracy and reproducibility of the drill core results. The results of the standards were to be within ±10%
variance from known certified result. If greater than 10% variance the standard and up to 10 samples
each side were re-assayed. SGS conducted internal check samples every 20 for multielement assay.
RC drilling - duplicate samples are collected of re-split intervals. Duplicates generally show excellent
repeatability.
Sample sizes are industry standard and considered appropriate
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the assaying and laboratory procedures used and
Standard assay procedures performed by a reputable assay lab, (ALS), were undertaken. Forty-eight
whether the technique is considered partial or total
elements Ag, As, Cu, Fe, Pb, S, Zn are digested by four-acid digest then analysed by ICPMS (method MEFor geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in
MS61).
determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc
Sn and W assays were generated by lithium borate fusion XRF (method ME-MS85) – considered
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
appropriate for these elements.
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have
been established
No geophysical tools were used in the determination of assay results.
Certified reference material or blanks were inserted at least every 50 samples. Standards are purchased
11
Criteria
Explanation
Commentary
from Certified Reference Material manufacture Companies: Standards were purchased in foil lined
packets of between 60g and 100g. Different reference materials were used to cover high grade, medium
grade, low grade, and trace ranges of elements, with a primary focus on Sn and Cu.
Verification of sampling
and assaying
Drill data is Compiled and collated and reviewed by senior staff. External consultants do not routinely
The verification of significant intersections by either independent or alternative Company
verify exploration data until resource estimation procedures are deemed necessary. The intersection
personnel.
calculations were viewed by >1 geological personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data storage (physical
Twinned holes have been used by past explorers to validate the results achieved and have confirmed
and electronic) protocols.
these historic results.
Discuss any adjustment to assay data
Drill Hole Data including: meta data, any gear left in the drill hole, lithological, mineral, survey, sampling,
magnetic susceptibility was collected and stored as physical and electronic copies or entered directly into
an excel spread sheet using drop down codes. When Complete the spreadsheet was Combined into a
master excel spreadsheet as the drill hole database.
Assay data was provided by ALS via .csv spreadsheets. The data was validated using the results received
from the known certified reference material. Hard copies of the assay certificates were stored with drill
hole data such as drillers plods, invoices, and hole planning documents.
Assay data is not adjusted.
Location of data points
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
Specification of the grid system used
Quality and adequacy of topographic control
Historic drill hole collars were located using either a licenced surveyor or on a local imperial or metric
grid. Conversion of the local grid co-ordinates has been undertaken by previous exploration Companies.
SKY has used DGPS surveying of drillholes (± 0.1m) to accurately locate them.
All coordinates are based on Map Grid Australia Zone 55E, Geodetic Datum of Australia 1994.
Historic drill hole collars were located using either a licenced surveyor or on a local imperial or metric
grid. SKY has used DGPS surveying of drillholes (± 0.1m) to accurately locate them, or handheld GPS (+/3m). Where handheld GPS has been used, SKY will DGPS them at a later date.
Data spacing and
distribution
Data spacing for reporting of Exploration Results
At this stage, drilling of the MRE area of the project has been drilled to at least approximately 80m x 80m
Data spacing for reporting of Exploration Results Whether the data spacing, and distribution is down to 40m x 40m for inferred and indicated resources respectively. Outside of the MRE are, data
sufficient to establish the degree of geological and grade continuity appropriate for the Mineral spacing is variable as the focus is on geological mapping and identifying new zones of mineralisation.
Resource and Ore Reserve estimation procedure(s) and classifications applied
Whether sample Compositing has been applied
The maiden MRE was estimated to inferred and indicated and increases in resource confidence will
require tighter spaced drilling, such as some of the drilling completed in this program.
Sample Compositing is not applied.
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible structures and the Drilling was orientated to cross the mineralisation trend at moderate to high angles, perpendicular to
extent to which this is known, considering the deposit type
mineralisation. The use of orie
Share your feedback
Discover