Significant New Extensions Discovered at Tallebung
Released
Released
Announcement PDF
ASX: SKY
ASX ANNOUNCEMENT
9 February 2026
SKY METALS LIMITED
+61 2 6360 1587 2 HAWTHORN PLACE, ORANGE NSW 2800 WWW.SKYMETALS.COM.AU ABN 46 098 952 035
Watch a video summary of this announcement & engage with SKY here
Tallebung Tin Project, NSW
– Exploration Update
SIGNIFICANT NEW EXTENSIONS DISCOVERED IN RECENT
DRILLING AND
SURFACE SAMPLING
New south
-eastern extensionhighlights the outstanding growth potential at Tallebung
• Extensional drilling has intersected prospective quartz‑vein structures beneath an
extensive soil‑sampling anomaly, confirming the potential for repetitions of the Tallebung
mineralisation to the south‑east.
• Tin‑cassiterite-bearing rock chips1
have been collected from newly identified historical
workings, revealed in a recent airborne LiDAR survey flown by the Company, further
supporting the discovery of new mineralised zones for imminent drill testing.
• Results provide further strong evidence that the Tallebung system remains open in all
directions, with significant potential for continued growth beyond the current Resource
footprint.
• Drill testing of these new targets will now be incorporated into the major ongoing drilling
campaign, with two Reverse Circulation (RC) drill rigs currently operating on site.
• Ongoing RC drilling continues to grow high‑grade tin-silver-tungsten zones, while also
completing key in-fill drilling required to support the upcoming Mineral Resource Estimate
(MRE) update, scheduled for next quarter.
• The updated MRE and associated mining studies remain on track for release in the first half
of this year, incorporating what is anticipated to be more than 400 drill-holes (up from 115
holes in the existing MRE), underlining the potential for a step‑change in resource size and
confidence.
SKY Managing Director & CEO Oliver Davies commented: “Our ongoing drilling and sampling campaign continues
to reinforce the outstanding growth potential of the Tallebung Tin‑Silver‑Tungsten Project, highlighting the exciting
upside as we establish Tallebung as a major near‑term development opportunity. The combination of recent
surface sampling, the discovery of new cassiterite‑bearing rock chips and successful extensional drilling
continues to define new tin mineralisation well beyond the margins of the current Resource. This expanding
footprint highlights the growing scale of the system and the opportunity for further high‑grade discoveries.
“With two RC rigs turning, SKY is driving the project towards an upcoming updated MRE and, concurrently, rapidly
advancing the technical foundations required for mine planning and to progress mining approvals.”
1
In relation to the disclosure of visible mineralisation, the Company cautions that visual estimates of mineral abundance should never be
considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest.
Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations. The
Company will update the market when laboratory analytical results become available, expected later this month.
2
Figure 1: Plan showing the location of newly discovered surface sampling anomalies. Bottom LHS insert: Rock chip samples from newly identified historical
workings, well south of current deposit footprint. RHS insert: Drill chips with prospective quartz veined intervals 39-69m, successfully intercepted under new soil
sampling anomaly. Drill-hole collars, previously reported highlight drill intercepts and the limits of the existing Tallebung MRE are shown over surface geology.
3
In relation to the disclosure of visual mineralisation, the Company cautions that visual estimates of mineral
abundance should never be considered a proxy or substitute for laboratory analyses where concentrations or
grades are the factor of principal economic interest. Visual estimates also potentially provide no information
regarding impurities or deleterious physical properties relevant to valuations. The Company will update the market
when laboratory analytical results become available, expected later this month.
Sky Metals Limited (ASX: SKY) is pleased to advise that recent drilling and surface sampling activities have
identified significant extensions of the known mineralisation at the Company’s flagship Tallebung Tin Project in
NSW, outlining new mineralised positions east and south‑east of the current Resource footprint.
TALLEBUNG TIN PROJECT (EL 6699, SKY 100%)
OUTSTANDING GROWTH POTENTIAL IDENTIFIED IN SURFACE SAMPLING AND CONFIRMED IN DRILL TESTING
The ongoing exploration program at Tallebung continues to deliver significant geological advances, with
extensional drilling and surface sampling revealing new zones of mineralisation located beyond the current limits
of the established Tallebung deposit (Figure 1).
These areas were initially highlighted by a robust soil anomaly and have now been validated through targeted
drilling, which successfully intersected prospective quartz‑vein structures consistent with the main tin‑bearing
vein system that hosts the majority of the mineralisation across the Project.
Recent rock‑chip sampling has further strengthened the growth potential of the system, confirming tin‑cassiterite
mineralisation at newly-identified historical workings discovered through SKY’s 2024 airborne LiDAR survey.
Figure 2: Plan showing the location of new rock chip samples relative to existing drilling on the LiDAR
topographic surface with the historical workings identified by the high relief shown on the LiDAR surface.
4
These previously unmapped workings sit within a broader structural corridor extending to the south‑east of the
current Resource area. The presence of cassiterite‑bearing tin mineralisation at surface indicates strong
geological continuity and reinforces the potential for significant strike extensions to the deposit. A LiDAR image
showing these workings, along with corresponding rock‑chip sample locations, is shown in Figure 2.
Soil sampling was completed on east‑west traverses at a 20m sample spacing along lines positioned 100m apart
in a north‑south orientation. Shallow pits approximately 10-15cm deep were excavated by hand, with material
homogenised prior to analysis using an Olympus Vanta pXRF instrument. Initial pXRF results were cross‑checked
with laboratory assays from ALS Orange and, due to the excellent correlation between the two datasets, the
broader program continued using pXRF analysis alone. Results from this soil program are presented in Figure 3.
Collectively, these new results show that the Tallebung deposit remains open in all directions. Historical drilling,
combined with SKY’s extensive 2025 multi‑rig program, consistently demonstrates the presence of high‑grade tin-
silver-tungsten mineralisation both within and beyond the margins of the existing MRE. The current campaign—
with two RC rigs operating continuously—is designed to systematically expand these high‑grade zones while
completing in-fill drilling required to support the upcoming updated Mineral Resource Estimate.
Figure 3: Plan showing the location of new rock chip samples, soil sampling results and new planned drill-holes
to test the new extensions discovered in the surface samples and latest drilling.
5
Work is now underway to integrate these new target areas into the active drilling schedule, ensuring that both
extensional and in-fill drilling components progress simultaneously. The significant dataset being generated,
including detailed geological logging, structural interpretation, and expanding geotechnical coverage, will directly
feed into ongoing mine design, mining studies and metallurgical modelling, maintaining SKY’s strong momentum
toward development readiness.
With the updated MRE and mining studies scheduled for release in the first half of this year, the Company is well
positioned to deliver a step‑change in both the scale and confidence of the Tallebung deposit.
The updated Resource will incorporate data from more than 400 drill holes, a transformative increase compared
to the 115 holes used for the current MRE, providing a robust foundation for feasibility‑level evaluation and future
development decisions.
This announcement is authorised for release by the Board of Sky Metals Limited.
Investors:
Oliver Davies – Managing Director & CEO
+61 (0) 430 359 547
Media:
Nicholas Read – Read Corporate
+61 (0) 419 929 046
JOIN SKY METALS’ INTERACTIVE INVESTOR HUB
Visit skymetals.com.au to interact with Sky Metals’ announcements and updates
To watch a video summary of this announcement & engage with SKY click here
About the Tallebung Tin Project (100% SKY)
Tallebung stands as an open-pit, technology enabled, near-term tin development project. Tallebung is uniquely
placed to provide secure tin supply, to feed irreplaceable and rapidly expanding tin demand, essential in semi-
conductors, electronics and solar PV technologies.
The Tallebung Tin Project is located at the site of large-scale historical tin mining in central Western NSW
where tin was first discovered in the 1890s. SKY is progressively defining a large-scale hardrock tin resource
with recent higher-grade tin zones discovered on the margins of the known deposit and exceptional
metallurgical performance demonstrated across the entire known deposit.
The shallow, open-pit tin veins combined with the ideal nature of the tin, hosted as large, discrete grains of
simple tin-oxide (cassiterite minerals), all ideally lends itself to low-cost tin production advantages, including
exceptional X-ray based ore sorting performance, demonstrated to upgrade the tin up to 44x, prior to low-cost
gravity separation to produce a saleable tin concentrate.
6
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver
Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee and
director of Sky Metals Ltd and has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves.’ Mr. Davies consents to the inclusion in this report of the matters based on his information in the
form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www.asx.com.au). The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves
and resources, production levels and rates, costs, prices, future performance or potential growth of Sky Metals
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Sky Metals Ltd.
Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may
differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been,
and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining,
and Metallurgy and Australian Institute of Geoscientists.
7
Table 1: Drillhole coordinates (MGA94 Zone 55).
Hole ID
Easting
(MGA)
Northing
(MGA)
RL (m) DIP
Azimuth
(MGA)
Total
Depth (m)
Comment
TBRC287 461015 6376010 297 -60 249 120 Complete
TBRC288 460965 6376027 296 -60 250 120 Complete
TBRC289 460940 6376060 295 -59 251 120 Complete
TBRC290 460931 6376088 294 -60 249 120 Complete
TBRC291 460959 6376108 294 -60 252 126 Complete
TBRC292 461008 6376153 293 -59 249 138 Complete
TBRC293 461066 6376197 292 -60 252 132 Complete
TBRC294 461068 6376145 292 -60 254 126 Complete
TBRC295 460930 6376270 291 -59 254 120 Complete
TBRC296 460904 6376242 293 -59 251 120 Complete
TBRC297 461009 6376205 291 -60 252 120 Complete
TBRC298 461025 6376090 293 -60 251 120 Complete
TBRC299 460887 6376180 296 -60 252 120 Complete
TBRC300 460901 6376206 294 -60 250 120 Complete
TBRC301 460851 6376217 296 -59 251 120 Complete
TBRC302 460829 6376245 297 -60 253 120 Complete
TBRC303 460652 6376675 275 -59 244 120 Complete
TBRC304 460640 6376694 275 -60 238 132 Complete
TBRC305 460670 6376697 277 -60 247 126 Complete
TBRC306 460677 6376714 275 -59 241 120 Pending Final Survey- Handheld GPS
TBRC307 460795 6376928 280 -60 250 120 Pending Final Survey- Handheld GPS
TBRC308 460690 6376594 286 -60 262 120 Pending Final Survey- Handheld GPS
TBRC309 460725 6376576 288 -60 253 120 Pending Final Survey- Handheld GPS
TBRC310 460727 6376545 288 -60 251 120 Pending Final Survey- Handheld GPS
TBRC311 460613 6376655 275 -59 247 120 Pending Final Survey- Handheld GPS
TBRC312 460770 6376973 280 -60 252 120 Pending Final Survey- Handheld GPS
TBRC313 460879 6376989 280 -60 251 120 Pending Final Survey- Handheld GPS
TBRC314 460838 6376480 289 -60 254 132 Pending Final Survey- Handheld GPS
TBRC315 460869 6376387 291 -60 250 120 Pending Final Survey- Handheld GPS
TBRC316 460869 6376387 289 -60 251 120 Pending Final Survey- Handheld GPS
TBRC317 460847 6376297 293 -60 255 120 Pending Final Survey- Handheld GPS
TBRC318 460887 6376304 290 -60 254 120 Pending Final Survey- Handheld GPS
TBRC319 460833 6376335 295 -60 252 120 Pending Final Survey- Handheld GPS
TBRC320 460879 6376345 291 60 251 120 Pending Final Survey- Handheld GPS
TBRC321 460808 6376288 298 60 252 120 Pending Final Survey- Handheld GPS
TBRC322 461306 6376031 292 -60 250 120 Pending Final Survey- Handheld GPS
TBRC323 461306 6376031 292 -60 250 120 Pending Final Survey- Handheld GPS
8
Table 2: Tallebung Project – Downhole logs of drill chips shown in Figure 1. Mineralisation is vein hosted and logging is therefore split into logging of vein volume,
number, and minerals 1-7 for each interval along with any disseminated minerals 1-2 and comments. Logging codes are as follows: Q – Quartz, CST – Cassiterite &
FEOX – Iron-Oxide.
HOLE_ID
FROM
(m)
TO
(m)
INTERVAL
(m)
Total
VOLUME%
VEINS
VEIN
MIN1
VEIN
MIN1
%
VEIN
MIN2
VEIN
MIN2
%
VEIN
MIN3
VEIN
MIN3
%
VEIN
MIN4
VEIN
MIN4
%
VEIN
MIN5
VEIN
MIN5
%
VEIN
MIN6
VEIN
MIN6
%
DISS
MIN1
DISS
MIN1
%
COMMENTS
TBRC322 38 39 1 3 Q 2.9 CST 0.1
qtz veins with trace
cassiterite
TBRC322 39 44 5 0.6 Q 0.6 Trace spaced qtz veins
TBRC322 44 45 1 1 Q 0.9 FEOX 0.2 CST 0.1
Trace qtz veins with
trace cassiterite
TBRC322 45 51 6 no veins no min
TBRC322 51 58 7 11 Q 10.2 FEOX 0.5 CST 0.3
~10% qtz veins each
metre with cassiterite
TBRC322 58 63 5 no veins no min
TBRC322 63 64 1 2 Q 1.9 FEOX 0.2 CST 0.1
qtz veins with trace
cassiterite
TBRC322 64 65 1 no veins no min
TBRC322 65 68 3 19 Q 18.2 FEOX 0.7 CST 0.1
~20%qtz veins with
trace cassiterite
TBRC322 68 73 5 no veins no min
TBRC322 73 75 2 15.5 Q 14.8 FEOX 0.5 CST 0.2
~15% qtz veins each
metre with cassiterite
9
Table 3: Tallebung Project – Soil Sampling Results. Where “-“ is shown, result was reported as “less than
detection”. All results reported are via handheld Olympus Vanta pXRF analysis.
Sample ID Northing Easting Sn W Cu Pb Zn As
(m) (m) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm)
TBS_0002 459614 6376967 - - 12 16 18 9
TBS_0003 459634 6376967 - - 17 19 18 8
TBS_0004 459654 6376967 - - 12 18 20 5
TBS_0005 459674 6376967 - - 14 18 20 4
TBS_0006 459694 6376967 - - 14 17 18 -
TBS_0007 459714 6376967 - - 15 15 15 3
TBS_0008 459734 6376967 - - 15 17 19 3
TBS_0009 459754 6376967 - - 19 15 21 5
TBS_0010 459774 6376967 - - 18 16 19 6
TBS_0011 459794 6376967 - - 24 17 26 5
TBS_0012 459814 6376967 - - 19 19 21 4
TBS_0013 459834 6376967 - - 14 19 23 4
TBS_0014 459854 6376967 - - 23 17 34 7
TBS_0015 459874 6376967 - - 26 18 32 7
TBS_0016 459894 6376967 - - 25 20 39 8
TBS_0017 459914 6376967 - - 26 20 43 6
TBS_0018 459934 6376967 - - 26 18 40 7
TBS_0019 459954 6376967 - - 26 23 37 6
TBS_0020 459974 6376967 - - 23 19 37 7
TBS_0021 459994 6376967 - - 26 19 44 7
TBS_0022 460014 6376967 66 - 23 21 43 7
TBS_0023 460034 6376967 - - 23 41 19 8
TBS_0024 460040 6376001 - - 19 18 20 8
TBS_0025 460054 6376967 - - 27 22 40 9
TBS_0026 460060 6376001 - - 14 16 18 6
TBS_0027 460074 6376967 33 - 25 22 41 18
TBS_0028 460080 6376001 - - 15 16 19 22
TBS_0029 460094 6376967 25 - 16 24 34 24
TBS_0030 460100 6376001 - - 15 15 20 9
TBS_0031 460114 6376967 29 - 21 21 28 23
TBS_0032 460120 6376001 - - 17 16 21 9
TBS_0033 460134 6376967 42 22 25 26 21 158
TBS_0034 460140 6376001 - - 13 16 18 7
TBS_0035 460154 6376967 38 29 12 29 16 248
TBS_0036 460160 6376001 - - 16 15 18 9
TBS_0037 460174 6376967 185 56 19 40 16 316
TBS_0038 460180 6376001 - - 11 15 15 10
TBS_0039 460194 6376967 54 43 17 44 25 222
TBS_0040 460200 6376001 - - 19 16 20 12
TBS_0041 460214 6376967 92 34 23 98 22 170
TBS_0042 460220 6376001 - - 20 16 19 9
TBS_0043 460234 6376967 62 31 15 32 21 129
10
Sample ID Northing Easting Sn W Cu Pb Zn As
(m) (m) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm)
TBS_0044 460240 6376001 - - 23 22 26 9
TBS_0045 460254 6376967 42 34 16 29 22 116
TBS_0046 460260 6376001 - - 17 19 19 6
TBS_0047 460274 6376967 48 44 21 53 18 139
TBS_0048 460280 6376001 - - 17 21 19 7
TBS_0049 460294 6376967 242 300 41 146 31 1708
TBS_0050 460300 6376001 - - 19 21 29 10
TBS_0051 460314 6376967 53 28 19 37 19 190
TBS_0052 460320 6376001 - - 14 24 25 6
TBS_0053 460334 6376967 151 59 19 57 13 288
TBS_0054 460340 6376001 - - 19 24 17 7
TBS_0055 460354 6376967 224 60 33 46 19 198
TBS_0056 460360 6376001 - - 14 24 20 8
TBS_0057 460374 6376967 33 22 18 29 22 93
TBS_0058 460380 6376001 - - 18 24 22 5
TBS_0059 460394 6376967 109 10 34 27 35 69
TBS_0060 460400 6376001 - - 19 19 21 5
TBS_0061 460414 6376967 75 15 12 26 39 91
TBS_0062 460420 6376001 - - 16 21 24 3
TBS_0063 460434 6376967 70 28 26 75 32 143
TBS_0064 460440 6376001 - - 22 16 26 7
TBS_0065 460454 6376967 - - - - - -
TBS_0066 460460 6376001 - - 30 25 41 8
TBS_0067 460474 6376967
TBS_0068 460480 6376001 - - 27 23 33 7
TBS_0069 460494 6376967 262 14 14 18 17 74
TBS_0070 460500 6376001 - - 26 28 25 21
TBS_0071 460514 6376967 81 13 18 17 23 53
TBS_0072 460520 6376001 - - 17 23 23 11
TBS_0073 460534 6376967
TBS_0074 460540 6376001 - - 25 20 39 8
TBS_0075 460554 6376967
TBS_0076 460560 6376001 - - 20 21 32 10
TBS_0077 460574 6376967 313 - 18 23 22 43
TBS_0078 460580 6376001 - - 22 20 33 15
TBS_0079 460594 6376967 73 25 19 46 19 85
TBS_0080 460600 6376001 - - 21 22 30 18
TBS_0081 460614 6376967 122 15 20 28 18 42
TBS_0082 460620 6376001 - - 25 23 27 20
TBS_0083 460634 6376967 919 260 96 317 62 2269
TBS_0084 460640 6376001 - - 22 23 25 15
TBS_0085 460660 6376001 - - 14 22 21 12
TBS_0086 460680 6376001 - - 23 24 21 5
TBS_0087 460700 6376001 - - 20 24 20 5
TBS_0088 460720 6376001 - - 18 24 20 8
TBS_0089 460740 6376001 - - 25 24 22 5
11
Sample ID Northing Easting Sn W Cu Pb Zn As
(m) (m) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm)
TBS_0090 460760 6376001 - - 23 34 16 18
TBS_0091 460780 6376001 67 - 20 29 21 22
TBS_0092 460800 6376001 - - 23 29 14 31
TBS_0093 460820 6376001 - - 33 32 20 53
TBS_0094 460840 6376001 - - 25 25 21 29
TBS_0095 460860 6376001 40 12 17 30 15 37
TBS_0096 460880 6376001 - 10 17 24 18 37
TBS_0097 460900 6376001 - - 28 38 20 26
TBS_0098 460920 6376001 - - 24 23 17 19
TBS_0104 461020 6376001 - - 23 18 23 6
TBS_0105 461040 6376001 - - 18 19 19 9
TBS_0106 461060 6376001 - - 16 20 17 14
TBS_0107 461080 6376001 - - 19 18 17 15
TBS_0109 461120 6376001 - - 25 28 19 28
TBS_0110 461140 6376001 - - 10 25 15 27
TBS_0111 461160 6376001 - - 16 25 18 40
TBS_0112 461180 6376001 - - 21 27 22 65
TBS_0113 461200 6376001 23 8 12 29 17 56
TBS_0114 461220 6376001 - - 8 25 18 22
TBS_0115 461240 6376001 36 - 19 35 15 44
TBS_0116 461260 6376001 - - 12 23 16 38
TBS_0117 461280 6376001 20 - 14 43 17 110
TBS_0118 461300 6376001 - - 14 38 19 94
TBS_0119 461320 6376001 - - 18 27 16 45
TBS_0120 461340 6376001 - - 17 26 19 40
TBS_0121 461360 6376001 - - 21 24 20 17
TBS_0122 461380 6376001 - - 10 16 15 6
TBS_0123 461400 6376001 - - 14 17 17 6
TBS_0124 461420 6376001 - - 20 18 18 10
TBS_0125 461440 6376001 - - 19 18 18 6
TBS_0126 461460 6376001 - - 12 20 19 7
TBS_0127 461480 6376001 - - 16 18 16 5
TBS_0128 461500 6376001 - - 16 16 19 10
TBS_0129 461520 6376001 - - 18 19 18 12
TBS_0130 461540 6376001 - - 11 18 23 10
TBS_0133 461316 6376078 - - 21 26 22 20
TBS_0134 461336 6376078 - - 21 23 22 12
TBS_0135 461276 6376078 - - 13 34 17 83
TBS_0136 461296 6376078 - - 16 28 20 51
TBS_0137 461256 6376078 42 - 14 39 19 86
TBS_0138 461236 6376078 - - 13 21 17 50
TBS_0139 461196 6376078 - - 19 34 19 59
TBS_0140 461216 6376078 96 - 14 38 15 65
TBS_0141 461176 6376078 - - 20 32 17 35
TBS_0142 461156 6376078 24 - 17 33 19 33
TBS_0143 461136 6376078 - - 19 28 21 28
12
Sample ID Northing Easting Sn W Cu Pb Zn As
(m) (m) (ppm) (ppm) (ppm) (ppm) (ppm) (ppm)
TBS_0144 461422 6375937 - - 20 25 20 22
TBS_0145 461402 6375937 - - 16 23 19 17
TBS_0146 461382 6375937 - - 18 27 20 27
TBS_0147 461362 6375937 - - 21 29 20 42
TBS_0148 461342 6375937 - - 18 40 14 68
TBS_0149 461322 6375937 - - 13 61 17 115
TBS_0150 461302 6375937 - - 16 18 31 47
TBS_0152 461282 6375937 - - 16 28 16 47
TBS_0153 461262 6375937 25 - 18 27 22 17
TBS_0154 461242 6375937 - - 21 38 20 32
TBS_0155 461222 6375937 - - 18 32 14 60
TBS_0156 461202 6375937 24 - 22 41 15 73
TBS_0157 461182 6375937 - - 21 48 21 70
TBS_0158 461162 6375937 - - 22 31 19 46
Table 3: Tallebung Project – Rock chip sampling location coordinates (MGA94 Zone 55) and sample description.
Sample ID
Easting
(MGA)
Northing
(MGA)
RL
(m)
Rock Type Comment
GC20260107-1 460952 6375709 305 Quartz-
Cassiterite vein
in siltstone
Southern of 3 small trenches to south of 2025 drilling,
mullock, quartz-cassiterite vein, quartz- iron oxide vein
hosted in steep east dipping siltstone
GC20260107-2 460947 6375714 305 Quartz-
Cassiterite vein
in siltstone
Middle of 3 small trenches to south of 2025 drilling,
mullock, quartz-cassiterite vein, quartz- iron oxide vein
hosted in steep east dipping siltstone
GC20260107-3 460945 6375730 305
Quartz-
Cassiterite vein
in siltstone
Northern of 3 small trenches to south of 2025 drilling,
mullock, quartz-cassiterite vein, quartz- iron oxide vein
hosted in steep east dipping siltstone. Quartz- very
coarse grained cassiterite vein in contact with siltstone
13
JORC CODE, 2012 - TABLE 1
Section 1 Sampling Techniques and Data – TALLEBUNG PROJECT
(Criteria in this section apply to all succeeding sections)
Criteria Explanation Commentary
Sampling techniques • Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry
standard measurement tools appropriate to the minerals under investigation, such as downhole
gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Rock chips and grab samples taken with a geological hammer and collected into labelled calico bags.
All samples were submitted to ALS Orange for preparation and assaying – Rock sample and RC drilling
assays are pending.
Soil samples were collected from holes approximately 15cm in depth and sieved to 100% passing 2mm, a
50-100g sample was collected for assay and analysis via pXRF.
RC Drilling – the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
the time of drilling.
• Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
Soil samples were initially sent for assay via standard assay procedures performed by a reputable assay
lab, (ALS Orange). Multielement assaying was completed for 48 elements by 0.25g four-acid digest with
ICPMS determination (method ME-ICP61). Sn & W were analysed at ALS via ME-MS85 by lithium meta-
borate fusion and ICP-MS. Overlimit samples are analysed via ME-XRF30 fusion.
Laboratory assays were the assessed with in-field pXRF analysis via an Olympus Vanta pXRF handheld
device. Results were found to be sufficiently comparable for the purposes of soil sampling.
Subsequent soil sampling results were obtained via handheld Olympus Vanta pXRF analysis and these
results are report herein.
• Aspects of the determination of mineralisation that are Material to the Public Report. In cases
where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a
30 g charge for fire assay’). In other cases, more explanation may be required, such as where
there is coarse gold that has inherent sampling problems. Unusual Commodities or
mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.
Each sample was dried, crushed and pulverised as per standard industry practice.
Rock chip and RC drilling samples were dried, crushed and pulverised to 90% passing 75 microns –
assays are pending.
Soil samples analysed via handheld Olympus Vanta pXRF.
Drilling techniques • Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face-
sampling bit or other type, whether core is oriented and if so, by what method, etc)
Reverse circulation (RC) drilling using 110mm rods, 144mm face sampling hammer.
Drill sample recovery • Method of recording and assessing core and chip sample recoveries and results assessed.
• Measures taken to maximise sample recovery and ensure representative nature of the samples.
• Whether a relationship exists between sample recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of fine/coarse material
RC samples were weighed for each metre and assessed for recovery, contamination and effect of water if
present. Sample quality is assessed by the sampler by visual approximation of sample recovery and if the
sample is dry, damp or wet. A high capacity RC rig was used to enable dry samples to be collected. Drill
cyclone is cleaned between rod changes and after each hole to minimise cross-hole contamination.
14
Criteria Explanation Commentary
Logging • Whether core and chip samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies
• Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography
• The total length and percentage of the relevant intersections logged
Samples were geologically described at the time of collection. The descriptions were of sufficient detail to
support the current work.
All rock chips and soil samples were described at the time of collection.
Both qualitative and quantitative data is collected. All rock chips and RC chip trays were digitally
photographed.
Systematic geological logging was undertaken, with data collected including:
• Nature and extent of lithologies.
• Relationship between lithologies.
• Amount and mode of occurrence of ore minerals.
• Location, extent, and nature of structures such as bedding, cleavage, veins, faults etc.
Structural data (alpha & beta) are recorded for orientated core.
• Geotechnical data such as recovery, RQD, fracture frequency, qualitative IRS, microfractures,
veinlets and number of defect sets. For some geotechnical holes the orientation, nature of
defects and defect fill are recorded.
Both qualitative and quantitative data is collected for all RC drilling.
Sub-sampling techniques
and sample preparation
• If core, whether cut or sawn and whether quarter, half or all core taken
• If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry
• For all sample types, the nature, quality and appropriateness of the sample preparation
technique
• Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples
• Measures taken to ensure that the sampling is representative of the in-situ material collected,
including for instance results for field duplicate/second-half sampling.
• Whether sample sizes are appropriate to the grain size of the material being sampled
No field duplicates are taken for the rock chip samples. The sample was crushed and pulverised to 90%
passing 75 microns. This was considered to appropriately homogenise the sample.
The available data suggests that sampling procedures provide sufficiently representative subsamples for
the current interpretation.
RC drilling - the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
t
Share your feedback
Discover