1 November 2023
STRONG TIN INTERCEPTS CONTINUE FROM RESOURCE
EXPANSION DRILLING AT TALLEBUNG
Final assay results from the remaining 6 of the 25 holes completed in the Resource
Expansion RC Drilling Program for a total of 4,759m show additional strong, broad tin
mineralisation; results include;
TBRC071:
7m @ 0.35% Tin & 25.8g/t Silver from 29m.
17m @ 0.36% Tin & 24.8g/t Silver from 164m, including;
4m @ 1.02% Tin & 86.9g/t Silver from 176m.
TBRC068:
12m @ 0.27% Tin & 79.1g/t Silver from 106m, including;
3m @ 0.72% Tin & 163g/t Silver from 84m
TBRC070:
28m @ 0.18% Tin from 70m, including;
2m @ 0.91% Tin & 42.6g/t Silver from 84m
Assays are pending for the diamond drilling component of 4 holes for a total of 947.8m
of the Resource Expansion Program. These results are expected in the coming weeks.
On receipt of all the remaining assays, these new results will be included in an updated
MRE, with a target to substantially increase the maiden MRE of 10.2Mt @ 0.18% Tin at
a 0.10% Tin cutoff*.
Drilling is aimed at increasing the size and confidence of the resource to allow for Mine
Scoping Studies to be completed on a ‘critical mass’ resource.
The Board of Sky Metals Limited (‘SKY’ or ‘The Company’) is pleased to announce the final results from the RC
drilling resource expansion and infill program at the Tallebung Project.
TALLEBUNG PROJECT (EL 6699, SKY 100%)
RESOURCE EXTENSION AND INFILL RC DRILLING
The final assay results from the RC drilling have been received for holes TBRC066-71 and include the multiple new
tin intercepts showing additional areas of tin mineralisation to be included in an updated MRE.
SKY CEO Oliver Davies commented: “SKY is continuing to successfully discover tin mineralisation
outside of the maiden Exploration Target footprint and MRE. These new results also show the growing
continuity of the tin mineralisation at Tallebung. SKY looks forward to updating the MRE for the
Tallebung Project with these new results and advancing this promising project towards a ‘critical mass’
to announce mine scoping studies for the Tallebung Tin Project.”
* For further details on the maiden MRE for the Tallebung Tin Project please see SKY ASX Announcement 22 March 2023.
SKY METALS LIMITED
+61 2 6360 1587
2 HAWTHORN PLACE, ORANGE NSW 2800
WWW.SKYMETALS.COM.AU
ABN 46 098 952 035
Figure 1: Tallebung Tin Project – Plan showing extent of the current Exploration Target along with locations of recently completed holes in the resource expansion
and infill drilling program, overlaid on the geological map. New assays are in yellow.
2
The first hole in this batch, TBRC066, was drilled on the southwestern margin of Exploration Target footprint and
intercepted reduced tin mineralisation, demonstrating that tin mineralisation remains open at Tallebung, results
included:
TBRC066: 2m @ 0.11% Tin & 0.06% Tungsten from 4m.
TBRC067 was then drilled on the eastern margin of exploration target footprint and also intercepted reduced tin
mineralisation, however, as in TBRC066, demonstrates that tin mineralisation remains open at Tallebung, results
included:
TBRC067: 8m @ 0.12% Tin from 112m, including;
1m @ 0.73% Tin from 115m.
These results will be followed up to see if this new mineralisation can be traced into more favourable stratigraphic
horizons where the tin mineralisation may increase in grade and width.
The next hole in the program, TBRC068, was drilled on the central-western margin of the Exploration Target
footprint to follow up on the prospective intercepts and stratigraphy in TBRC054 and look for further extensions to
the tin mineralisation. TBRC068 successfully intercepted strong, broad tin mineralisation and significantly
extended the footprint of Tallebung substantially to the west, results included:
TBRC068: 12m @ 0.27% Tin, 0.10% Tungsten & 79.1g/t Silver from 106m, including;
3m @ 0.72% Tin, 163g/t Silver, 0.14% Copper & 1.49% Zinc from 111m.
Two holes, TBRC069 & TBRC070 were drilled near the high-grade tin mineralisation discovered with TBD002 and
TBD003 (60.2m @ 0.54% Tin from 12.8m and 60.55m @ 0.36% Tin from 23m, respectively) to further extend these
strong tin intercepts, results included:
TBRC069: 5m @ 0.50% Tin, 0.06% Tungsten, 109g/t Silver & 1.91% Copper from 106m,
including; 1m @ 2.15% Tin, 0.08% Tungsten, 477g/t Silver & 8.56% Copper from 111m.
TBRC070: 28m @ 0.18% Tin from 70m, including;
2m @ 0.91% Tin, 0.04% Tungsten & 42.6g/t Silver from 84m.
Finally, the last RC drillhole in the program, TBRC071, was on the edge of the southern lead open pit to extend tin
mineralisation to the east. TBRC071 intercepted multiple zones of strong tin, also significantly extending the tin
mineralisation, results included:
TBRC071: 7m @ 0.35% Tin & 25.8g/t Silver from 29m,
17m @ 0.36% Tin & 24.8g/t Silver from 164m, including;
4m @ 1.02% Tin, 86.9g/t Silver, 0.08% Copper & 2.61% Zinc from 174m.
These final results from the RC drilling program have successfully intercepted further tin mineralisation at
Tallebung. SKY now eagerly anticipates the assay results for the diamond drilling component for the Resource
Expansion Drilling program to be received in the coming weeks to then be used in an updated MRE.
FUTURE WORK PROGRAM
All assays for the RC drilling component of the resource expansion program have now been received and on
receipt of the diamond drilling assay results these new results will be added to estimate a new Mineral Resource
Estimate (MRE). This will aim to increase SKY’s maiden MRE of 10.2Mt @ 0.18% Tin for 18.4kt at a 0.10% Tin cutoff grade and convert the estimated Exploration Target of 16 – 21Mt at a grade ranging between 0.16 - 0.20 % tin
at 0.1% Tin cut-off, into additional resources (SKY ASX Announcement 22 March 2023).
3
Following the new estimate of the mineral resources at Tallebung, if required, SKY plans to undertake an
additional drilling program to increase confidence in the resources, in particularly resources around high-grade
areas such as those identified surrounding hole TBD003 (60.55m @ 0.36% Tin from 23m), increasing the resource
confidence in these areas to indicated resources. The surrounding resource is planned to be drilled to inferred
resources and this aims to achieve a ‘critical mass’ for mine scoping studies to be undertaken and released.
Table 1: Tallebung Project – Drillhole Collar Details.
RL (m)
DIP
Azimuth
(MGA)
Total
Depth
(m)
6376394
296
-60
255.4
198
Completed
6376658
283.8
-60
260.4
174
Abandoned due to excessive water
460468
6376775
287.2
-60
250.4
192
Completed, hole extended past planned depth due
to further mineralisation intercepted
TBRC069
460693
6376558
288.3
-60
260.4
192
Completed
TBRC070
460751
6376565
287.5
-60
260.4
198
Completed
TBRC071
460635
6376793
278
-60
250.4
192
Abandoned due to excessive water
TBD005
460751
6376650
284
-65
260
251.5
Completed; Assays Pending
TBD006
460863
6376298
294
-65
245
229.7
Completed; Assays Pending
TBD007
460763
6376474
294
-65
250
178.4
Completed; Assays Pending
TBD008
460553
6376856
296
-65
250
288.2
Completed; Assays Pending
Hole ID
Easting
(MGA)
Northing
(MGA)
TBRC066
460684
TBRC067
460806
TBRC068
Comments
Table 2: Tallebung Project – Significant Intercepts.
Hole ID
TBRC066
TBRC067
including
including
TBRC068
including
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
(m)
(m)
%
%
g/t
%
%
4
6
2
0.11
0.06
-
-
-
84
85
1
0.25
-
10.9
-
-
24
25
1
0.64
-
-
-
-
34
36
2
0.25
-
10.1
-
-
49
50
1
0.68
-
11
-
-
65
67
2
0.29
-
-
-
-
72
73
1
0.18
-
-
-
-
75
76
1
0.12
-
-
-
-
79
80
1
0.24
-
-
-
-
85
86
1
0.13
-
-
-
-
95
103
8
0.09
0.08
-
-
-
Comments
101
102
1
0.29
0.58
-
-
-
112
120
8
0.12
-
-
-
-
115
116
1
0.73
-
-
-
-
133
135
2
0.15
-
14.8
-
-
28
29
1
0.15
-
-
-
-
58
59
1
0.65
0.04
-
-
-
106
118
12
0.27
0.10
79.1
0.06
0.69
Strong Tungsten mineralisation
111
114
3
0.72
-
163
0.14
1.49
Substantial base metal mineralisation
4
Strong Tungsten intercept
Hole ID
including
TBRC069
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
(m)
(m)
%
%
g/t
%
%
151
152
1
0.16
-
28.4
0.09
-
158
167
9
-
-
36.9
-
-
159
160
1
0.1
0.04
175
0.08
0.83
18
19
1
0.26
-
40.9
-
-
58
59
1
0.35
-
-
-
-
66
71
5
0.50
0.06
109
1.91
-
67
68
1
2.15
0.08
477
8.56
-
91
92
1
0.22
0.45
15.6
-
-
105
106
1
0.2
0.07
-
-
1.38
118
119
1
0.6
0.55
-
-
-
136
142
6
0.22
-
-
-
-
including
140
141
1
0.73
-
-
-
-
TBRC070
0
2
2
0.31
0.06
-
-
-
10
12
2
0.26
-
-
-
-
70
98
28
0.18
-
-
-
-
84
86
2
0.91
0.04
42.6
-
0.42
107
108
1
0.75
0.05
84.2
0.07
1.56
167
168
1
0.68
-
-
-
-
29
36
7
0.35
-
25.8
-
-
including
including
TBRC071
including
including
29
30
1
1.49
0.06
37.8
-
-
143
144
1
0.47
-
-
-
-
164
181
17
0.36
-
24.8
-
0.81
176
180
4
1.02
-
86.9
0.08
2.61
189
190
1
0.68
0.50
11.6
-
-
5
Comment
Strong Silver intercept
High-grade Copper mineralisation
High Silver and base metal intercept
High Silver and base metal intercept
This report has been approved for release by the Board of Directors.
ABOUT SKY (ASX: SKY)
SKY is an ASX listed public company focused on the exploration and development of high value mineral resources in Australia.
SKY’s project portfolio offers exposure to the tin, gold, and copper markets in the world class mining jurisdiction of NSW.
TIN PROJECTS
TALLEBUNG PROJECT (EL6699, 100% SKY)
The Tallebung Project is located ~70km north-west of Condobolin in central NSW. The project encompasses the historic
Tallebung Tin Mining Field at the northern extent of the Wagga Tin Belt within the central Lachlan Orogen where SKY has
now defined a maiden MRE of 10.2Mt @ 0.18% Tin*. SKY plans to advance the Tallebung by increasing the resource to the
16-21Mt* Exploration Target and progress development for future mining (*SKY ASX Announcement 22 March 2023).
DORADILLA PROJECT (EL6258, 100% SKY)
The Doradilla Project is located ~ 30km south of Bourke in north-western NSW and is a large and strategic REE and tin
project with excellent potential for associated polymetallic mineralisation (tungsten, copper, bismuth, indium, nickel, cobalt).
NARRIAH PROJECT (EL9524, 100% SKY)
The Narriah Project is located ~70km west of West Wyalong in western NSW and represents a large tin project with
multiple historic workings prospective for tin, tungsten and lithium mineralisation with limited drill testing completed to date.
NEW ENGLAND PROJECT (EL9200, 100% SKY)
The exploration licence in the New England Orogen covers areas of significant historical tin production.
COPPER GOLD PROJECTS
IRON DUKE (EL6064, EL9191 100% SKY)
The Iron Duke project is located ~10km southeast of Tottenham in central NSW and covers at
least 4 significant historic copper-gold mines.
High grade copper-gold mineralisation
intersected by previous explorers (e.g. 13m @
1.56% Cu & 4.48g/t Au).
GALWADGERE (EL6320, 100% SKY)
The Galwadgere project is located ~15km southeast of Wellington in central NSW. An open MRE
of 3.6Mt @ 0.78% Cu and 0.28g/t Au defined at
Galwadgere with numerous targets with limited
drilling testing adjacent to the MRE.
GOLD PROJECTS
CULLARIN / KANGIARA projects (EL7954;
EL8400 & EL8573, DVP JV)
The Cullarin Project contains equivalent host
stratigraphy to the McPhillamys deposit with a
similar geochemical, geophysical & alteration
signature. ‘McPhillamys-style’ gold results from
previous drilling at the Cullarin Project. SKY’s
maiden drill program was successful, including
HUD002 which returned 93m @ 4.2 g/t Au from
56m.
CALEDONIAN / TIRRANA PROJECTS
(EL8920, EL9048, EL9120 100% SKY)
Highlight, ‘McPhillamys-style’ gold results from
previous exploration include 36m @ 1.2 g/t Au
from 0m to EOH in drillhole LM2 and 81m @
0.87g/t Au in a costean on EL8920 at the
Caledonian Project.
Figure 2: SKY Tenement Location Map
6
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver
Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee of Sky
Metals Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr.
Davies consents to the inclusion in this report of the matters based on his information in the form and context in
which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www. asx.com.au). The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves
and resources, production levels and rates, costs, prices, future performance or potential growth of Sky Metals
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Sky Metals Ltd.
Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may
differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been,
and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining,
and Metallurgy and Australian Institute of Geoscientists.
7
JORC CODE, 2012 - TABLE 1
Section 1 Sampling Techniques and Data – TALLEBUNG PROJECT
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling techniques
Explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry
standard measurement tools appropriate to the minerals under investigation, such as downhole
gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
Drill core sampling is by sawn quarter core PQ & half core HQ core. Nominal sample intervals are 1m
with a range from 0.3m to 2.0m.
RC Drilling – the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is
retained for future use if required. 1m intervals are split using a cone splitter on the rig into a
separate calico at the time of drilling.
For RC drilling, assay standards or blanks are inserted at least every 50 samples.
For diamond drilling standards are insert every 30-50 samples.
All sample lab received weights show consistency with core recovery and interval length.
Aspects of the determination of mineralisation that are Material to the Public Report. In cases Each sample was dried, crushed and pulverised as per standard industry practice.
where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a RC Drilling – the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
30 g charge for fire assay’). In other cases, more explanation may be required, such as where
for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
there is coarse gold that has inherent sampling problems. Unusual commodities or
the time of drilling. Where mineralisation has not been logged, 4m composites have been made by using
mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information. a spear to combine equal amounts of samples from each 1m calico.
The primary metal of interest, tin (Sn) and also tungsten (W) were determined by lithium borate fusion
XRF (method GE_IMS92A50 and GE_ICP92A50) – considered appropriate for these elements.
Multielement assaying was completed for 48 elements by 0.25g four-acid digest with ICPMS
determination (method GE_IMS40Q20 and GE_ICP40Q20).
Reverse circulation (RC) drilling using 110mm rods, 144mm face sampling hammer.
Drilling techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by what method, etc)
Drill sample recovery
Method of recording and assessing core and chip sample recoveries and results assessed.
RC drilling - high capacity RC rig was used to enable dry samples collected. Drill cyclone is cleaned
Measures taken to maximise sample recovery and ensure representative nature of the samples. between rod changes and after each hole to minimise cross-hole contamination.
Whether a relationship exists between sample recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of fine/coarse material
Sample weights are recorded for each sample. Recoveries were generally excellent and consistent,
however, if samples were wet the recoveries were less consistent.
There is no known relationship between sample recovery and grade. Where samples recoveries are less
than 95% there is no relationship observed between grade and sample recovery. Relationships between
sample recovery and grade are not considered significant where recoveries exceeded 95% in fresh rock.
8
Criteria
Logging
Explanation
Commentary
Whether core and chip samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography
The total length and percentage of the relevant intersections logged
Systematic geological and geotechnical logging was undertaken when the holes were originally drilled.
Data collected includes:
Nature and extent of lithologies.
Relationship between lithologies.
Amount and mode of occurrence of ore minerals.
Location, extent, and nature of structures such as bedding, cleavage, veins, faults etc.
Structural data (alpha & beta) are recorded for orientated core.
Geotechnical data such as recovery, RQD, fracture frequency, qualitative IRS, microfractures, veinlets and
number of defect sets. For some geotechnical holes the orientation, nature of defects and defect fill are
recorded.
Both qualitative and quantitative data is collected.
RC chips, half core (HQ) & ¾ core (PQ) samples are retained in trays for future reference.
A representative sample of each one metre RC interval is retained in chip trays for future reference.
All chips were geologically logged.
Sub-sampling techniques
and sample preparation
If core, whether cut or sawn and whether quarter, half or all core taken
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry
For all sample types, the nature, quality and appropriateness of the sample preparation
technique
Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples
Measures taken to ensure that the sampling is representative of the in-situ material collected,
including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled
RC drilling - the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
the time of drilling. Where 4m composites have been made, a spear is used to split equal amounts of
each metre into the 4m composite.
Samples were dried crushed and pulverised to 90% passing 75 microns. This is considered to
appropriately homogenise the sample to allow subsampling for the various assay techniques.
SKY: Certified Reference Material (CRM) and blanks were inserted at least every 50 samples to assess the
accuracy and reproducibility of the drill core results. The results of the standards were to be within ±10%
variance from known certified result. If greater than 10% variance the standard and up to 10 samples
each side were re-assayed. SGS conducted internal check samples every 20 for multielement assay.
RC drilling - duplicate samples are collected of re-split intervals. Duplicates generally show excellent
repeatability.
Sample sizes are industry standard and considered appropriate
Quality of assay data
and laboratory tests
The nature, quality and appropriateness of the assaying and laboratory procedures used and
Standard assay procedures performed by a reputable assay lab, (SGS), were undertaken. Forty-eight
whether the technique is considered partial or total
elements Ag, As, Cu, Fe, Pb, S, Zn are digested by four-acid digest then analysed by ICPMS (method
For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in
GE_IMS40Q20 and GE_ICP40Q20).
determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc
Sn and W assays were generated by lithium borate fusion XRF (method GE_IMS92A50 and
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
GE_ICP92A50) – considered appropriate for these elements.
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have
been established
No geophysical tools were used in the determination of assay results.
Certified reference material or blanks were inserted at least every 50 samples. Standards are purchased
9
Criteria
Explanation
Commentary
from Certified Reference Material manufacture companies: Standards were purchased in foil lined
packets of between 60g and 100g. Different reference materials were used to cover high grade, medium
grade, low grade, and trace ranges of elements, with a primary focus on Sn and Cu.
Verification of sampling
and assaying
Drill data is compiled and collated and reviewed by senior staff. External consultants do not routinely
The verification of significant intersections by either independent or alternative company
verify exploration data until resource estimation procedures are deemed necessary. The intersection
personnel.
calculations were viewed by >1 geological personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data storage (physical
Twinned holes have been used by past explorers to validate the results achieved and have confirmed
and electronic) protocols.
these historic results.
Discuss any adjustment to assay data
Drill Hole Data including: meta data, any gear left in the drill hole, lithological, mineral, survey, sampling,
magnetic susceptibility was collected and stored as physical and electronic copies or entered directly into
an excel spread sheet using drop down codes. When complete the spreadsheet was combined into a
master excel spreadsheet as the drill hole database.
Assay data was provided by SGS via .csv spreadsheets. The data was validated using the results received
from the known certified reference material. Hard copies of the assay certificates were stored with drill
hole data such as drillers plods, invoices, and hole planning documents.
Assay data is not adjusted.
Location of data points
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
Specification of the grid system used
Quality and adequacy of topographic control
Historic drill hole collars were located using either a licenced surveyor or on a local imperial or metric
grid. Conversion of the local grid co-ordinates has been undertaken by previous exploration companies.
SKY has used DGPS surveying of drillholes (± 0.1m) to accurately locate them.
All coordinates are based on Map Grid Australia Zone 55E, Geodetic Datum of Australia 1994.
Historic drill hole collars were located using either a licenced surveyor or on a local imperial or metric
grid. SKY has used DGPS surveying of drillholes (± 0.1m) to accurately locate them, or handheld GPS (+/3m). Where handheld GPS has been used SKY will DGPS them at a later date.
Data spacing and
distribution
Orientation of data in
relation to geological
structure
Data spacing for reporting of Exploration Results
At this early exploration stage, the data spacing is variable as the focus is on geological mapping and
Data spacing for reporting of Exploration Results Whether the data spacing, and distribution is identifying new zones of mineralisation.
sufficient to establish the degree of geological and grade continuity appropriate for the Mineral
Resource and Ore Reserve estimation procedure(s) and classifications applied
The maiden MRE was estimated to inferred only and increases in resource confidence will require tighter
Whether sample compositing has been applied
spaced drilling in future programs.
Sample compositing is not applied.
Whether the orientation of sampling achieves unbiased sampling of possible structures and the Drilling was orientated to cross the mineralisation trend at moderate to high angles. The use of
extent to which this is known, considering the deposit type
orientated core allows estimates of the true width and orientation of the mineralisation to be made.
If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced sampling bias, this should be assessed and reported
No sample bias due to drilling orientation is known. The structural controls on mineralisation is
if material
considered well understood and consistent.
10
Criteria
Explanation
Commentary
Sample security
The measures taken to ensure sample security
Sample chain of custody has been managed by the employees of Sky Metals who commissioned the
drilling and transport samples from the drilling rig to assay laboratory.
All samples are bagged in tied numbered calico bags, grouped into larger tied polyweave bags, or placed
in a stillage box and transported to SGS in Orange by SKY personnel. All sample submissions are
documented via SGS tracking system and all assays are reported via email.
Sample pulps are returned to site and stored for an appropriate length of time (minimum 3 years). The
Company has in place protocols to ensure data security.
Audits or reviews
The results of any audits or reviews of sampling techniques and data
The Company does not routinely have external consultants verify exploration data until resource
estimation procedures are deemed necessary. Further details for the maiden MRE can be found in SKY
ASX Announcement 22 Match 2023.
Section 2 Reporting of Exploration Results – TALLEBUNG PROJECT
(Criteria listed in the preceding section also apply to this section)
Criteria
Explanation
Mineral tenement and
land tenure status
Exploration done by
other parties
Commentary
Type, reference name/number, location and ownership including agreements or material issues The Tallebung Project is described by NSW Exploration Licence 6699
with third parties such as joint ventures, partnerships, overriding royalties, native title interests, The tenement is 100% owned by Stannum Pty Ltd, a 100% owned subsidiary of Big Sky Metals Pty Ltd
historical sites, wilderness or national park and environmental settings.
and a 100% owned subsidiary of Sky Metals Ltd.
The Tallebung tenement is overlain by Native Title Determination Application No NC12/1 (Federal Court
No NSD 415/12). A determination of extinguished native title was received over a portion of the
Tallebung Tin Field.
The security of the tenure held at the time of reporting along with any known impediments to
obtaining a licence to operate in the area
Stannum Pty Ltd have previously commenced a Right to Negotiate Process (RTN) with the claimant
group with respect to Application No NC12/1 (Federal Court No NSD 415/12). These negotiations are
ongoing and Stannum Pty Ltd resubmitted a Native Title Clearance report to the NSW Dept of Planning
(June 2018). A determination of extinguished native title was received over a portion of the Tallebung
Tin Field Stannum has also signed an access agreement with the Native Title Applicant for access to the
entire lease upon cultural clearance.
Acknow
Share your feedback