Resource Expansion Drilling Results - Tallebung
Released
Released
Announcement PDF
ASX: SKY
ASX ANNOUNCEMENT
4 October 2023
RESOURCE EXPANSION DRILLING INTERCEPTS BROAD,
STRONG TIN MINERALISATION – TALLEBUNG TIN PROJECT
Assay results for 15 of the 25 holes competed for a total of 4,759m at the Tallebung Tin
Project have been received, results include:
TBRC059:
19m @ 0.27% Tin from 17m, including;
5m @ 0.83% Tin from 19m.
TBRC056:
10m @ 0.31% Tin from 68m, including;
1m @ 0.94% Tin from 69m
TBRC057:
6m @ 0.49% Tin & 40g/t Silver from 34m, including;
1m @ 2.30% Tin & 83.8g/t Silver from 35m.
Assays for the remaining 10 holes are pending and expected to be received over the
coming weeks.
On receipt of the remaining assays, these results will be included in an updated MRE,
with a target to substantially increase the maiden MRE of 10.2Mt @ 0.18% Tin at a
0.10% Tin cutoff*.
Concurrent diamond drilling has confirmed the ubiquitous occurrence of uniquely
coarse cassiterite-hosted tin mineralisation across the Tallebung deposit**.
The coarse nature of the tin in cassiterite at Tallebung highlights the excellent
metallurgical advantages indicating very low-cost tin production.
Ongoing drilling is aimed to increase the confidence of the resources to allow Mine
Scoping Studies to be completed on a ‘critical mass’ resource.
SKY CEO Oliver Davies commented: “The consistent nature of these results, combined with the extension of
high-grade zones, will significantly grow an updated resource at the Tallebung Project on receipt of all of the
outstanding results. SKY looks forward building on the Tallebung resource, continuing towards and growing the
Exploration Target of 16-21Mt @ 0.16-0.20% Tin in the coming months. This will provide SKY with the ‘critical
mass’ with which SKY can begin to release mine scoping studies.”
* For further details on the maiden MRE for the Tallebung Tin Project please see SKY ASX Announcement 22 March 2023.
**In relation to the disclosure of visible mineralisation, the Company cautions that visual estimates of mineral abundance should never be
considered a proxy or substitute for laboratory analyses where concentrations or grades are the factor of principal economic interest.
Visual estimates also potentially provide no information regarding impurities or deleterious physical properties relevant to valuations. The
Company will update the market when laboratory analytical results become available, expected to commence from early-September 2023.
SKY METALS LIMITED
+61 2 6360 1587
2 HAWTHORN PLACE, ORANGE NSW 2800
WWW.SKYMETALS.COM.AU
ABN 46 098 952 035
The Board of Sky Metals Limited (‘SKY’ or ‘The Company’) is pleased to announce the results of the first phase of
resource expansion and infill drilling at the Tallebung Project, building to a critical mass resource target for mine
scoping studies and potential future mining.
TALLEBUNG PROJECT (EL 6699, SKY 100%)
TALLEBUNG PROJECT – RESOURCE EXTENSION AND INFILL RC DRILLING
The first phase of RC drilling was completed in August for 25 holes for a total of 4,759m designed to grow SKY’s
maiden MRE of 10.2Mt @ 0.18% Tin for 18.4kt at a 0.10% Tin cut-off grade and convert the estimated Exploration
Target of 16 – 21Mt at a grade ranging between 0.16 - 0.20 % tin at 0.1% Tin cut-off, into additional resources (SKY
ASX Announcement 22 March 2023).
The first phase of this drilling targeted the southern and central areas of the historic Tallebung Tin Mining Field
where the majority of the historic hardrock workings are located (Figure 1).
Holes TBRC047-TBRC055, TBRC068 & TBRC071 were drilled into the central area of the historic Tallebung Tin
Mining Field. This area has strong potential to add significant resources to increase the maiden MRE. The area
previously had only very sparse drilling while having the most intensive historic hardrock mining activity,
evidenced by the multiple open pits and shafts which are densely distributed over the area, showing the potential
for additional resources with drilling.
Assay results from TBRC047-TBRC055 drilled in the central mining area have been received in this latest batch of
assay results received, results included:
TBRC047: 29m @ 0.09% Tin from 56m, including;
10m @ 0.15% Tin from 75m, including;
2m @ 0.55% Tin, 0.05% Tungsten & 50g/t Silver from 75m.
TBRC048: 16m @ 0.15% Tin & 0.04% Tungsten from 2m;
41m @ 0.10% Tin from 76m, including;
4m @ 0.32% Tin & 58.1g/t Silver from 4m.
TBRC049: 22m @ 0.11% Tin from 3m, including;
1m @ 1.25% Tin from 21m;
TBRC050: 19m @ 0.21% Tin, 0.03% Tungsten & 21g/t Silver from 158m, including;
2m @ 2.09% Tin, 0.05% Tungsten & 178g/t Silver from 162m.
TBRC051: 26m @ 0.10% Tin from 148m, including;
2m @ 0.35% Tin from 75m, including;
TBRC052: 6m @ 0.21% Tin, 52.6g/t Silver & 1.85% Zinc from 132m.
TBRC053: 1m @ 1.08% Tungsten, 0.17% Tin, 38.6g/t Silver from 77m (Tungsten Lode), and;
8m @ 0.15% Tin & 61.4g/t Silver from 83m.
TBRC054: 10m @ 0.11% Tin from 15m, including;
2m @ 0.33% Tin from 75m.
TBRC055: 16m @ 0.11% Tungsten & 35.6g/t Silver from 149m (Tungsten Lode), and;
1m @ 0.34% Tin, 423g/t Silver & 0.28% Copper from 157m.
2
Figure 1: Tallebung Tin Project – Plan showing drilling with the extent of the current Exploration Target along with locations of recently completed holes and
planned holes in the resource expansion and infill drilling program, overlaid on the geological map (new assays are in yellow).
3
Figure 2: Tallebung Tin Project – Cross-section through the northern-most traverse in the recent drilling of
TBRC008-TBRC019/25 and shows tin mineralisation is strongest where the host rock sequence predominately
psammite-rich, with fewer pelite interbeds.
The remainder of the holes, TBRC056-67 & TBRC069-70 were drilled in the Southern area of the Tallebung Tin
Mining Field. Recent results this year such as TBD004 (60.55m @ 0.36% Tin from 23m) (SKY ASX Announcement 19
April 2023) have highlighted the presence of a high-grade zone in the southern area. Drilling targeted expanding
this high-grade area and increasing the confidence of the resources in this high-grade zone.
Assay results for TBRC056-TBRC061 have now been received for this drilling and link the high-grade intercept in
TBRC042 (11m @ 0.81% Tin from 27m) further south to the high-grade zone in TBD004 over a 400-300m strike. These
results also show that the Tallebung tin deposit remains open along strike to the south. Results included:
TBRC056: 10m @ 0.31% Tin & 0.05% Tungsten from 68m, including;
1m @ 0.94% Tin from 69m, including;
TBRC057: 6m @ 0.49% Tin & 40g/t Silver from 34m, including;
1m @ 2.30% Tin & 83.8g/t Silver from 35m, and;
6m @ 0.39% Tin, 0.42% Tungsten & 83.8g/t Silver from 88m, including;
2m @ 0.83% Tin, 1.14% Tungsten & 31.4g/t Silver from 88m.
22m @ 0.19% Tin from 174m, including;
1m @ 3.75% Tin & 2.10% Zinc from 191m.
4
TBRC058: 37m @ 0.17% Tin & 0.05% Tungsten from 124m, including;
3m @ 0.49% Tin from 158m.
TBRC059: 19m @ 0.27% Tin from 17m, including;
5m @ 0.83% Tin from 19m.
TBRC060: 20m @ 0.10% Tin from 147m, including;
1m @ 0.51% Tin from 150m.
TBRC061: 8m @ 0.12% Tin from 49m, and;
1m @ 0.38% Tin & 0.12% Tungsten from 52m.
5m @ 0.20% Tin from 72m
This first phase of drilling has successfully confirmed and extended the high-grade areas and SKY will now plan
the further drilling required to establish this area as indicated resources in the second phase of RC drilling, along
with discovering extension to the tin mineralisation to increase the maiden inferred MRE.
On receipt of all of these results, SKY will plan a second phase of drilling to convert a ‘critical mass’ into inferred
and indicated resources. This critical mass will then allow for mine scoping studies to commence on the Tallebung
Tin Project to evaluate the key project economics.
All pending results are anticipated to be received in the coming weeks with the second phase of RC drilling at
Tallebung currently planned to commence in November.
TALLEBUNG PROJECT – DIAMOND DRILLING
Diamond drilling has been completed concurrently with the RC program and was completed across the entire
strike of the maiden MRE. Four holes (TBD005-TBD008) have been completed for a total of 947.8m.
All holes completed (TBD005-TBD008) have intercepted the characteristic coarse cassiterite-hosted tin
mineralisation at Tallebung (Figure 3). The confirmation of the uniform and uniquely coarse cassiterite tin at
Tallebung is very important as it continues to show that the excellent metallurgical advantages of the Tallebung
mineralisation are present throughout the deposit. This indicates that the tin can be concentrated into a saleable
concentrate readily and cheaply using simple ore sorting and gravity processing.
TBD005 was drilled to target tin lodes at depth and intercepted strong veining with visible coarse cassiterite from
206-242m DH (Figure 2). TBD006 was then drilled on the southern extent of the maiden MRE near hole TBRC042
(11m @ 0.81& Tin from 27m). TBD006 has intercepted very coarse cassiterite, as found in all other holes drilled to
date at Tallebung, demonstrating the consistent nature of the tin mineralisation at Tallebung as being hosted in
coarse cassiterite.
TBD007 targeted down dip and along strike extensions to the strong tin mineralisation intercepted in the vicinity
of TBRC034 (43m @ 020% Tin from 5m) and TBD008 was then drilled to test extensions to tin mineralisation in the
north of the central area of the Tallebung Tin Mining Field (Figure 1 and 2).
These holes have been logged for detailed geotechnical studies to aid in future mine planning and mine open pit
designs for any future mining excavation. These diamond drillholes are being drilled with wide diameter PQ drill
core to over 150m downhole to provide material for bulk samples for further representative metallurgical testing.
The metallurgical testwork will aim to improve on the current simple processing methods available for the
Tallebung mineralisation due to the coarse nature of the cassiterite-hosted tin. This work will include providing
5
further representative samples for TOMRA Ore Sorting testwork to confirm and possibly improve on the excellent
results achieved to date showing a low-cost processing pathway for the Tallebung tin mineralisation.
Figure 3: Tallebung Tin Project – LHS: drillcore from approx. 225m DH in TBD005 showing the coarse cassiterite
tin mineralisation present at Tallebung. Centre: Drillcore from 29.3-32.4m DH in TBD006 with strong quartzcassiterite veining throughout. RHS: Veining from 30.8m DH showing the coarse nature of the cassiterite-hosted
tin at Tallebung. Drill core is 83mm wide for scale.
TALLEBUNG PROJECT – FORWARD WORK PROGRAM
When the remainder of the results from the first phase of resource expansion RC drilling and assays from the
diamond drilling are all received, the results will be included in an update MRE. This MRE will then be used to
plan a follow-up second phase of RC drilling to increase the resources and Exploration Target of 16-21Mt @ 0.160.20% Tin to a critical mass for releasing mine scoping studies to evaluate the key project economics for
potential future mining at Tallebung.
Additionally, samples will be taken from the diamond drilling program to undergo further metallurgical testing,
including variability testing by TOMRA Ore Sorting Solutions to prove that the mineralisation can be consistently
ungraded across the entire strike and depth of the deposit and that the low-cost processing pathway for the
Tallebung tin mineralisation are consistent throughout the deposit.
6
Table 1: Tallebung Project – Drillhole Collar Details.
Hole ID
Easting (MGA)
Northing
(MGA)
RL (m)
DIP
Azimuth
(MGA)
Total
Depth (m)
Comments
TBRC047
460519.2
6376598
285.1
-60
255.4
156
Completed
TBRC048
460529.3
6376852
289.59
-60
250.4
216
Completed
TBRC049
460579.7
6376823
285.25
-60
250.4
198
Completed
TBRC050
460612.4
6376863
283.85
-60
250.4
210
Completed
TBRC051
460511.9
6376748
284.68
-60
250.4
198
Completed
TBRC052
460523.7
6376797
285.77
-60
250.4
216
Completed
TBRC053
460432
6376857
291
-60
250.4
156
TBRC054
460440
6376709
287.13
-60
250.4
162
Completed
Completed and significantly extended
intercepting new mineralisation
Completed
TBRC055
460494
6376664
286
-60
250.4
216
TBRC056
460689.8
6376492
290.59
-60
260.4
204
TBRC057
460807.9
6376484
290.17
-60
255.4
204
Completed
Completed
TBRC058
460784.7
6376445
293.63
-60
255.4
198
Completed
TBRC059
460819
6376364
295.39
-60
250.4
198
Completed
TBRC060
460820
6376411
293.38
-60
250.4
210
Completed
TBRC061
460876.2
6376246
293.1
-60
245.4
156
Completed
TBRC062
460921
6376304
290.61
-60
250.4
196
TBRC063
460984.7
6376316
289.51
-60
250.4
159
TBRC064
460880.1
6376202
295.84
-60
245.4
150
Completed; Assays Pending
Abandoned due to excessive water;
Assays Pending
Completed; Assays Pending
TBRC065
460937.2
6376191
293.68
-60
250.4
210
Completed; Assays Pending
TBRC066
460683.5
6376394
295.97
-60
255.4
198
TBRC067
460806.1
6376658
283.81
-60
260.4
174
TBRC068
460468.3
6376775
287.24
-60
250.4
192
TBRC069
460693.3
6376558
288.3
-60
260.4
192
Completed; Assays Pending
Abandoned due to excessive water;
Assays Pending
Completed, hole extended past
planned depth due to further
mineralisation intercepted; Assays
Pending
Completed; Assays Pending
TBRC070
460750.9
6376565
287.51
-60
260.4
198
TBRC071
460634.7
6376793
277.98
-60
250.4
192
Completed; Assays Pending
Abandoned due to excessive water;
Assays Pending
TBD005
460751.2
6376650
284
-65
260
251.5
Completed
TBD006
460862.7
6376298
29
-65
245
229.7
Completed
TBD007
460763
6376474
294
-65
250
178.4
Completed
TBD008
460553
6376856
296
-65
250
288.2
Completed
Table 1: Tallebung Project – Significant Intercepts.
Hole ID
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
(m)
(m)
%
%
g/t
%
%
13
15
2
0.18
-
-
-
-
56
85
29
0.09
-
-
-
-
including
57
58
1
0.5
0.1
-
-
-
and
75
85
10
0.15
0.02
12.9
0.02
-
including
75
77
2
0.55
0.05
50
0.06
-
TBRC047
7
Comment
Hole ID
TBRC048
including
including
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
(m)
(m)
%
%
g/t
%
%
101
103
2
0.1
0.19
13.7
-
-
118
122
4
0.11
0.02
8.7
-
-
129
131
2
0.11
0.03
-
-
-
2
18
16
0.15
0.04
-
-
-
31
44
13
0.10
0.08
9.2
-
-
76
117
41
0.10
0.02
-
-
-
82
83
1
0.40
0.33
-
-
-
94
95
1
0.40
-
-
-
-
104
108
4
0.32
-
58.1
-
-
106
107
1
0.96
-
39.5
-
-
193
194
1
0.18
0.03
49.1
0.09
0.9
TBRC049
3
25
22
0.11
-
-
-
-
including
16
25
9
0.23
-
-
-
-
including
16
17
1
0.52
0.07
-
-
-
21
22
1
1.25
-
-
-
-
64
66
2
0.31
0.05
-
-
-
97
101
4
0.15
0.03
-
-
-
127
128
1
0.25
-
-
-
-
137
139
2
0.12
-
-
-
-
142
143
1
0.19
-
-
-
-
170
171
1
0.18
-
94
-
-
11
12
1
0.41
-
10.8
-
-
42
43
1
0.2
-
9.5
-
-
142
143
1
0.17
-
-
-
-
152
153
1
0.21
-
-
-
-
TBRC050
including
TBRC051
including
TBRC052
including
158
177
19
0.21
0.03
21
-
0.53
162
163
1
2.09
0.05
178
0.16
6.91
169
170
1
0.53
0.3
15.9
-
-
173
174
1
0.52
-
10.1
-
-
15
17
2
0.3
-
-
-
-
85
86
1
0.33
-
-
-
-
98
102
4
-
0.38
-
-
0.82
129
130
1
0.18
-
36.8
0.12
2.69
137
140
3
0.2
-
21.0
-
-
148
174
26
0.1
-
35.4
-
-
157
158
1
0.07
0.24
88
0.07
0.38
163
165
2
0.35
0.03
24.5
-
0.41
185
186
1
0.31
-
-
-
-
15
16
1
0.18
1.4
29.1
-
-
27
29
2
0.31
0.03
-
-
-
38
39
1
0.27
-
16.5
-
-
67
68
1
0.3
-
19.6
-
-
132
138
6
0.21
-
52.6
-
1.85
134
135
1
0.45
-
98.6
-
1.50
8
Comment
Tungsten Lode
Tungsten Lode
Hole ID
TBRC053
including
TBRC054
including
TBRC055
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
(m)
(m)
%
%
g/t
%
%
148
154
6
0.18
-
18.1
-
0.71
169
170
1
0.15
-
15.1
0.09
2.14
188
190
2
0.17
0.04
143
0.11
0.73
77
78
1
0.08
1.08
38.6
-
0.46
83
91
8
0.15
-
61.4
0.11
0.53
88
89
1
0.47
-
11.1
-
1.66
96
97
1
0.21
-
19.3
-
-
1
2
1
0.15
-
-
-
-
15
25
10
0.11
-
-
-
-
16
17
2
0.24
-
32.7
-
-
23
25
2
0.33
-
-
-
-
37
39
2
0.13
-
-
-
-
73
74
1
0.21
0.04
141
0.1
-
97
99
2
0.14
0.04
66.5
0.06
0.72
127
130
3
0.17
-
35.4
0.06
0.28
142
144
2
-
0.19
31.2
0.06
-
4
5
1
0.11
-
-
-
-
64
69
5
0.1
-
10.5
-
-
119
120
1
0.16
-
26.9
-
-
149
165
16
-
0.11
35.6
-
-
151
152
1
-
0.45
-
-
-
157
158
1
0.34
-
423
0.28
0.63
160
161
1
-
0.73
17.1
-
-
201
202
1
0.05
0.59
18.1
-
-
206
207
1
0.1
-
-
-
-
208
209
1
0.16
-
-
-
-
212
213
1
0.12
0.08
37.8
0.09
0.48
TBRC056
17
29
12
0.13
-
-
-
-
including
26
27
1
0.48
-
-
-
-
46
50
4
0.11
-
-
-
-
68
78
10
0.31
0.05
-
-
0.51
69
70
1
0.94
-
-
-
-
71
72
1
0.4
0.29
-
-
-
74
75
1
0.86
-
41.7
0.05
3.17
including
including
84
93
9
0.12
-
16.0
-
0.62
84
86
2
0.26
0.04
45.6
-
1.17
99
105
6
0.11
-
-
-
0.34
101
102
1
0.32
-
-
-
-
112
114
2
0.09
-
75.9
0.05
4.33
TBRC057
33
39
6
0.49
-
40
-
-
including
34
35
1
2.3
0.04
83.8
-
-
88
94
6
0.39
0.42
31.4
-
0.51
88
90
2
0.83
1.14
85.4
-
1.25
157
158
1
1.14
-
16.6
-
0.94
including
including
including
9
Comment
Tungsten Lode
Tungsten Lode
Hole ID
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
(m)
(m)
%
%
g/t
%
%
174
196
22
0.19
-
-
-
-
including
191
192
1
3.75
-
-
-
2.10
TBRC058
33
37
4
0.29
-
27.1
-
-
88
90
2
0.79
-
19.7
-
-
124
161
37
0.17
0.05
-
-
-
135
137
2
1.07
0.28
-
-
1.30
147
148
1
1.15
-
-
-
-
158
161
3
0.49
-
-
-
-
TBRC059
9
28
19
0.27
-
-
-
-
including
17
28
11
0.44
-
-
-
-
including
19
24
5
0.83
-
-
-
-
57
59
2
0.21
-
115
-
-
143
145
2
0.04
0.34
-
-
-
42
46
4
0.1
0.03
-
-
-
55
56
1
0.13
0.07
12.5
-
-
63
65
2
0.12
1.15
164
-
-
69
70
1
-
0.18
37.2
-
-
140
141
1
0.17
-
71.1
-
-
147
167
20
0.1
-
-
-
-
150
151
1
0.51
-
-
-
-
159
160
1
0.37
0.03
-
-
0.81
17
18
1
0.17
-
-
-
-
38
40
2
0.11
-
10.3
-
-
49
57
8
0.12
-
-
-
-
including
52
53
1
0.38
0.12
-
-
-
72
77
5
0.2
-
-
-
-
including
72
74
2
0.42
0.04
-
-
-
including
TBRC060
including
TBRC061
10
Comment
Tungsten Lode
Tungsten Lode
This report has been approved for release by the Board of Directors.
ABOUT SKY (ASX: SKY)
SKY is an ASX listed public company focused on the exploration and development of high value mineral resources in Australia.
SKY’s project portfolio offers exposure to the tin, gold, and copper markets in the world class mining jurisdiction of NSW.
TIN PROJECTS
TALLEBUNG PROJECT (EL6699, 100% SKY)
The Tallebung Project is located ~70km north-west of Condobolin in central NSW. The project encompasses the historic
Tallebung Tin Mining Field at the northern extent of the Wagga Tin Belt within the central Lachlan Orogen where SKY has
now defined a maiden MRE of 10.2Mt @ 0.18% Tin*. SKY plans to advance the Tallebung by increasing the resource to the
16-21Mt* Exploration Target and progress development for future mining (*SKY ASX Announcement 22 March 2023).
DORADILLA PROJECT (EL6258, 100% SKY)
The Doradilla Project is located ~ 30km south of Bourke in north-western NSW and is a large and strategic REE and tin
project with excellent potential for associated polymetallic mineralisation (tungsten, copper, bismuth, indium, nickel, cobalt).
NARRIAH PROJECT (EL9524, 100% SKY)
The Narriah Project is located ~70km west of West Wyalong in western NSW and represents a large tin project with
multiple historic workings prospective for tin, tungsten and lithium mineralisation with limited drill testing completed to date.
NEW ENGLAND PROJECT (EL9200 & 9210, 100% SKY)
Two exploration licences in the New England Orogen covering areas of significant historical tin production.
COPPER GOLD PROJECTS
IRON DUKE (EL6064, BALMAIN; EL9191 100% SKY)
The Iron Duke project is located ~10km southeast of Tottenham in central NSW and covers
at least 4 significant historic copper-gold
mines. High grade copper-gold mineralisation
intersected by previous explorers (e.g. 13m @
1.56% Cu & 4.48g/t Au).
GALWADGERE (EL6320, 100% SKY)
The Galwadgere project is located ~15km
south-east of Wellington in central NSW. An
open MRE of 3.6Mt @ 0.78% Cu and 0.28g/t Au
defined at Galwadgere with numerous targets
with limited drilling testing adjacent to the MRE.
GOLD PROJECTS
CULLARIN / KANGIARA projects (EL7954;
EL8400 & EL8573, DVP JV)
The Cullarin Project contains equivalent host
stratigraphy to the McPhillamys deposit with a
similar geochemical, geophysical & alteration
signature. ‘McPhillamys-style’ gold results
from previous drilling at the Cullarin Project.
SKY’s maiden drill program was successful,
including HUD002 which returned 93m @ 4.2 g/t
Au from 56m.
CALEDONIAN / TIRRANA PROJECTS
(EL8920, EL9048, EL9120 100% SKY)
Highlight, ‘McPhillamys-style’ gold results
from previous exploration include 36m @ 1.2
g/t Au from 0m to EOH in drillhole LM2 and 81m
@ 0.87g/t Au in a costean on EL8920 at the
Caledonian Project.
Figure 4: SKY Tenement Location Map
11
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver
Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee of Sky
Metals Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr.
Davies consents to the inclusion in this report of the matters based on his information in the form and context in
which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www. asx.com.au). The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves
and resources, production levels and rates, costs, prices, future performance or potential growth of Sky Metals
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Sky Metals Ltd.
Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may
differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been,
and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining,
and Metallurgy and Australian Institute of Geoscientists.
12
JORC CODE, 2012 - TABLE 1
Section 1 Sampling Techniques and Data – TALLEBUNG PROJECT
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling techniques
Explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry
standard measurement tools appropriate to the minerals under investigation, such as downhole
gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
Drill core sampling is by sawn quarter core PQ & half core HQ core. Nominal sample intervals are 1m
with a range from 0.3m to 2.0m.
RC Drilling – the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is
retained for future use if required. 1m intervals are split using a cone splitter on the rig into a
separate calico at the time of drilling.
For RC drilling, assay standards or blanks are inserted at least every 50 samples.
For diamond drilling standards are insert every 30-50 samples.
All sample lab received weights show consistency with core recovery and interval length.
Aspects of the determination of mineralisation that are Material to the Public Report. In cases Each sample was dried, crushed and pulverised as per standard industry practice.
where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a RC Drilling – the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
30 g charge for fire assay’). In other cases, more explanation may be required, such as where
for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
there is coarse gold that has inherent sampling problems. Unusual commodities or
the time of drilling. Where mineralisation has not been logged, 4m composites have been made by using
mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information. a spear to combine equal amounts of samples from each 1m calico.
The primary metal of interest, tin (Sn) and also tungsten (W) were determined by lithium borate fusion
XRF (method GE_IMS92A50 and GE_ICP92A50) – considered appropriate for these elements.
Multielement assaying was completed for 48 elements by 0.25g four-acid digest with ICPMS
determination (method GE_IMS40Q20 and GE_ICP40Q20).
Reverse circulation (RC) drilling using 110mm rods, 144mm face sampling hammer.
Drilling techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by what method, etc)
Drill sample recovery
Method of recording and assessing core and chip sample recoveries and results assessed.
RC drilling - high capacity RC rig was used to enable dry samples collected. Drill cyclone is cleaned
Measures taken to maximise sample recovery and ensure representative nature of the samples. between rod changes and after each hole to minimise cross-hole contamination.
Whether a relationship exists between sample recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of fine/coarse material
Sample weights are recorded for each sample. Recoveries were generally excellent and consistent,
however, if samples were wet the recoveries were less consistent.
There is no known relationship between sample recovery and grade. Where samples recoveries are less
than 95% there is no relationship observed between grade and sample recovery. Relationships between
sample recovery and grade are not considered significant where recoveries exceeded 95% in fresh rock.
13
Criteria
Logging
Explanation
Commentary
Whether core and chip samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography
The total length and percentage of the relevant intersections logged
Systematic geological and geotechnical logging was undertaken when the holes were originally drilled.
Data collected includes:
Nature and extent of lithologies.
Relationship between lithologies.
Amount and mode of occurrence of ore minerals.
Location, extent, and nature of structures such as bedding, cleavage, veins, faults etc.
Structural data (alpha & beta) are recorded for orientated core.
Geotechnical data such as recovery, RQD, fracture frequency, qualitative IRS, microfractures, veinlets and
number of defect sets. For some geotechnical holes the orientation, nature of defects and defect fill are
recorded.
Both qualitative and quantitative data is collected.
RC chips, half core (HQ) & ¾ core (PQ) samples are retained in trays for future reference.
A representative sample of each one metre RC interval is retained in chip trays for future reference.
All chips were geologically logged.
Sub-sampling techniques
and sample preparation
If core, whether cut or sawn and whether quarter, half or all core taken
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry
For all sample types, the nature, quality and appropriateness of the s
Share your feedback
Discover