TALLEBUNG TIN PROJECT, NSW – DEVELOPMENT UPDATE
OUTSTANDING ORE SORTING RESULTS DEMONSTRATE EXCEPTIONAL
POTENTIAL FOR LOW-COST PROCESSING
Exceptional results received from the latest TOMRA ore sorting testwork from more
aggressive and high rejection sorting for the Tallebung Tin Project, including:
TBD012 (42-92m) – 0.10% tin sample upgraded to 4.42% tin (44x upgrade) & 342g/t
silver with 83% recovery of tin achieved from 1.9% of the total mass, representing
a 98.1% reduction in the sorted mass.
The results highlight the ideal nature of the Tallebung tin mineralisation for TOMRA XRay Transmission ore sorting technology.
These results bolster the variability testwork at Tallebung announced earlier this year1
with conservative ore sorting demonstrated to achieve consistent, strong upgrades
across the entire deposit while maximising tin recoveries. Results included:
TBD005 (206-232m): 0.17% tin upgraded 6.6x to 1.10% tin (99.1% tin recovery)
TBD008 (152-169m): 0.14% tin upgraded 5.1x to 0.70% tin (98.6% tin recovery)
TBD005 (2-22m):
0.21% tin upgraded 6.5x to 1.38% tin (99.3% tin recovery)
Optimisation work will aim to continue to improve on the latest results to maximise tin
upgrade with a large mass reduction, while maintaining high tin recoveries. This means
that a plant can be built to a fraction of the size otherwise required.
Additionally, assay results are expected imminently for the 13-hole Reverse Circulation
(RC) drilling program completed to in-fill and extend the high-grade tin mineralisation
discovered in the 150m step-out hole to the south, where results included:
TBRC078:
11m @ 1.02% tin, 77.9g/t silver & 0.13% tungsten from 64m
SKY CEO Oliver Davies commented: “Tallebung has once again shown that it is an ideal deposit for ore sorting and
has exceptional potential for low-cost tin production. This huge upgrade of tin into very small mass with more
aggressive ore sorting shows that there is outstanding potential at Tallebung to further reduce potential project
Capex and Opex. As only a very small fraction of the mined mass requires processing after ore sorting, the plant
can be built to a fraction of the size otherwise required to produce the same amount of tin concentrate. This
reduces the project Capex and substantially reduces the operating costs to produce a saleable tin concentrate.
These results show that there is excellent potential to continue to optimise the use of ore sorting in the planning
for tin production at Tallebung. SKY will now work to maximise tin upgrade and mass rejection while minimising
any tin losses in the ore sorting process.”
1 Please see SKY ASX Announcement 23 January 2024 for more details.
SKY METALS LIMITED
+61 2 6360 1587
2 HAWTHORN PLACE, ORANGE NSW 2800
WWW.SKYMETALS.COM.AU
ABN 46 098 952 035
The Board of Sky Metals Limited (‘SKY’ or ‘The Company’) is pleased to report outstanding results from the latest
TOMRA ore sorting testwork on tin mineralisation samples from the Tallebung Tin Project, NSW.
TALLEBUNG PROJECT (EL 6699, SKY 100%)
ORE SORTING TESTWORK
The latest ore sorting testwork has shown a substantial increase in tin grade with reasonable recovery of tin in
less than 2% of the original mass. This result shows the potential for greater tin grade increases and mass
reduction from TOMRA ore sorting, with the payoff between upgrade and tin recovery to be optimised in further
testwork (Figure 1 and Table 1).
In addition to delivering a much higher tin grade, the benefits of ore sorting and mass reduction include:
Reduced Capex as only a fraction of the sorted mass requires processing, a significantly smaller and lower
cost processing plant can be considered to support any future mining operation;
Reduced Opex through less mass to process, less selective bulk-mining techniques and lower processing
costs;
Excellent environmental outcomes including:
– A small fraction of the water will be required to produce saleable tin concentrates;
– A small fraction of the power will be required to produce saleable tin concentrates tin; and
– Reduced mine footprint including smaller waste emplacements such as tailings dams.
Table 1: Tallebung Tin Project – Results for the TOMRA ore sorting testwork. Silver (Ag) shows a strong upgrade
and reasonable recovery with the tin (Sn) in the sorted products, however tungsten (W) appears to be largely
upgraded in the ‘Fines’ fraction. NB: The ‘High Recovery’ product includes the ‘High Upgrade’ sorted sample.
Sample
Head Sample
before sorting
8-32mm High
Upgrade Sort
8-32mm High
Recovery Sort
8-32mm Sorting
Waste
<8mm Fines
(unsorted)
Sn
Grade
%
Sn
Sn
Recovery Upgrade
%
x
Ag
Grade
g/t
Ag
Ag
Recovery Upgrade
g/t
x
W
Grade
%
W
Recovery
%
0.10
100
-
10.7
100
-
0.45
100
4.42
82.9
43.9
342
55.3
29.3
0.01
0.0
0.65
91.5
6.4
57.2
76.0
6.4
0.01
0.2
0.01
8.5
0.1
3.0
8.5
0.1
0.07
11.0
0.14
-
-
8.0
-
-
2.04
88.7
A sample from drillhole TBD012 between 42-92m of PQ half core for a total of 289.2kg was sent to TOMRA Ore
Sorting Solutions test facility in Castle Hill, Sydney, NSW in July this year. The sample was crushed to -40mm and
sized with -8mm fraction retained separately as a fines sample. The 8-32mm sample was then sorted via XRT ore
sorting to obtain a high tin recovery sorting setting. The product (tin-bearing) fraction was then sorted again for a
high tin upgrade sort, intending to recover as much tin as possible from as little mass as possible.
This testwork has demonstrated that a large fraction of the tin can be recovered in a very high-grade product
which is only <2% of the original mass before sorting. This is an outstanding result that demonstrates Tallebung
ore is exceptionally well disposed to the use of ore sorting technology. These results will be incorporated with
previous testwork to design a program of optimisation testwork to improve on this initial result.
2
Results from this program also indicate that a reasonable amount of silver is recovered and upgraded along with
the tin in the ore sorted products. Tungsten shows strong upgrading in the ‘Fines’ fraction. Further work will
continue to assess the recovery of these by-products for additional revenue from the Tallebung Tin Project.
Figure 1: Tallebung Tin Project – Plan showing extent of the current Exploration Target along with the TOMRA
variability study testwork with the latest testwork result shown in orange. Previous TOMRA ore sorting testwork
showed a consistent 4-6x upgrade across the entire deposit, significantly increasing the average grade from
0.15% tin to over 0.70% tin, with this latest result showing that much greater upgrades are also possible with ore
sorting.
For further information:
Investors:
Oliver Davies, CEO – Sky Metals
M: 0430 359 547
Media:
Nicholas Read – Read Corporate
M: 0419 929 046
3
This report has been approved for release by the Board of Directors.
ABOUT SKY (ASX: SKY)
SKY is an ASX listed company focused on the exploration and development of high-value mineral resources in Australia.
SKY’s project portfolio offers exposure to the tin, gold, and copper markets in the world-class mining jurisdiction of NSW.
TIN PROJECTS
TALLEBUNG PROJECT (EL6699, 100% SKY)
The Tallebung Project is located ~70km north-west of Condobolin in central NSW. The project encompasses the historic
Tallebung Tin Mining Field at the northern extent of the Wagga Tin Belt within the central Lachlan Orogen where SKY has an
updated MRE of 15.6Mt @ 0.15% Tin*. SKY plans to advance the Tallebung by increasing the resource to the 23-32Mt1
Exploration Target and progress development for future mining (1SKY:ASX Announcement 23 January 2024).
DORADILLA PROJECT (EL6258, 100% SKY)
The Doradilla Project is located ~ 30km south of Bourke in north-western NSW and is a large and strategic REE and tin
project with excellent potential for associated polymetallic mineralisation (tungsten, copper, bismuth, indium, nickel, cobalt).
NARRIAH PROJECT (EL9524, 100% SKY)
The Narriah Project is located ~70km west of West Wyalong in western NSW represents a large tin project with multiple
historic workings prospective for tin, tungsten and lithium mineralisation with limited drill testing Completed to date.
COPPER GOLD PROJECTS
IRON DUKE (EL6064, EL9191 100% SKY)
The Iron Duke project is located ~10km southeast of Tottenham in central NSW and covers
at least 4 significant historic copper-gold
mines.
High
grade
copper-gold
mineralisation intersected by previous
explorers (e.g. 13m @ 1.56% Cu & 4.48g/t Au).
GALWADGERE (EL6320, 100% SKY –
BML: OPTION TO PURCHASE)
The Galwadgere project is located ~15km
south-east of Wellington in central NSW. An
MRE of 3.6Mt @ 0.78% Cu and 0.28g/t Au at
Galwadgere with numerous targets with
limited drilling testing adjacent to the MRE.
GOLD PROJECTS
CULLARIN / KANGIARA projects (EL7954;
EL8400 & EL8573, 80% SKY-DVP JV)
The Cullarin Project contains equivalent host
stratigraphy to the McPhillamys deposit with
a similar geochemical, geophysical &
alteration signature. ‘McPhillamys-style’ gold
results from previous drilling at the Cullarin
Project. SKY’s maiden drill program was
successful, including HUD002 which returned
93m @ 4.2 g/t Au from 56m.
CALEDONIAN PROJECTS (EL8920 &
EL9120 100% SKY)
Highlight, ‘McPhillamys-style’ gold results
from previous exploration include 36m @ 1.2
g/t Au from 0m to EOH in drillhole LM2 and
81m @ 0.87g/t Au in a costean on EL8920 at
the Caledonian Project.
Figure 2: SKY Tenement Location Map
4
Competent Persons Statement
The information in this report that relates to Metallurgical Results is based on information compiled by Michael
Gunn, who is a Fellow of the Australasian Institute of Mining and Metallurgy. Michael Gunn is a contractor of Sky
Metals Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr
Gunn consents to the inclusion in this report of the matters based on his information in the form and context in
which it appears.
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver
Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee of Sky
Metals Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit under
consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012
Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr.
Davies consents to the inclusion in this report of the matters based on his information in the form and context in
which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www. asx.Com.au). The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves
and resources, production levels and rates, costs, prices, future performance or potential growth of Sky Metals
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Sky Metals Ltd.
Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may
differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been
prepared in accordance with the Australasian Code for Reporting of Exploration Results, Minerals Resources and
Ore Reserves JORC Code 2012.
5
JORC CODE, 2012 - TABLE 1
Section 1 Sampling Techniques and Data – TALLEBUNG PROJECT
(Criteria in this section apply to all succeeding sections)
Criteria
Explanation
Sampling techniques
Commentary
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry Drill core sampling is by sawn quarter core PQ & half core HQ core. Nominal sample intervals are 1m with
standard measurement tools appropriate to the minerals under investigation, such as downhole a range from 0.3m to 2.0m.
gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as
All samples were submitted to SGS or ALS Orange for preparation and assaying.
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
For diamond drilling standards are insert every 30-50 samples.
All sample lab received weights show consistency with core recovery and interval length.
Aspects of the determination of mineralisation that are Material to the Public Report. In cases Each sample was dried, crushed and pulverised as per standard industry practice.
where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a Diamond drilling - core samples were taken at nominally 1m, but with a range between 0.3-2m. PQ core
30 g charge for fire assay’). In other cases, more explanation may be required, such as where
samples are cut in quarters with ¾ retained for reference and metallurgical test work and ¼ submitted
there is coarse gold that has inherent sampling problems. Unusual commodities or
for assay - dried, crushed and pulverised to 90% passing 75 microns.
mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information.
ALS Orange - Forty-eight elements including Ag, As, Cu, Fe, In, Pb, S, Zn are digested by four-acid digest
then analysed by ICPMS (method ME-MS61). Sn and W assays were generated by lithium borate fusion
XRF (method ME-MS85) – considered appropriate for these elements and by XRF fusion for +1% ore
grade assays.
Drilling techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
Diamond Drilling completed by drilling PQ. PQ was drilled to approx. 150m to produce the largest
sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face- sample then cased down to HQ.
sampling bit or other type, whether core is oriented and if so, by what method, etc)
PQ and HQ core was orientated.
Drill sample recovery
Sample weights are recorded for each sample. Recoveries were generally excellent and consistent,
Method of recording and assessing core and chip sample recoveries and results assessed.
Measures taken to maximise sample recovery and ensure representative nature of the samples. however, if samples were wet the recoveries were less consistent.
Whether a relationship exists between sample recovery and grade and whether sample bias may
There is no known relationship between sample recovery and grade. Where samples recoveries are less
have occurred due to preferential loss/gain of fine/coarse material
than 95% there is no relationship observed between grade and sample recovery. Relationships between
sample recovery and grade are not considered significant where recoveries exceeded 95% in fresh rock.
Logging
Whether core and chip samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography
The total length and percentage of the relevant intersections logged
6
Systematic geological and geotechnical logging was undertaken when the holes were originally drilled.
Data collected includes:
Nature and extent of lithologies.
Relationship between lithologies.
Amount and mode of occurrence of ore minerals.
Location, extent, and nature of structures such as bedding, cleavage, veins, faults etc.
Structural data (alpha & beta) are recorded for orientated core.
Criteria
Explanation
Commentary
Geotechnical data such as recovery, RQD, fracture frequency, qualitative IRS, microfractures, veinlets and
number of defect sets. For some geotechnical holes the orientation, nature of defects and defect fill are
recorded.
Both qualitative and quantitative data is collected.
Half core (HQ) & ¾ core (PQ) samples are retained in trays for future reference.
Sub-sampling techniques
and sample preparation
Quality of assay data
and laboratory tests
Verification of sampling
and assaying
If core, whether cut or sawn and whether quarter, half or all core taken
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry
For all sample types, the nature, quality and appropriateness of the sample preparation
technique
Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples
Measures taken to ensure that the sampling is representative of the in-situ material collected,
including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled
Samples were dried crushed and pulverised to 90% passing 75 microns. This is considered to
appropriately homogenise the sample to allow subsampling for the various assay techniques.
SKY: Certified Reference Material (CRM) and blanks were inserted at least every 30 samples to assess the
accuracy and reproducibility of the drill core results. The results of the standards were to be within ±10%
variance from known certified result. If greater than 10% variance the standard and up to 10 samples
each side were re-assayed. SGS conducted internal check samples every 20 for multielement assay.
Sample sizes are industry standard and considered appropriate
The nature, quality and appropriateness of the assaying and laboratory procedures used and
Standard assay procedures performed by a reputable assay lab, ALS Orange - Forty-eight elements
whether the technique is considered partial or total
including Ag, As, Cu, Fe, In, Pb, S, Zn are digested by four-acid digest then analysed by ICPMS (method
For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in
ME-MS61). Sn and W assays were generated by lithium borate fusion XRF (method ME-MS85) –
determining the analysis including instrument make and model, reading times, calibrations
considered appropriate for these elements and by XRF fusion for +1% ore grade assays.
factors applied and their derivation, etc
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
No geophysical tools were used in the determination of assay results.
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have
Certified reference material or blanks were inserted at least every 50 samples. Standards are purchased
been established
from Certified Reference Material manufacture companies: Standards were purchased in foil lined
packets of between 60g and 100g. Different reference materials were used to cover high grade, medium
grade, low grade, and trace ranges of elements, with a primary focus on Sn and W.
Drill data is compiled and collated and reviewed by senior staff. External consultants do not routinely
The verification of significant intersections by either independent or alternative company
verify exploration data until resource estimation procedures are deemed necessary. The intersection
personnel.
calculations were viewed by >1 geological personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data storage (physical
Twinned holes have been used by past explorers to validate the results achieved and have confirmed
and electronic) protocols.
these historic results.
Discuss any adjustment to assay data
Drill Hole Data including: meta data, any gear left in the drill hole, lithological, mineral, survey, sampling,
magnetic susceptibility was collected and stored as physical and electronic copies or entered directly into
an excel spread sheet using drop down codes. When complete the spreadsheet was combined into a
master excel spreadsheet as the drill hole database.
Assay data was provided by SGS via .csv spreadsheets. The data was validated using the results received
from the known certified reference material. Hard copies of the assay certificates were stored with drill
hole data such as drillers plods, invoices, and hole planning documents.
Assay data is not adjusted.
7
Criteria
Location of data points
Explanation
Commentary
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
Specification of the grid system used
Quality and adequacy of topographic control
Historic drill hole collars were located using either a licenced surveyor or on a local imperial or metric
grid. Conversion of the local grid co-ordinates has been undertaken by previous exploration companies.
SKY has used DGPS surveying of drillholes (± 0.1m) to accurately locate them.
All coordinates are based on Map Grid Australia Zone 55E, Geodetic Datum of Australia 1994.
Historic drill hole collars were located using either a licenced surveyor or on a local imperial or metric
grid. SKY has used DGPS surveying of drillholes (± 0.1m) to accurately locate them, or handheld GPS (+/3m). Where handheld GPS has been used SKY will DGPS them at a later date.
Data spacing and
distribution
Data spacing for reporting of Exploration Results
At this stage, drilling of the MRE area of the project has been drilled to at least approximately 80m x 80m
Data spacing for reporting of Exploration Results Whether the data spacing, and distribution is down to 40m x 40m for inferred and indicated resources respectively. Outside of the MRE are, data
sufficient to establish the degree of geological and grade continuity appropriate for the Mineral spacing is variable as the focus is on geological mapping and identifying new zones of mineralisation.
Resource and Ore Reserve estimation procedure(s) and classifications applied
Whether sample compositing has been applied
The maiden MRE was estimated to inferred and indicated and increases in resource confidence will
require tighter spaced drilling, such as some of the drilling completed in this program.
Sample Compositing is not applied.
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible structures and the Drilling was orientated to cross the mineralisation trend at moderate to high angles. The use of
extent to which this is known, considering the deposit type
orientated core allows estimates of the true width and orientation of the mineralisation to be made.
If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced sampling bias, this should be assessed and reported
No sample bias due to drilling orientation is known. The structural controls on mineralisation is
if material
considered well understood and consistent.
Sample security
The measures taken to ensure sample security
Sample chain of custody has been managed by the employees of Sky Metals who Commissioned the
drilling and transport samples from the drilling rig to assay laboratory.
All samples are bagged in tied numbered calico bags, grouped into larger tied polyweave bags, or placed
in a stillage box and transported to ALS in Orange by SKY personnel. All sample submissions are
documented via ALS tracking system and all assays are reported via email.
Sample pulps are returned to site and stored for an appropriate length of time (minimum 3 years). The
Company has in place protocols to ensure data security.
Audits or reviews
The results of any audits or reviews of sampling techniques and data
The Company has external consultants to verify exploration data for the resource estimation process.
Further details for the MREs can be found in SKY ASX Announcement 22 Match 2023 and SKY ASX
Announcement 23 January 2024.
8
Section 2 Reporting of Exploration Results – TALLEBUNG PROJECT
(Criteria listed in the preceding section also apply to this section)
Criteria
Explanation
Mineral tenement and
land tenure status
Exploration done by
other parties
Commentary
Type, reference name/number, location and ownership including agreements or material issues The Tallebung Project is described by NSW Exploration Licence 6699
with third parties such as joint ventures, partnerships, overriding royalties, native title interests, The tenement is 100% owned by Stannum Pty Ltd, a 100% owned subsidiary of Big Sky Metals Pty Ltd
historical sites, wilderness or national park and environmental settings.
and a 100% owned subsidiary of Sky Metals Ltd.
The Tallebung tenement is overlain by Native Title Determination Application No NC12/1 (Federal Court
No NSD 415/12). A determination of extinguished native title was received over a portion of the
Tallebung Tin Field.
An agreement between for the remainder of the tenement where Native Title has not been
extinguished, an agreement has been reached between Stannum and the Native Titla Applicant to allow
access to the remainder of the tenement.
The security of the tenure held at the time of reporting along with any known impediments to
obtaining a licence to operate in the area
Stannum Pty Ltd have previously Commenced a Right to Negotiate Process (RTN) with the claimant
group with respect to Application No NC12/1 (Federal Court No NSD 415/12). These negotiations have
resulted in a land access agreement to be sign with Stannum Pty Ltd. A determination of extinguished
native title was received over a major portion of the Tallebung Tin Field and Stannum has also signed an
access agreement with the Native Title Applicant for access to the entire lease.
Acknowledgment and appraisal of exploration by other parties
The Tallebung Project area was subject to a modern, large-scale alluvial/colluvial mining by the Tullebong
Tin Syndicate in the period 1963-1972. The Tullebong Syndicate Completed a program of 24 short
diamond holes in 1968-69 designed to test the lode mineralisation at Tallebung.
Pruessag Completed a large-scale assessment of the alluvial tin deposits in 1984-85, including RC drilling,
identifying the potential for a large, low grade alluvial deep lead.
In recent exploration, YTC Resources (now Aurelia Metals Ltd) Completed trenching, diamond drilling,
aircore drilling of tailings, and resistivity geophysics (EH4) at the Tallebung tin field. YTC recognised the
continued potential for both shallow high grade, and large scale low-grade porphyry-style- tin
mineralisation.
Geology
Deposit type, geological setting and style of mineralisation
The Ordovician aged Tallebung Group sediments in the Tallebung Tin Field area outcrop as a sequence of
weakly metamorphosed shales, siltstones, carbonaceous mudstones and minor quartz-rich sandstones.
The rocks are tightly folded, striking NNW at around 330o with variable dips. The tin mineralisation is
thought to be sourced from the Silurian-aged Erimeran granite, which outcrops 2km south of the
Tallebung Tin Field. The Tallebung Tin Field represents a site of significant tin and tungsten production
from high grade, quartz lodes and their associated alluvial and deep lead deposits. The field has been
worked sporadically from the discovery of lode tin in the 1890’s, through to the large-scale open cut
mining of alluvial tin by the Tullabong Tin Syndicate in the period 1963 to 1971. The Tallebung Tin Field
contains significant, tin bearing, unconsolidated sediments which are alluvial to elluvial in nature, poorly
sorted and contain coarse bedrock fragments up to 15cm in a matrix of sandy/silty clay with some iron
oxides and cemented layers. Sediment thickness varies from 5m to 36 metres. The east-trending, tin
bearing leads and deep leads draining the Tallebung lode deposits are the dominant source of historic tin
production from the field. The Tallebung site is now a large-scale derelict mining environment with
approximate at least 1.6km strike of shallow open cuts, large scale tailings dam and decaying mine site
housing and infrastructure.
9
Criteria
Explanation
Commentary
The tin and tungsten bearing quartz reefs are located on the western edge of the worked out alluvial
open pits. The lodes form a well-developed quartz vein stock work zone extending for approximately at
least 1.6km on a 330o trend. Thicker quartz lodes >0.5m