New High-Grade Tin, Silver & Tungsten Zones at Tallebung
Released
Released
Announcement PDF
:
–
• Significant new zones of shallow, high-grade tin-silver mineralisation intersected,
including:
TBRC216:
40m @ 0.24% tin & 26.6g/t silver from 31m, including:
8m @ 0.55% tin & 120g/t silver from 42m.
TBRC201:
2m @ 4.28% tin from 16m.
TBRC195:
12m @ 0.26% tin & 85.6g/t silver from 13m, including:
1m @ 1.41% tin & 341g/t silver from 14m.
• New high-grade tungsten-silver-tin zone identified in the north-west of the deposit, with
results including:
TBRC218:
6m @ 1.32% tungsten, 20.2g/t silver & 0.10% tin from 21m,
10m @ 0.60% tungsten, 80.6g/t silver & 0.10% tin from 53m, including:
3m @ 1.58% tungsten, 173g/t silver & 0.18% tin from 60m.
• Tungsten is a critical mineral and typically trades at well over US$30,000/t1, with prices
increasing steadily as demand tightens as a result of recent Chinese export bans.
• Over 140 RC drill holes completed in the recent program, with a further +100-hole follow-up
program planned to expand new high-grade discoveries and in-fill the Tallebung deposit.
• Drilling expected to re-commence next month, once approvals are received.
• Additional assay results pending, with further updates to be released over the coming weeks.
SKY Managing Director & CEO Oliver Davies commented: “These latest results continue to demonstrate the scale
and quality of the Tallebung Project. The identification of multiple new zones of shallow, high-grade tin and silver
mineralisation, together with the emergence of new high-grade tungsten-silver zones in the north-western part of
the deposit, significantly enhances its development potential.
“With over 140 holes completed in this latest drilling program, more results still pending, and approvals already
submitted for a major follow-up program commencing next month, we are rapidly advancing the Tallebung Tin
Project towards development as a significant new Australian critical minerals asset.”
Watch a video summary of this announcement & engage with SKY here
1
NB: Tungsten concentrate currently trading at USD35,653/t for 55% tungsten oxide equates to over USD81,000/t for
contained tungsten metal. Tungsten concentrates prices from Shanghai Metal Market – 8/9/2025.
SKY METALS LIMITED
+61 2 6360 1587
2 HAWTHORN PLACE, ORANGE NSW 2800
WWW.SKYMETALS.COM.AU
ABN 46 098 952 035
Sky Metals Limited (ASX: SKY) (“SKY” or “the Company”) is pleased to report further excellent assay results from
the recently completed Reverse Circulation (RC) drilling program at its 100%-owned Tallebung Tin Project in NSW.
These latest results continue to expand the mineralised footprint of the deposit and confirm the presence of
multiple new zones of shallow, high-grade tin, tungsten and silver mineralisation.
TALLEBUNG PROJECT (EL 6699, SKY 100%)
TALLEBUNG RC DRILLING CONTINUES TO INTERSECT SHALLOW, HIGH-GRADE TIN-SILVER ZONES
The recently completed, highly successful Reverse Circulation (RC) drilling program at the Tallebung Tin Project
has returned further strong results, confirming the presence of multiple new zones of shallow, high-grade tin, silver
and tungsten mineralisation. These results continue to expand the mineralised footprint of the deposit and support
the potential for a significant upgrade to the deposit tonnage and tenor (see Figure 1).
Figure 1: Plan showing the location of the drill-holes in the latest program, including new assay results, new
extensional drill-holes with assays pending, and selected previously reported highlight drill intercepts. The
boundary of the existing Tallebung MRE is also shown over surface geology.
2
Drill-hole TBRC216 intersected a broad zone of mineralisation with 40m @ 0.24% Sn & 26.6g/t Ag from 31m,
including a high-grade interval of 8m @ 0.55% Sn & 120g/t Ag from 42m. This intercept is located on the new
eastern extension of the deposit and demonstrates the continuity of shallow mineralisation in this new highergrade zone discovered in the latest drilling program.
Additional high-grade intercepts include TBRC201, which returned 2m @ 4.28% tin from 16m, which has discovered
high-grade mineralisation on the western edge of the known deposit footprint, further expanding the deposit and
demonstrating that additional higher-grade zones are yet to be discovered beyond the known extent of the deposit.
In-fill continuity has also been established with TBRC195, which intersected 12m @ 0.26% tin and 85.6g/t silver
from 13m, including a peak interval of 1m @ 1.41% tin and 341g/t silver from 14m. These results confirm the
presence of multiple stacked mineralised zones within the upper levels of the deposit.
NEW HIGH-GRADE TUNGSTEN-SILVER ZONE EMERGING IN NORTH-WEST TALLEBUNG
Drilling in the north-western extension of the Tallebung deposit has identified a new zone of high-grade tungstensilver-tin mineralisation. TBRC218 returned 6m @ 1.32% W, 20.2g/t Ag & 0.10% Sn from 21m, and 10m @ 0.60% W,
80.6g/t Ag & 0.10% Sn from 53m, including a standout interval of 3m @ 1.58% W, 173g/t Ag & 0.18% Sn from 60m.
This emerging zone confirms the excellent polymetallic potential of the Tallebung mineral system. The high-grade
tungsten and silver grades are particularly encouraging for future by-product extraction of tungsten and silver to
bolster the significant tin production already planned at Tallebung.
EXTENSIVE DRILLING PROGRAM COMPLETED, SUBSEQUENT LARGE FOLLOW-UP PROGRAM IMMINENT
A total of 143 RC drill-holes were completed as part of the recent successful program, with a further +100-hole
follow-up program already planned with approvals submitted and planned to commence in the coming weeks.
This next phase of drilling is designed to expand and in-fill the new zones of high-grade mineralisation discovered
in the latest program. The Company’s strategy is to continue to grow the Mineral Resource base to optimise mining
studies and development planning.
Remaining assays from the final holes in the latest program are pending and will be released as they are received
over the coming weeks.
This announcement is authorised for release by the Board of Sky Metals Limited.
Investors:
Oliver Davies – Managing Director & CEO
+61 (0) 430 359 547
Media:
Nicholas Read – Read Corporate
+61 (0) 419 929 046
JOIN SKY METALS’ INTERACTIVE INVESTOR HUB
Visit skymetals.com.au to interact with Sky Metals’ announcements and updates
To watch a video summary of this announcement & engage with SKY click here
3
About the Tallebung Tin Project (100% SKY)
Tallebung stands as an open-pit, technology enabled, near-term tin development project. Tallebung is uniquely
placed to provide secure tin supply, to feed irreplaceable and rapidly expanding tin demand, essential in semiconductors, electronics and solar PV technologies.
The Tallebung Tin Project is located at the site of large-scale historical tin mining in central Western NSW
where tin was first discovered in the 1890s. SKY is progressively defining a large-scale hardrock tin resource
with recent higher-grade tin zones discovered on the margins of the known deposit and exceptional
metallurgical performance demonstrated across the entire known deposit.
The shallow, open-pit tin veins combined with the ideal nature of the tin, hosted as large, discrete grains of
simple tin-oxide (cassiterite minerals), all ideally lends itself to low-cost tin production advantages, including
exceptional X-ray based ore sorting performance, demonstrated to upgrade the tin up to 44x, prior to low-cost
gravity separation to produce a saleable tin concentrate.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver
Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee and
director of Sky Metals Ltd and has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves.’ Mr. Davies consents to the inclusion in this report of the matters based on his information in the
form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www.asx.com.au). The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves
and resources, production levels and rates, costs, prices, future performance or potential growth of Sky Metals
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Sky Metals Ltd.
Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may
differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been,
and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining,
and Metallurgy and Australian Institute of Geoscientists.
4
Table 1: Drillhole coordinates (MGA94 Zone 55).
Hole ID
TBRC172
TBRC173
TBRC174
TBRC175
TBRC176
TBRC177
TBRC178
TBRC179
TBRC180
TBRC181
TBRC182
TBRC183
TBRC184
TBRC185
TBRC186
TBRC187
TBRC188
TBRC189
TBRC190
TBRC191
TBRC192
TBRC193
TBRC194
TBRC195
TBRC196
TBRC197
TBRC198
TBRC199
TBRC200
TBRC201
TBRC202
TBRC203
TBRC204
TBRC205
TBRC206
TBRC207
TBRC208
TBRC209
TBRC210
TBRC211
TBRC212
TBRC213
TBRC214
TBRC215
TBRC216
TBRC217
TBRC218
TBRC219
TBRC220
TBRC221
Easting
(MGA)
461097
461071
461076
460989
460968
460857
460794
460785
460686
460683
460710
460719
460783
460889
460884
460942
460997
461042
460936
460991
460927
461038
460851
460905
460950
460945
460452
460576
460627
460549
460874
460960
460957
460348
460381
460164
460273
460351
460306
460455
460365
460434
460480
460629
460631
460532
460219
460172
460195
460087
Northing
(MGA)
6375985
6376036
6376072
6376183
6376237
6376175
6376218
6376252
6376328
6376283
6376188
6376132
6376075
6376059
6375916
6375935
6375957
6375960
6375993
6375997
6376038
6376132
6376248
6376265
6376305
6376363
6376402
6376380
6376413
6376522
6376540
6376522
6376586
6376791
6376796
6376927
6376848
6376857
6376867
6376929
6376992
6377008
6377044
6377003
6376926
6376951
6377112
6377152
6377161
6377197
RL (m)
DIP
297
295
294
292
292
299
301
298
294
293
300
302
304
296
304
300
300
300
297
298
295
294
294
292
290
289
287
290
292
286
286
287
286
298
296
292
299
296
297
288
286
286
285
284
285
289
284
289
288
297
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-61
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-59
-59
-60
-60
Azimuth
(MGA)
250
250
250
250
250
250
250
250
250
250
250
250
251
251
251
248
248
249
252
254
252
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
250
252
253
254
251
249
250
256
5
Total
Depth (m)
102
120
102
120
120
102
120
102
120
120
120
120
102
102
120
120
120
120
102
120
102
132
120
102
102
102
102
102
102
102
102
120
120
120
120
120
120
102
102
102
102
102
97
120
102
102
120
120
120
120
Comment
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Abandoned due to poor sample at EOH
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Table 2: Tallebung Tin Project – Significant Intercepts.
Hole ID
TBRC172
TBRC173
TBRC174
TBRC176
including
TBRC177
including
TBRC178
TBRC179
TBRC180
including
TBRC181
including
and
TBRC182
TBRC183
TBRC185
TBRC187
TBRC188
including
TBRC189
including
TBRC191
including
including
TBRC193
TBRC194
including
TBRC195
including
and
including
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
37
92
70
73
94
45
45
113
119
12
25
26
38
63
69
14
25
36
115
115
12
17
21
12
9
80
87
93
114
18
55
55
62
66
77
78
92
92
108
111
46
34
57
71
76
13
14
20
32
69
72
(m)
39
93
72
74
95
50
46
115
120
17
31
27
41
64
70
15
26
38
118
116
22
18
22
13
10
84
88
94
115
19
69
56
68
67
80
79
95
93
109
112
47
35
60
79
77
25
15
21
33
73
73
(m)
2
1
2
1
1
5
1
2
1
5
6
1
3
1
1
1
1
2
3
1
10
1
1
1
1
4
1
1
1
1
14
1
6
1
3
1
3
1
1
1
1
1
3
8
1
12
1
1
1
4
1
%
0.11
0.33
0.1
0.11
0.06
0.21
0.4
0.15
0.13
0.29
0.17
0.71
0.1
0.12
0.2
0.15
0.1
1.03
0.12
0.23
0.11
0.14
0.47
0.19
0.11
0.13
0.24
0.15
0.13
0.12
0.11
0.52
0.35
0.81
0.7
1.41
0.68
1.58
0.16
0.07
0.12
0.15
0.16
0.25
0.64
0.26
1.41
0.91
0.35
0.26
0.71
%
0.1
0.06
0.14
0.02
0.12
0.05
0.03
0.4
0.02
0.27
0.76
0.06
0.41
0.04
0.02
4.15
0.13
0.03
0.03
0.02
0.05
0.09
0.05
0.31
0.03
0.1
0.27
1.53
0.31
0.04
0.02
g/t
78.7
10.8
23.2
22.2
33.5
23.1
12.8
31.5
77.7
11.9
20.6
29.4
17.7
26.4
42.4
95.6
10.5
20.2
24.2
85.6
341
272
23
18.9
-
%
0.1
0.1
0.06
-
%
0.48
0.97
0.65
-
6
Comment
Open to EOH
Hole ID
TBRC196
TBRC197
TBRC198
including
TBRC199
TBRC200
TBRC201
TBRC202
including
TBRC203
TBRC204
TBRC205
TBRC206
including
TBRC207
TBRC208
including
TBRC209
TBRC210
TBRC211
TBRC212
including
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
78
40
63
38
57
77
20
27
4
67
95
16
68
12
28
37
40
55
4
75
87
7
92
107
12
15
64
56
77
81
6
16
27
36
43
3
32
51
89
113
114
5
36
43
51
77
82
24
38
71
0
13
13
(m)
79
42
64
39
58
78
29
28
5
69
96
18
70
13
30
43
41
57
5
77
88
10
94
109
13
16
65
59
84
82
7
17
28
39
44
4
33
67
91
117
115
6
38
44
53
78
88
25
42
73
3
23
14
(m)
1
2
1
1
1
1
9
1
1
2
1
2
2
1
2
6
1
2
1
2
1
3
2
2
1
1
1
3
7
1
1
1
1
3
1
1
1
16
2
4
1
1
2
1
2
1
6
1
4
2
3
10
1
%
0.1
0.21
0.13
0.22
0.17
0.19
0.12
0.4
0.16
1.25
0.16
4.28
0.1
0.31
0.11
0.18
0.53
0.52
0.12
0.34
0.96
0.12
0.18
0.18
0.16
0.12
0.11
0.12
0.31
0.19
0.12
0.14
0.17
0.11
0.19
0.14
0.36
1.11
0.1
0.1
0.21
0.2
0.34
0.4
0.14
0.15
1.07
%
0.07
0.03
0.03
0.03
0.02
0.2
0.03
0.03
0.1
0.2
0.89
0.15
0.14
0.03
0.05
0.02
0.10
0.04
1.96
0.08
0.02
0.14
0.12
0.42
0.02
0.02
0.03
g/t
21.3
11.3
33.1
12.3
26.8
46.2
67.4
16.3
38.3
29.8
10.9
14.8
12.1
11.4
453
27.4
25.7
14.6
33
-
%
0.06
0.22
0.07
0.16
-
%
1.59
0.5
-
7
Comment
Tungsten Lode
Tungsten Lode
Silver-tungsten Lode
Hole ID
TBRC213
including
including
TBRC214
including
TBRC215
including
TBRC216
including
including
and
TBRC217
including
TBRC218
including
including
and
including
including
and
including
TBRC219
including
TBRC220
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
33
37
42
48
58
75
93
0
7
19
28
38
42
54
82
57
65
70
63
78
110
113
31
31
42
49
2
3
18
25
25
60
7
8
21
21
25
31
43
43
53
53
60
73
76
78
4
15
16
38
66
8
32
(m)
36
38
43
51
59
76
95
11
11
20
31
48
43
55
84
59
71
71
66
79
114
114
71
54
50
50
9
4
19
26
29
61
15
9
27
23
26
33
46
44
63
54
63
74
85
80
7
23
17
39
67
9
34
(m)
3
1
1
3
1
1
2
11
4
1
3
10
1
1
2
2
6
1
3
1
4
1
40
23
8
1
7
1
1
1
4
1
8
1
6
2
1
2
3
1
10
1
3
1
9
2
3
8
1
1
1
1
2
%
0.1
0.11
0.24
0.11
0.15
0.21
0.18
0.13
0.28
0.14
0.11
0.17
0.79
0.26
0.28
0.29
0.82
0.1
0.3
0.15
0.29
0.24
0.34
0.55
1.49
0.32
1.08
0.14
0.19
0.11
0.13
0.17
0.59
0.1
0.26
0.11
0.34
0.86
0.10
0.16
0.18
0.28
0.99
0.14
0.11
0.12
0.06
0.38
0.4
%
0.03
0.05
0.02
0.03
0.04
0.02
0.04
0.06
0.09
0.39
0.07
0.31
0.02
0.1
0.12
1.32
0.08
7.64
0.05
0.03
0.05
0.60
1.14
1.58
0.24
0.02
0.02
0.09
0.48
0.06
0.76
0.02
0.09
g/t
13
16.4
50.9
13
10
221
90
31.9
26.6
44.7
120
29.1
12.6
23.3
18.5
36.5
20.2
50.6
21.2
28.5
67.2
80.6
25.3
173
15.6
13.3
25.7
29.1
17.8
-
%
0.08
0.06
0.60
0.28
0.12
0.07
0.14
0.14
-
%
0.51
0.8
1.91
-
8
Comment
Silver Lode
Hole ID
TBRC221
including
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
47
64
119
2
13
22
42
43
93
98
(m)
49
65
120
3
15
23
50
44
103
100
(m)
2
1
1
1
2
1
8
1
10
2
%
0.13
0.14
0.12
0.23
0.22
0.3
0.1
0.31
0.15
0.47
%
0.08
0.02
0.02
0.02
-
g/t
13
13.7
14.7
42.6
%
-
%
0.99
9
Comment
Open to EOH
JORC CODE, 2012 - TABLE 1
Section 1 Sampling Techniques and Data – TALLEBUNG PROJECT
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling techniques
Explanation
Commentary
•
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry RC Drilling – the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
standard measurement tools appropriate to the minerals under investigation, such as downhole for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
the time of drilling.
gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
For RC drilling, assay standards or blanks are inserted at least every 50 samples.
All sample lab received weights show consistency with recovery and interval length.
•
Aspects of the determination of mineralisation that are Material to the Public Report. In cases Each sample was dried, crushed and pulverised as per standard industry practice.
where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a RC Drilling – the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
30 g charge for fire assay’). In other cases, more explanation may be required, such as where
for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
there is coarse gold that has inherent sampling problems. Unusual Commodities or
the time of drilling. Where mineralisation has not been logged, 4m Composites have been made by using
mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information. a spear to Combine equal amounts of samples from each 1m calico.
The primary metal of interest, tin (Sn) and also tungsten (W) were determined by lithium borate fusion
XRF (method ALS – ME-MS85) – considered appropriate for these elements. Multielement assaying was
Completed for 48 elements by 0.25g four-acid digest with ICPMS determination (method ALS – MEMS61)
Reverse circulation (RC) drilling using 110mm rods, 144mm face sampling hammer.
Drilling techniques
•
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by what method, etc)
Drill sample recovery
•
•
•
Method of recording and assessing core and chip sample recoveries and results assessed.
RC drilling - high capacity RC rig was used to enable dry samples collected. Drill cyclone is cleaned
Measures taken to maximise sample recovery and ensure representative nature of the samples. between rod changes and after each hole to minimise cross-hole contamination.
Whether a relationship exists between sample recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of fine/coarse material
Sample weights are recorded for each sample. Recoveries were generally excellent and consistent,
however, if samples were wet the recoveries were less consistent.
There is no known relationship between sample recovery and grade. Where samples recoveries are less
than 95% there is no relationship observed between grade and sample recovery. Relationships between
sample recovery and grade are not considered significant where recoveries exceeded 95% in fresh rock.
10
Criteria
Logging
•
•
•
Explanation
Commentary
Whether core and chip samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography
The total length and percentage of the relevant intersections logged
Systematic geological and geotechnical logging was undertaken when the holes were originally drilled.
Data collected includes:
•
Nature and extent of lithologies.
•
Relationship between lithologies.
•
Amount and mode of occurrence of ore minerals.
•
Location, extent, and nature of structures such as bedding, cleavage, veins, faults etc.
Structural data (alpha & beta) are recorded for orientated core.
Geotechnical data such as recovery, RQD, fracture frequency, qualitative IRS, microfractures, veinlets and
number of defect sets. For some geotechnical holes the orientation, nature of defects and defect fill are
recorded.
Both qualitative and quantitative data is collected.
RC chips, half core (HQ) & ¾ core (PQ) samples are retained in trays for future reference.
A representative sample of each one metre RC interval is retained in chip trays for future reference.
All chips were geologically logged.
Sub-sampling techniques
and sample preparation
•
•
•
•
•
•
If core, whether cut or sawn and whether quarter, half or all core taken
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry
For all sample types, the nature, quality and appropriateness of the sample preparation
technique
Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples
Measures taken to ensure that the sampling is representative of the in-situ material collected,
including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled
RC drilling - the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
the time of drilling. Where 4m Composites have been made, a spear is used to split equal amounts of
each metre into the 4m Composite.
Samples were dried crushed and pulverised to 90% passing 75 microns. This is considered to
appropriately homogenise the sample to allow subsampling for the various assay techniques.
SKY: Certified Reference Material (CRM) and blanks were inserted at least every 50 samples to assess the
accuracy and reproducibility of the drill core results. The results of the standards were to be within ±10%
variance from known certified result. If greater than 10% variance the standard and up to 10 samples
each side were re-assayed. SGS conducted internal check samples every 20 for multielement assay.
RC drilling - duplicate samples are collected of re-split intervals. Duplicates generally show excellent
repeatability.
Sample sizes are industry standard and considered appropriate
Quality of assay data
and laboratory tests
•
•
•
The nature, quality and appropriateness of the assaying and laboratory procedures used and
Standard assay procedures performed by a reputable assay lab, (ALS), were undertaken. Forty-eight
whether the technique is considered partial or total
elements Ag, As, Cu, Fe, Pb, S, Zn are digested by four-acid digest then analysed by ICPMS (method MEFor geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in
MS61).
determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc
Sn and W assays were generated by lithium borate fusion XRF (method ME-MS85) – considered
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
appropriate for these elements.
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have
been established
No geophysical tools were used in the determination of assay results.
Certified reference material or blanks were inserted at least every 50 samples. Standards are purchased
11
Criteria
Explanation
Commentary
from Certified Reference Material manufacture Companies: Standards were purchased in foil lined
packets of between 60g and 100g. Different reference materials were used to cover high grade, medium
grade, low grade, and trace ranges of elements, with a primary focus on Sn and Cu.
Verification of sampling •
and assaying
•
•
•
Drill data is Compiled and collated and reviewed by senior staff. External consultants do not routinely
The verification of significant intersections by either independent or alternative Company
verify exploration data until resource estimation procedures are deemed necessary. The intersection
personnel.
calculations were viewed by >1 geological personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data storage (physical
Twinned holes have been used by past explorers to validate the results achieved and have confirmed
and electronic) protocols.
these historic results.
Discuss any adjustment to assay data
Drill Hole Data including: meta data, any gear left in the drill hole, lithological, mineral, survey, sampling,
magnetic susceptibility was collected and stored as physical and electronic copies or entered directly into
an excel spread sheet using drop down codes. When Complete the spreadsheet was Combined into a
master excel spreadsheet as the drill hole database.
Assay data was provided by ALS via .csv spreadsheets. The data was validated using the results received
from the known certified reference material. Hard copies of the assay certificates were stored with drill
hole data such as drillers plods, invoices, and hole planning documents.
Assay data is not adjusted.
Location of data points
•
•
•
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
Specification of the grid system used
Quality and adequacy of topographic control
Historic drill hole collars were located using either a licenced surveyor or on a local imperial or metric
grid. Conversion of the local grid co-ordinates has been undertaken by previous exploration Companies.
SKY has used DGPS surveying of drillholes (± 0.1m) to accurately locate them.
All coordinates are based on Map Grid Australia Zone 55E, Geodetic Datum of Australia 1994.
Historic drill hole collars were located using either a licenced surveyor or on a local imperial or metric
grid. SKY has used DGPS surveying of drillholes (± 0.1m) to accurately locate them, or handheld GPS (+/3m). Where handheld GPS has been used, SKY will DGPS them at a later date.
Data spacing and
distribution
•
•
•
Data spacing for reporting of Exploration Results
At this stage, drilling of the MRE area of the project has been drilled to at least approximately 80m x 80m
Data spacing for reporting of Exploration Results Whether the data spacing, and distribution is down to 40m x 40m for inferred and indicated resources respectively. Outside of the MRE are, data
sufficient to establish the degree of geological and grade continuity appropriate for the Mineral spacing is variable as the focus is on geological mapping and identifying new zones of mineralisation.
Resource and Ore Reserve estimation procedure(s) and classifications applied
Whether sample Compositing has been applied
The maiden MRE was estimated to inferred and indicated and increases in resource confidence will
require tighter spaced drilling, such as some of the drilling completed in this program.
Sample Compositing is not applied.
Orientation of data in
relation to geological
structure
•
•
Whether the orientation of sampling achieves unbiased sampling of possible structures and the Drilling was orientated to cross the mineralisation trend at moderate to high angles, perpendicular to
extent to which this is known, considering the deposit type
mineralisation. The use of orientated core allows estimates of the true width and orientation of the
If the relationship between the drilling orientation and the orientation of key mineralised
mineralisation to be made accurately.
structures is considered to have introduced sampling bias, this should be assessed and reported
if material
No sample bias due to drilling orientation is known. The structural controls on mineralisation is
considered well understood and consistent.
12
Criteria
Explanation
Commentary
Sample security
•
The measures taken to ensure sample security
Sample chain of custody has been managed by the employees of Sky Metals who Commissioned the
drilling and transport samples from the drilling rig to assay laboratory.
All samples are bagged in tied numbered calico bags, grouped into larger tied polyweave bags, or placed
in a stillage box and transported to ALS
Share your feedback
Discover