2025 Annual Report
Released
Released
Announcement PDF
ABN 46 098 952 035
SKY METALS LIMITED
ANNUAL
REPORT
AND ITS CONTROLLED ENTITIES
FOR THE FINANCIAL YEAR ENDED
30 JUNE 2025
SKY METALS LIMITED
and its controlled entities
CONTENTS
Page
Chairman’s Letter
1
Review of Operations
2
Statement of Corporate Governance
11
Directors’ Report
12
Auditor’s Independence Declaration
25
Consolidated Statement of Profit or Loss and Other Comprehensive Income
26
Consolidated Statement of Financial Position
27
Consolidated Statement of Changes in Equity
28
Consolidated Statement of Cash Flows
29
Notes to the Consolidated Financial Statements
30
Consolidated Entity Disclosure Statement
59
Directors’ Declaration
60
Independent Auditor’s Report
61
ASX Additional Information
67
Corporate Directory
69
SKY METALS LIMITED
and its controlled entities
CHAIRMAN'S LETTER
Dear Fellow Shareholders,
I am pleased to present the 2025 Annual Report for Sky Metals Limited.
Throughout the 2025 financial year, we made strong progress in advancing our flagship Tallebung Tin Project in New
South Wales, alongside continued work across our broader portfolio. Tallebung continues to deliver as we progress
the project quickly and carefully through successful work programs towards future tin production.
Tin remains an essential technology metal, and its global demand continues to rise. This growth is primarily driven
by tins essential role in electronics, particularly in AI, semiconductors, solar PV, and electric vehicles (EVs). With
global supply remaining constrained, tin prices have remained robust throughout the year, a positive backdrop for
SKY as we continue to build our tin-focused portfolio.
Our exploration team carried out extensive and successful drilling programs at Tallebung during the year. The project
continues to grow in scale and significance. Notably, results from the application of ore sorting technology, which has
proven highly effective on Tallebung ore, combined with a successful bulk sampling program, has increased our
strong and long-term conviction in the project's economic potential. These milestones further support our view that
Tallebung could once again be one of Australia's producing tin mines.
In addition, we are encouraged by the metallurgical breakthrough recently achieved at the Doradilla Project. We look
forward to advancing this exciting, large-scale opportunity while we remain focused on Tallebung in the coming
months as it advances quickly on its very promising near-term development pathway.
Looking ahead to 2026, our key priorities include:
•
•
•
Launching the next phase of drilling at Tallebung to target both resource growth and definition;
Completing scoping and metallurgical studies to progress toward and beyond feasibility studies; and
Continuing to progress Tallebung towards near-term and stable tin production to support growing global tin
demand.
On behalf of the Board, I sincerely thank our shareholders for your continued support and confidence. I would also
like to recognise the dedication and hard work of our management, exploration, and operational teams throughout
the year. In particular, I extend my personal appreciation to Managing Director Mr. Davies, Non-Executive Directors
Mr. Hill and Mr. Kairaitis, and Company Secretary Mr. Willson.
Sky Metals remains committed to delivering long-term value through responsible, focused exploration and
development anchored by the continued advancement of the Tallebung Tin Project.
Yours sincerely
Norman A. Seckold
Chairman
1
SKY METALS LIMITED
and its controlled entities
REVIEW OF OPERATIONS
Corporate Activities
On 30 September 2024, the Company’s CEO Mr Oliver Davies, was promoted to Managing Director,
On 2 October 2024, the Company issued 1 million shares to the Managing Director,
On 2 October 2024, the Company issued 1 million performance rights to the Managing Director,
On 2 October 2024, 150,000 shares were issued to an employee upon the exercise of employee
performance rights,
On 4 November 2024, SKY announced a $6 million placement to institutional, sophisticated and
professional investors, including the Company’s directors, at A$0.05 per share to advance the Tallebung
Tin Project. The shares were issued in two tranches; 87.6 million shares were issued on 8 November
2024, and 32.4 million shares were issued on 20 December 2024 subsequent to shareholder approval at
a meeting of shareholders held on 16 December 2024. The Company’s Directors participated in the
placement with shareholder approval,
The Company held its Annual General Meeting on 25 November 2024 with all resolutions carried,
On 4 December 2024, the Company issued 15 million performance rights to directors, as approved by
shareholders at the 2024 AGM,
On 9 December 2024, 6 million unlisted options expired,
On 16 December 2024, a meeting of shareholders was held, and various share and option issues were
ratified and approved, including the participation of Directors in the placement announced on 5 November
2024,
On 17 December 2024, 5.5 million unlisted employee performance rights held by the Managing Director
and other employees expired,
On 20 December 2024, 10 million unlisted options were issued to brokers and advisors as part of the
share placement announced 4 November 2024 as approved by shareholders at the meeting held on 16
December 2024.
2
SKY METALS LIMITED
and its controlled entities
REVIEW OF OPERATIONS
Sky Metals Limited (‘SKY’) is an ASX listed public company focused on the exploration and development of high
value mineral resources in Australia. SKY’s project portfolio offers exposure to the tin, gold, copper and base
metal markets in the world class mining jurisdiction of NSW.
Figure 1: SKY Metals - Project Location Map
3
SKY METALS LIMITED
and its controlled entities
REVIEW OF OPERATIONS
TALLEBUNG PROJECT (EL 6699, SKY 100%)
EXPLORATION DRILLING & DEPOSIT EXTENSIONS
Sky Metals expanded the geological footprint of the Tallebung Tin Project through a disciplined and progressive
exploration effort. Drilling commenced in early FY2025 with RC programs in July and August that reaffirmed
widespread mineralisation across multiple structural corridors.
A notable milestone was in September when step‑out drilling (specifically TBRC078) returned 11 m @ 1.02% Sn,
77.9 g/t Ag & 0.13% W from 64m—an intercept located ~150 m south of the existing resource footprint.
April 2025 saw the initiation of an ambitious multi‑rig RC drilling program. Initially planned for ~70 holes (~8,000 m),
the program was expanded mid‑quarter to approximately 150 holes after early high-grade results. By quarter-end,
assays were received for 45 of the completed holes; further drilling and assaying remain ongoing into FY2026.
Figure 2: Plan showing the location of the drill-holes completed in FY2025 programs, including new assay results
in orange, locations of the trenching/bulk sampling sites, and selected previously reported highlight drill intercepts.
The boundary of the existing Tallebung MRE is also shown over surface geology
4
SKY METALS LIMITED
and its controlled entities
REVIEW OF OPERATIONS
TRENCHING & SURFACE SAMPLING
Surface trenching initiated in December 2024 effectively targeted near-surface mineralisation zones and helped
refine geological interpretation and drill targeting. Results released in January 2025 confirmed substantial nearsurface mineralisation, reinforcing Tallebung’s suitability for shallow open-pit mining scenarios.
Figure 3: LHS: photo looking down and south-southwest across trench T4, which was completed above drill-hole
TBRC034. The trench is approximately 0.5m deep and 1-1.5m wide. The margins of the trench are demarcated,
along with the channel made for the channel sample and a quartz-cassiterite (tin) vein cross-cutting the trench.
RHS insert shows a closer image of the quartz-cassiterite (tin) vein with the visible cassiterite (tin) being the
black/grey zones within the vein (further details are provided in table 3 & 4).
BULK SAMPLING & METALLURGICAL TESTWORK
A cornerstone of FY2025 operations was the bulk sampling metallurgical program. During the March 2025 quarter,
Sky extracted over 70 tonnes of material across four bulk samples—strategically sourced to represent grade
variability and deposit extents.
These samples were crushed (-40 mm), screened, and processed through TOMRA’s XRT ore sorting technology.
Initial full-scale testwork demonstrated extraordinary uplift: tin grades were dramatically enhanced with strong
recoveries, while mass was significantly reduced.
5
SKY METALS LIMITED
and its controlled entities
REVIEW OF OPERATIONS
Figure 4: Left – Excavating the bulk sample from trench T7 and loading directly into a waiting truck; Middle –
Sample being loaded into the crushing and screening plant in Condobolin, where the sample was crushed to 40mm and screened to separate the -7mm fines; Right – Sample awaiting transport after being loaded into bulk
bags for transport to TOMRA Ore Sorting Solutions, Sydney for full-scale ore sorting testwork before downstream
concentrating in pilot-scale processing plants at ALS Perth and then ALS Burnie.
ORE SORTING VARIABILITY TESTWORK
Complementing bulk sorting, earlier TOMRA variability work on drill samples yielded consistent and exceptional
results: grade upgrade factors ranged from 4.6× to 6.6×, average tin recovery exceeded 98%, and only 15–24% of
feed mass was retained as sorted product.
A highlight results was achieved using a double ore storing approach to aggressively ore sort the Tallebung
mineralisation which resulted in an impressive 0.10% tin sample upgraded to 4.42% Sn (~44×) with 83% recovery
and just 1.9% of mass retained.
This result has paved the way for the upcoming bulk sampling testwork procedure to demonstrate further these
exceptional results and optimise the ore sorting process.
6
SKY METALS LIMITED
and its controlled entities
REVIEW OF OPERATIONS
ENVIRONMENTAL & DEVELOPMENT PREPARATIONS
Parallel to exploration, Sky installed groundwater monitoring bores, advanced biodiversity and geochemical
baseline studies, and commenced pilot metallurgical flowsheet work. These steps underpin de-risking of the future
mine permitting and design processes.
Figure 5: Left – Weather station installed at Tallebung, RHS – Groundwater monitoring bores installed to continue
background environmental and permitting processes to streamline Tallebung mining permitting processes.
DORADILLA PROJECT (EL 6258, 100% SKY)
POLYMETALLIC MINERALISATION – METALLURGICAL TESTWORK PROGRAM
A recent review of historic petrology and metallurgical studies at the Doradilla Tin Deposit confirmed that tin is
predominantly hosted in fine cassiterite associated with the Doradilla Tin Target at the south-western end of the
‘DMK’ Line. Importantly, this mineralisation has not previously been evaluated using modern flotation techniques.
This represents a promising development for Doradilla. Work is now underway to validate the historic observations
and, if confirmed, to trial modern flotation methods to assess the potential for producing a saleable tin concentrate.
The program will also seek to establish whether a viable development pathway exists for the Doradilla
mineralisation.
7
SKY METALS LIMITED
and its controlled entities
REVIEW OF OPERATIONS
SKY continues to collaborate with leading metallurgical consultants and research institutions, including UNSW,
ALS Burnie and ANSTO, together with other independent experts. These groups are working to advance a suite of
extraction methodologies targeting rare earth elements, tin, and polymetallic mineralisation along the DMK Line.
The objective is to unlock the high-value, widespread mineralisation already recognised at Doradilla.
Ongoing work programs include data compilation, targeted geophysical surveys where required, and continued
geological studies in partnership with UNSW.
NARRIAH PROJECT (EL 9524, 100% SKY)
MAIDEN DIAMOND DRILLING PROGRAM
During the March Quarter 2024, compilation of historic datasets highlighted strong potential for near-surface tin–
tungsten mineralisation at the Conapaira Mining Reserve, consistent with the extensive historical workings across
the area.
A site visit in the March Quarter included ground-truthing of historical data, geological mapping, and rock-chip
sampling. This confirmed widespread historic workings in close proximity to the Erigolia Granite Margin, where
preserved roof pendants provided additional geological evidence of prospectivity.
Given the favourable geological setting, rock-chip sampling was conducted across outcrops and mine workings.
These returned high-grade tin, tungsten, and silver mineralisation along a strike length exceeding 3 km, with
results including:
• 1.80% Sn, 13.9 g/t Ag & 0.05% Cu (JN240223-05)
• 1.50% Sn, 0.26% W & 14.7 g/t Ag (JN240223-04)
• 1.20% Sn & 1.77% W (JN240223-10)
GEOPHYSICAL MAGNETICS SURVEY
In the September Quarter 2024, a large-scale aeromagnetic survey was flown across a +16 km long prospective
corridor within the Narriah Project. Results from this survey are being integrated with the high-grade rock-chip
results from the Conapaira Mining Reserve to refine drill targeting for large-scale tin and tungsten mineralisation.
Notably, most of the hard-rock tin potential across the Narriah Project remains untested by modern exploration.
The combination of historic data, recent rock-chip results, and new geophysics will be used to design follow-up
drilling aimed at delineating a large-scale, high-grade tin–tungsten system.
CULLARIN PROJECT: GOLD–LEAD–ZINC–COPPER (EL 7954, SKY 80%; DVP JV)
HUME TARGET – DIAMOND DRILLING AND DHEM
Initial drilling at Cullarin successfully validated historical results and confirmed broad zones of high-grade
mineralisation. The standout intercept included:
• HUD002: 93 m @ 4.24 g/t Au & 1.87% Pb+Zn from 56m
Re-assay of historical auger drill pulps also revealed multiple untested gold anomalies. These included the Poplar
Prospect, where assays returned up to 9.91 g/t Au, yet no follow-up exploration has been conducted.
Given the strong potential of these gold prospects, and SKY’s strategic priority to advance its tin portfolio, the
Company remains open to partnering with groups that can accelerate exploration and development at Cullarin.
SKY is supportive of further work at Cullarin given its location within a proven 25 km mineralised corridor.
IRON DUKE PROJECT: COPPER–GOLD (EL 6064 & 9191, 100% SKY)
SKY exercised its option to purchase EL 6064 during the prior year, consolidating 100% ownership of the Iron Duke
Project. The Project encompasses the Iron Duke Shear Zone, a mineralised structure extending for at least 4 km
strike and remaining open to the south. Numerous historic copper workings occur along the zone, including Iron
Duke, Christmas Gift, Monarch, Mount Pleasant, and Silver Linings.
8
SKY METALS LIMITED
and its controlled entities
REVIEW OF OPERATIONS
In the June Quarter 2021, SKY completed a maiden drilling program at the Iron Duke Mine, supported by a VTEM
survey and DHEM, which identified extensions to high-grade copper–gold mineralisation. An RC and diamond
drilling program is planned to further test extensions to the Iron Duke Mine and to systematically evaluate the
undrilled Christmas Gift group of historic mines.
Project activities continue, including detailed review of geophysics, mining records, historic datasets, and drilling
information to refine robust targets for follow-up testing.
CALEDONIAN PROJECT: GOLD (EL 8920 & EL 9020, 100% SKY)
SKY has completed soil sampling, one phase of aircore drilling, two phases of RC drilling, and two diamond drill
holes at the Caledonian Target. A review of SKY’s results alongside historic datasets indicates that the
mineralisation is best interpreted as a shallow, sub-horizontal blanket of oxide and supergene gold developed over
an oxidised skarn.
A shallow aircore program of 38 vertical holes (697 m total) was conducted on 50–100 m spacing across the 600 m
× 400 m area of defined mineralisation. Significant groundwater inflows prevented most holes from reaching
refusal, limiting the ability to adequately test the shallow oxide–supergene concept. These results are being
evaluated alongside previous drilling to refine the exploration strategy and focus on near-surface high-grade
mineralisation.
SKY has also been notified of plans for a solar farm development in the northern part of EL 8920, which coincides
with the Jerrawa Strike. This trend of metallic occurrences is interpreted by SKY as a possible exhalative horizon
with potential to host gold–silver and base metal mineralisation. SKY is working with the solar developers to ensure
that proposed infrastructure does not impact mineralised zones. A gold soil anomaly already delineated at Jerrawa
is scheduled for follow-up in the coming quarters, subject to these ongoing negotiations.
GALWADGERE PROJECT: COPPER–GOLD (EL 6320, 100% SKY)
In 2021, SKY announced a maiden JORC-2012 Inferred Mineral Resource at Galwadgere of 3.6 Mt @ 0.82% Cu &
0.27 g/t Au, prepared by H&S Consultants using SKY’s 2020 drilling results together with prior exploration data.
A follow-up drilling program is scheduled to test extensions to the maiden resource. Soil sampling along strike
from the resource has delineated two copper–gold and multi-element pathfinder anomalies. The northern
anomaly, covering 200 m × 100 m, is coincident with the historic McDowell’s Mine, while a second anomaly to the
south exhibits similar tenor. Both anomalies occur within 3 km of the existing resource and represent high-priority
drill targets to support resource growth.
KANGIARA PROJECT: GOLD (EL 8400 & EL 8573, SKY 80%; DVP JV)
The Kangiara Project, located 30 km north-west of Yass, lies within volcanic and volcaniclastic rocks of the Silurian
Douro Group and is prospective for gold and base metals. The Kangiara Mine operated during the early 1900s,
producing approximately 40,000 tonnes at grades of 16% Pb, 3% Cu, 5% Zn, 280 g/t Ag, and 2 g/t Au from narrow
sulphide veins.
Subsequent work by Paradigm Metals defined an Indicated and Inferred Mineral Resource at Kangiara. SKY’s
more recent desktop studies have identified additional potential for copper–gold mineralisation at the Crosby
Prospect. Field investigations are planned in the coming year to further assess this opportunity.
9
SKY METALS LIMITED
and its controlled entities
REVIEW OF OPERATIONS
No Material Changes
Sky Metals confirms that it is not aware of any new information or data that would materially affect the information
included in market announcements and that all material assumptions and technical parameters in the market
announcements continue to apply and have not materially changed.
Competent Person Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver
Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee of Sky
Metals Limited and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in
the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore
Reserves.’ Mr. Davies consents to the inclusion in this report of the matters based on his information in the form
and context in which it appears.
Tenement Summary
Holder
Tarago Exploration Pty Ltd
(DVP sub)
Ochre Resources Pty Ltd
(DVP sub)
Ochre Resources Pty Ltd
(DVP sub)
Aurum Metals Pty Ltd (SKY
sub)
Aurum Metals Pty Ltd (SKY
sub)
Cuprum Aurum Pty Ltd (SKY
sub)
Balmain Minerals Pty Ltd
(SKY sub)
Balmain Minerals Pty Ltd
(SKY sub)
Stannum Pty Ltd
(SKY sub)
Stannum Pty Ltd
(SKY sub)
Stannum Pty Ltd
(SKY sub)
Stannum Pty Ltd
(SKY sub)
Stannum Pty Ltd
(SKY sub)
Equity
Licence ID
Grant Date
Expiry Date
Units
Area
Comment
Cullarin Project, SKY:
DVP JV
Kangiara
Project,
SKY: DVP JV
Renewal submitted
Kangiara
Project,
SKY: DVP JV
80%
EL7954
19-6-2012
19-6-2028
51
144 km2
80%
EL8400
20-10-2015
20-10-2026
52
147 km2
80%
EL8573
23-5-2017
23-5-2029
17
48 km2
100%
EL8920
5-12-2019
5-12-2025
65
183 km2
Caledonian Project
100%
EL9120
30-3-2021
30-3-2027
50
141 km2
Caledonian Project
2
100%
EL6320
12-10-2004
12-10-2026
14
41 km
Galwadgere Project
- agreement with preIPO
Burrendong
Minerals Ltd
100%
EL6064
21-3-2003
20-3-2028
5
15 km2
Iron Duke Project
100%
EL9191
8-6-2021
8-6-2027
60
174 km2
Iron Duke Project
100%
EL6258
21-6-2004
21-6-2026
38
113 km2
Doradilla Project
100%
EL6699
10-1-2007
10-1-2027
14
41 km2
Tallebung Project
100%
EL9524
8-2-2023
08-02-2029
92
262 km2
Narriah Project
100%
EL9779
15-05-2031
101
287 km2
Narriah Project
100%
ELA6926
-
177
514 km2
Tallebung Project –
Application
Granted on
5-7-2024
Applied for
on 3-7-2024
Table 1: Tenement Summary.
10
SKY METALS LIMITED
and its controlled entities
STATEMENT OF CORPORATE GOVERNANCE
The Board is committed to maintaining the highest standards of Corporate Governance. Corporate Governance
is about having a set of core values and behaviours that underpin the Company's activities and ensure
transparency, fair dealing and protection of the interests of stakeholders. The Company has reviewed its
corporate governance practices against the Corporate Governance Principles and Recommendations (4th
edition) published by the ASX Corporate Governance Council.
The 2025 Corporate Governance Statement was approved by the Board on 19 August 2025 and reflects the
corporate governance practices throughout the 2025 financial year. A description of the Company’s current
corporate governance practices is set out in the Company’s Corporate Governance Statement, which can be
viewed at https://www.skymetals.com.au/corporate-governance/
11
SKY METALS LIMITED
and its controlled entities
DIRECTORS’ REPORT
The Directors present their report together with the consolidated financial statements of the Group comprising
of Sky Metals Limited (‘the Company’) and its subsidiaries for the financial year ended 30 June 2025 and the
auditor’s report thereon.
1.
Directors
The names and particulars of the Directors of the Company at any time during or since the end of the financial
year are:
Norman Alfred Seckold, Chairman
Director since 4 December 2001
Norman Seckold graduated with a Bachelor of Economics degree from the University of Sydney in 1970. He
has spent more than 40 years in the full time management of natural resource companies, both in Australia and
overseas, including the role of Chairman for a number of publicly listed companies.
Mr Seckold is currently Chairman of process technology company Alpha HPA Limited, Executive Chairman of
Nickel Industries Limited a nickel mining and production company operating in Indonesia, and Fulcrum Lithium
Limited, and a Non-Executive Director of Uvre Limited.
Oliver Davies, Managing Director
Director since 30 September 2024
Mr Davies joined SKY as a geologist in 2019. He was appointed to Exploration Manager in 2021, then to CEO
in early 2022 and subsequently to Managing Director in September 2024. Prior to SKY, Mr Davies was in
exploration and operational roles with Evolution Mining and Alkane Resources in NSW and Qld. Mr Davies has
worked closely on several successful NSW discoveries including Evolution Mining’s significant expansion of the
Lake Cowal gold resource and with Alkane’s regional exploration success at Tomingley and Boda.
Rimas Kairaitis
Director since 20 June 2019
Mr Kairaitis is a minerals industry executive with over 25 years’ experience in minerals exploration, project
development, mineral processing and company management in gold, base metals industrial minerals and
speciality materials. From 2006-2016 Mr Kairaitis was the founding Managing Director and CEO of Aurelia
Metals Limited (ASX: AMI), which he steered from a junior exploration company to a profitable NSW based gold
and base metals producer.
Mr Kairaitis is also the Managing Director of process technology company Alpha HPA Limited (ASX: A4N).
Richard Grant Manners Hill
Director since 20 June 2019
Mr Hill is a geologist and solicitor with over 25 years’ experience in the resources sector. He has performed
roles as commercial manager and geologist for several mid-cap Australian mining companies and as Director
and Chairman for a series of successful ASX-listed companies including a founding Director for Aurelia Metals
Limited (ASX:AMI) and Chairman of Genesis Minerals Ltd. He is currently the Chairman of New World
Resources Limited (ASX: NWC), and Chairman of Accelerate Resources Limited. In addition to his corporate,
commercial and fund raising roles, Mr Hill has practical geological experience as a mine based and
exploration geologist in a range of commodities worldwide.
12
SKY METALS LIMITED
and its controlled entities
DIRECTORS’ REPORT
Directors’ and Executives’ Remuneration
For details on the amount of remuneration for each Director, refer to the Remuneration Report below.
2.
Company Secretary
Richard Willson
Company Secretary since 31 July 2019
Richard is an experienced, Non-Executive Director, Company Secretary and CFO with more than 20 years’
experience predominantly within the resources, technology, and agricultural sectors for both publicly listed and
private companies.
Richard has a Bachelor of Accounting from the University of South Australia, is a Fellow of CPA Australia, and
a Fellow of the Australian Institute of Company Directors. He is Non-Executive Chairman of Clara Resources
Limited (ASX:C7A), a Non-Executive Director of MedTEC Holdings Ltd, and Unity Housing Company Ltd; and
Company Secretary of a number of ASX Listed Companies.
3.
Directors’ Meetings
The number of Directors’ meetings and number of meetings attended by each of the Directors (while they were
a Director) of the Company during the financial year are:
Board Meetings
Held
Attended
6
6
5
5
6
6
6
6
Director
Norman A. Seckold
Oliver Davies
Rimas Kairaitis
Richard G.M. Hill
The Board met informally frequently throughout the year.
4.
Principal Activities
The principal activities of the Group during the course of the financial year was the exploration for tin, copper
gold and gold and the investigation of projects involving those activities with the objective of identifying,
developing and exploiting economic mineral deposits. Those activities were undertaken in New South Wales,
Australia.
There were no significant changes in the nature of the activities of the Group during the financial year.
5.
Operating and financial review
Review of Operations
A review of operations of the Group during the year ended 30 June 2025 is provided in the ‘Review of
Operations’ commencing on page 2 of this annual report.
13
SKY METALS LIMITED
and its controlled entities
DIRECTORS’ REPORT
5.
Operating and financial review (Cont’d)
Financial Review
The consolidated loss after income tax attributable to members of the Company for the financial year ended 30
June 2025 was $3,150,526 (2024: $2,027,828).
Business risks
The prospects of the Group in progressing its exploration projects may be affected by a number of factors.
These factors are similar to most exploration companies moving through the exploration phase and attempting
to get projects into development. Some of these factors include:
Risk
Future capital
needs
Exploration and
development
Environmental
Description
The Group does not currently generate cash from its
operations given their stage of development. The
Group will therefore require additional funding to meet
its corporate expenses and continue exploration and
potentially move from the exploration phase to the
development phases of its projects.
Whilst the Group has a strong track record of raising
new capital to fund its activities, there is no certainty
that the Group will be successful in raising additional
capital on acceptable terms in the future that is
sufficient to fund its exploration, feasibility, or
development costs at those times.
The results of the exploration activities may be such
that the estimated resources are insufficient to justify
the financial viability of the projects. The Group
undertakes extensive exploration and product quality
testing prior to establishing JORC compliant resource
estimates and to (ultimately) support mining feasibility
studies. There is a risk that its mineral deposits may not
be commercially viable subject to factors outside of the
Group’s control including development costs, changes
in mineralisation, consistency and reliability of ore
grades and commodity prices.
All phases of mining and exploration present
environmental risks and hazards. The Group’s
operations are subject to environmental regulations
pursuant to a variety of state and municipal laws and
regulations. Environmental legislation provides for,
among other things, restrictions and prohibitions on
spills, releases or emissions of various substances
produced in association with mining operations.
Compliance with such legislation can require significant
expenditures and a breach may result in the imposition
of fines and penalties, some of which may be material.
Environmental legislation is evolving in a manner
expected to result in stricter standards and
enforcement, larger fines and liability and potentially
increased capital expenditures and operating costs.
Environmental assessments of proposed projects carry
a heightened degree of responsibility for companies
and directors, officers, and employees.
14
Mitigant
The Group actively monitors and manages
its liquidity position through cash flow
forecasting to ensure, as far as possible,
that it will have sufficient liquidity to meet its
obligations when they are due, under both
normal and stres