Investor Presentation
Released
Released
Announcement PDF
DEVELOPING A LARGE TIN
PROJECT IN NSW
TO MEET GROWING GLOBAL
DEMAND FOR TIN – A VITAL
TECHNOLOGY METAL
MAY 2024
ASX: SKY
DISCLAI ME R - IMPORTANT INFORMATI ON
Disclaimer
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to be materially different from those expressed or implied by such forward looking information, including risks
associated with investments in private and publicly listed companies such as the Company; risks associated with general economic conditions; the risk that further funding may be required but unavailable for the ongoing development of the
Company’s projects or future acquisitions; changes in government regulations, policies or legislation; unforeseen expenses; fluctuations in commodity prices; fluctuation in exchange rates; litigation risk; restrictions on the repatriation of earnings
by the Company’s subsidiaries; the inherent risks and dangers of mining exploration and operations in general; risk of continued negative operating cashflow; the possibility that required permits may not be obtained; environmental risks;
uncertainty in the estimation of mineral resources and mineral reserves; general risks associated with the feasibility and development of each of the Company’s projects; foreign investment risks in Australia; changes in laws or regulations; future
actions by government; breach of any of the contracts through which the Company holds property rights; defects in or challenges to the Company’s property interests; uninsured hazards; disruptions to the Company’s supplies or service providers;
reliance on key personnel and retention of key employees.
Forward-looking information is based on the reasonable assumptions, estimates, analysis and opinions of management of the Company made in light of their experience and their perception of trends, current conditions and expected
developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. The Company believes that the assumptions
and expectations reflected in such forward-looking information are reasonable.
Assumptions have been made regarding, among other things: the Company’s ability to carry on its future exploration, development and production activities, the timely receipt of required approvals, the price of tin, gold, copper and base metals,
the ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all
factors and assumptions which may have been used. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other
factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such
information. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
No Liability/Summary Information
The Company has prepared the Presentation Materials based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the fairness, accuracy or completeness of the information,
opinions and conclusions contained in the Presentation Materials. To the maximum extent permitted by law, the Company, its related bodies corporate (as that term is defined in the Corporations Act 2001 (Commonwealth of Australia)) and the
officers, directors, employees, advisers and agents of those entities do not accept any responsibility or liability including, without limitation, any liability arising from fault or negligence on the part of any person, for any loss arising from the use of
the Presentation Materials or its contents or otherwise arising in connection with it. Post 1989, exploration results detailed in this presentation have previously been reported to the ASX or in the independent geologist report contained in the
Prospectus lodged on 18 April 2019. Endowment = current resource plus production. Coordinate system on maps is MGA94 Zone55 unless otherwise stated.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee of Sky Metals Ltd and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr. Davies consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
The information in this report that relates to the Mineral Resource Estimate was prepared by Luke Burlet, who is a Member and Chartered Professional (Geology) of the Australasian Institute of Geoscientists. Luke Burlet is a Director of H & S
Consultants and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
2
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr. Burlet consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
ASX: SKY
SKY’S T E AM
EXPERIENCED AND PROVEN MANAGEMENT
NORMAN SECKOLD | Chairman
RICHARD HILL | Non-Executive Director
CAPITAL STRUCTURE
30+ years in the full-time management of natural resource
companies. Past Chairman and Director of listed companies
including Bolnisi Gold NL, Timberline Minerals Inc.,
Perseverance Corporation Ltd, Valdora Minerals NL,
Palmarejo Silver, Kings Minerals NL, Mogul Mining NL, Gold
Corp and Santana Minerals Ltd. Currently Chairman of both
Nickel Industries Ltd and Alpha HPA Ltd.
25+ years experience in the mineral resources sector as a
geologist and solicitor. Mr. Hill has a successful track record
of guiding ASX listed mining companies from the exploration and
discovery phase through to development in a range of
commodities. These have included past roles as founding Director
for Aurelia Metals Ltd, Strandline Resources Ltd and as Chairman
of Genesis Minerals Ltd as well as current Chairman of New
World Resources Ltd and Accelerate Resources Ltd.
Shares on issue
Options & Performance Rights
Share price (close 29 Apr 2024)
Market capitalisation
Cash (31 Mar 2024)
Debt
567.9M
49.9M
~$0.033
~$18.7M
~$3.91M
Nil
BOARD AND MANAGEMENT
RIMAS KAIRAITIS | Non-Executive Director
OLIVER DAVIES | CEO
25+ years experience in minerals exploration and resource
development in gold, base metals and industrial minerals.
In his most recent role, Mr. Kairaitis was founding Managing
Director and CEO of Aurelia Metals (ASX: AMI), which he
steered from a junior exploration company to a profitable NSW
based gold and base metals producer. Mr. Kairaitis is also the
Managing Director of Alpha HPA Limited.
Geologist with SKY since listing in 2019. Previously in exploration
and operational roles with Evolution Mining and Alkane
Resources in NSW and Qld. Mr. Davies has worked closely on
several successful NSW discoveries including Evolution Mining’s
significant expansion of the Lake Cowal gold resource and
Alkane’s exploration success at Tomingley and Boda.
EXPERT GUIDANCE | SKY’s Consultants
Norm Seckold
Richard Hill
Rimas Kairaitis
Richard Willson
Oliver Davies
Chairman
Non-Executive Director
Non-Executive Director
Company Secretary
Chief Executive Officer
SHAREHOLDERS
Aurelia Metals
Board and Management
Top 20 holders
3.2%
9%
48.0%
Tallebung Environmental Mining Approvals: R.W. Corkery & Co. to advise on best practice for environmental studies and mining approvals process.
Tallebung Metallurgy – Gunn Metallurgy, TOMRA Ore Sorting Solutions and ALS Burnie engaged to conduct metallurgical testwork.
Tallebung Resource Estimation – H&SC modelled and estimated the MRE and Exploration Target.
3
ASX: SKY
TIN MARKE T
TIN : VITAL TECHNOLOGY METAL
Fundamental structural demand growth – Triggering supply crunch after
30+ year under investment.
Source: BNEF, Rho Motion, Macquarie Strategy – Apr’ 24
Tin Price (USD/t)
Increase in tin demand (kt/year)
Tin is vital within EVs, Renewable Energy and all electronics.
ASX: SKY
TIN MARKET
TIN: THE FORGOTTEN ELECTRIFICATION METAL
– GLOBAL SUPPLY DISRUPTIONS
– Inelastic tin price – driven by irreplaceable demand in
electronics sector and global electrification.
– Pending Indonesia 2024 export ban – 2nd largest supplier
and 20% of global tin supply.
– Myanmar suspended tin mining – 4th largest supplier
producing 10% of world tin supply.
Global Tin Supply by Country (tpa)
– +30 year under investment in tin supply, metal shortages
inevitable, growing tin price.
– Limited reliable and ethical sources.
5
ASX: SKY
TALLEBUNG TIN PROJECT
MAJOR HISTORIC TIN OPERATION
•
Tin discovered in the 1890s and mined into
the mid-1980s.
•
Small shafts and open pits mined hardrock
tin veins, culminating in large scale alluvial
mining production in the 1960s-70s.
•
Infrastructure already in place from previous
mining includes:
•
•
Powerlines to site.
•
Haul roads constructed to site.
Large scale, hardrock tin deposit still in
place and only minor selective mining
historically.
Aerial Photo - Tallebung Tin Mine Historic Mining and Infrastructure. 6
ASX: SKY
TALLEBUNG TIN PROJECT
TALLEBUNG TIN PROJECT
Low-Cost Mining – Shallow deposit at
surface, very low strip ratio and deposit
grows with every new drillhole.
Exceptional Ore Sorting – Ideally suited to
the deposit and increases grade >5x and
removes 80% of mined mass as waste.
Low-Cost Processing – Simple gravity
circuit for a saleable tin concentrate.
High Payability on Tin Concentrate – over
90% payability on +60% tin concentrates.
Tallebung Tin Mine – Drone Photo looking East down the Central Lead Open Pit .
7
ASX: SKY
TALLE B UN G TIN PROJECT
LARGE HISTORIC OPEN PIT ALLUVIAL MINING OPERATION
Tallebung Tin Mining Field – Drone Photo looking North.
8
ASX: SKY
TALLEBUNG TIN PROJECT
LARGE HARDROCK TIN RESOURCE
• Updated Jan 2024 MRE, totals:
15.6 Mt @ 0.15% Tin for 23kt of contained Tin.
• New Exploration Target estimate:
23 – 32 Mt @ 0.14 – 0.17% Tin
• Tin mineralisation highly amenable to 5x upgrade
using TOMRA Ore Sorting – 0.15% = +0.70% Tin
• 0.70% Tin equivalent to +2.7g/t Au or +2.1% Cu.
• MRE and Exploration Target are open along
strike and up and down dip – only limited by
drilling.
• Maiden Indicated MRE:
5.00 Mt @ 0.16% Tin for 7.93kt of contained Tin.
Schematic Plan View - Tallebung Tin Mine
Recent TOMRA ore sorting upgrade results in yellow.
9
ASX: SKY
TALLE B UN G TIN PROJECT
Cassiterite Ore from Tallebung – Scale in mm
TOMRA – GAME CHANGER
Black Tin – cassiterite “nuggets”
detected by ore sorter and accepted
• Tallebung tin deposit is an ideal deposit for
ore sorting.
Host rock and quartz vein without tin
are rejected by ore sorter
• TOMRA Ore Sorting quintuples grade (+500%).
Schematic of a TOMRA XRT Ore Sorter
• Resource grade increases from 0.15% Tin x 5
= to over 0.70% Tin with +98% tin recovery.
• +80% of mined mass rejected upfront.
• Reduced mass means smaller, lower plant
costs to produce a saleable tin concentrate.
Rejected
Accepted
10
ASX: SKY
TALLE B UN G TIN PROJECT
TOMRA – GAME CHANGER
11
Video Courtesy of Carlos Crowley Vazquez, BOEq and TOMRA Ore Sorting Solutions
ASX: SKY
TALLE B UN G TIN PROJECT
TOMRA – GLOBAL BUSINESS
• TOMRA has installed 232 ore sorters globally
into mining.
• Renison Tin Mine, Australia’s largest
operating tin mine, uses TOMRA Ore Sorters.
• TOMRA Ore Sorters commissioned 6 years
ago in 2018. Operate 24/7, year-round, sorting
1Mtpa ROM.
• Ore sorting at Renison started with rejecting
10-15%, increasing to ~25% of mass after
strong results in first year of operation.
• SKY’s TOMRA Ore Sorting substantially
reduces Capex and Opex, only 1/5th of mass
mined is processed.
12
ASX: SKY
TALLE B UN G TIN PROJECT
SHALLOW, HIGH-GRADE START UP
• Shallow, at surface high-grade tin zone identified for
fast payback potential at commencement of mining.
• Results within the high-grade zone include:
TBD002: 60.2m @ 0.54% Tin from 12.8m.
TBD003: 60.55m @ 0.36% Tin from 23m.
Schematic Cross-Section of Shallow High-Grade Zone
Plan View Aerial Image of the Tallebung Project
13
ASX: SKY
TALLE B UN G TIN PROJECT
LARGE TIN SYSTEM EXPANDING
• Resource expansion drilling program has
commenced.
• Multiple areas show strong tin beyond the already
large 23-32Mt Exploration Target.
• Rock chips average over 2.10% in an untested
historic working almost double the width of tin
mineralisation in the north of the deposit.
• Recent water bore drillhole has intercepted strong tin
over 150m from any previous drilling and almost
double the potential width of the deposit in the
south.
• Deposit remains open in all directions.
• Strong tin rock chips, drill intercepts and intensive
historic workings over broad zones remain untested.
Undrilled quartz vein averaging 2.10% tin with visible coarse
cassiterite-tin mineralisation at the Tallebung Project.
ASX: SKY
TALLE B UN G TIN PROJECT
LOW-RISK PATHWAY SET
TO ADD VALUE QUICKLY
Drilling underway to convert 2332Mt Exploration Target to build
the MRE into a ‘critical mass’
MRE growth to ‘critical mass’ is
the final remaining step before
releasing mining studies
Mining environmental approvals
process has commenced with
background studies and groundwater monitoring bores installed
Drone over the Tallebung Tin Mining Field – Old Crusher and ROM to Southern Open Pit
15
BUILDING AUSTRALIA’S
FUTURE TIN PRODUCTION
Share your feedback
Discover