MAJOR RESOURCE UPGRADE FOR TALLEBUNG
LARGE-SCALE OPEN PIT TIN-TUNGSTEN-SILVER DEVELOPMENT OPPORTUNITY CONFIRMED
32.7Mt Resource surpasses Exploration Target and delivers major uplift in contained tin
and tungsten plus a maiden silver resource ahead of Pre-Feasibility Study
• Updated Mineral Resource Estimate (MRE) establishes Tallebung as a large-scale, tin-
tungsten-silver open-pit development opportunity, providing the foundation for the imminent
Pre-Feasibility Study and marking a significant step toward development.
• New MRE exceeds the upper limit of the previous Exploration Target1
, increasing the
project's tin, tungsten and silver inventory to:
32.7Mt @ 0.16% Tin Equivalent* for 36.8kt of contained tin, 1.14M mtu of contained
tungsten trioxide (WO₃) and 9.94Moz of contained silver at a US$20/t NSR* cut-off.
MRE now contains 58% more tin (126% more tin in Measured and Indicated
Resources), 163% more tungsten and includes a maiden 9.94Moz silver Resource1
.
• Large-scale, shallow, near-surface Resource supports a low-strip, low-capital development
opportunity using proven ore sorting and conventional gravity processing to produce
saleable tin, tungsten and silver products.
• TOMRA ore sorting ideally suited to Tallebung with bulk sample testwork delivering over
10x grade upgrades, supporting the potential for a simple, low-cost processing flowsheet2
.
• New MRE remains open in all directions with further drilling results pending outside of the
updated MRE expected to support continued resource growth and expansion.
• In parallel, Tallebung continues to advance rapidly through the NSW State Significant
Development approval pathway with the Environmental Impact Statement now underway
alongside the completion of the PFS targeted for later this month.
SKY Managing Director & CEO Oliver Davies commented: “The updated MRE has exceeded the upper end of our
previous Exploration Target, establishing Tallebung as one of Australia’s most significant emerging tin-tungsten-
silver development projects. The contained tungsten inventory has more than doubled, while the maiden silver
resource introduces a valuable additional revenue stream that we expect will make a meaningful contribution to
project economics in the upcoming Pre-Feasibility Study.
“Furthermore, the Resource remains open and we believe there is considerable scope to continue to expand the
mineralised system as ongoing drilling continues to demonstrate the scale potential of the project. With the PFS
nearing completion, we are making the transition from exploration success to a development supported by a large
Resource, demonstrated metallurgical performance and an advanced permitting pathway.”
1
For further details on the past MRE for the Tallebung Tin Project please see SKY ASX Announcement 23 January 2024.
2
SKY ASX Announcement 24 October 2022, 6 December 2022, 23 January 2024, 17 September 2024, 5 March 2025, 17 August 2025.
*Refer to NSR and tin equivalent (SnEq) calculation disclosure on page 14.
2
Table 1 – Tallebung MRE showing total tonnage, grade and contained metals at a US$20/t NSR cut-off grade. NB:
Previous MRE cut-off of 0.08% Sn without any WO3 or Ag credits equates to a ~US$23/t NSR at the base case Tin
price of US$37500/t. Additionally, WO3 refers to the Tungsten reported as an oxide for which it is sold and “mtu”
refers to metric tonne units as Tungsten is conventionally reported in, 1 mtu = 10 kg WO3.
MRE
Classification
Tonnes Grade Contained Metal
Mt Sn Eq (%) Sn (%) WO3 (%) Ag (g/t) Sn (kt) WO3 (MTU) Ag (koz)
Measured 0.5 0.22 0.19 0.033 8.3 0.9 16,171 130
Indicated 12.3 0.17 0.14 0.029 8.5 17.0 356,035 3,349
Inferred 19.9 0.15 0.09 0.039 10.1 18.8 767,628 6,461
Total 32.7 0.16 0.11 0.035 9.5 36.8 1,139,835 9,940
Figure 1: Tallebung Project – Top: 3D oblique view of the updated MRE block model coloured by total NSR for
each block with an optimised pit shell. Bottom: Overlaid and faded aerial photograph of the Tallebung site added.
3
Figure 2: Tallebung Project – Cross-sections looking north-northwest showing the block model coloured by total
NSR and drill-hole traces coloured by total NSR. The optimised pit shell reaches the base of the block model,
depth of optimised open pit shell only constrained by depth of drilling.
Sky Metals Limited (ASX: SKY) (“Sky Metals” or the “Company”) is pleased to announce an updated Mineral
Resource Estimate (“MRE”) for its 100%-owned Tallebung Tin-Silver-Tungsten Project in NSW, marking a major
milestone in advancing the Project towards development.
TALLEBUNG PROJECT (EL 6699, SKY 100%)
UPDATED MINERAL RESOURCE ESTIMATE
SKY retained independent geological consultants, Manna Hill Geoconsulting Pty Ltd (“MHGEO”), to provide an
updated MRE for the Tallebung Tin Project. MHGEO compiled 471 holes of over 500 holes drilled at Tallebung to
date, including 356 holes drilled by SKY since the last resource update in 2023, for approximately 63,249 assays in
4
total, to produce the MRE. The MRE has been reported in accordance with the 2012 JORC Code and Guidelines
and the Inferred, Indicated and Measured MRE is shown in Table 1.
RESOURCE EXTENSIONS
In addition to this substantial expansion of the Tallebung MRE, ongoing drilling following completion of the updated
MRE has continued to demonstrate likely further resource growth, delivering further broad, shallow, high-grade
tin-tungsten-silver assays and further expanding the scale of the deposit beyond this Mineral Resource Estimate
(MRE) update. Significant new intercepts include:
TBRC428: 34m @ 0.27% Sn, 0.03% W & 57.7g/t Ag from 39m
TBRC427: 9m @ 0.54% Sn, 0.11% W & 205g/t Ag from 67m
TBRC436 14m @ 0.58% Sn from 1m
TBRC439 10m @ 0.44% Sn from 14m
These results continue to demonstrate the continuity and open-ended nature of the Tallebung mineralised system,
with broad zones of mineralisation extending beyond the limits of the current resource.
Importantly, drill-holes TBRC436 to TBRC439 have identified a new zone of shallow tin-tungsten-silver
mineralisation along the north-eastern margin of the existing deposit that is not included in this updated MRE
(Figure 3).
This discovery effectively expands the known footprint of the Tallebung system and highlights the significant
resource growth potential that remains outside the existing resource boundary. The near-surface nature of these
new zones further strengthens the potential for future open-pit development, providing opportunities for low-strip-
ratio resource additions and early access to higher-grade mineralisation.
MINERAL RESOURCE ESTIMATE – INFORMATION REQUIRED AS PER ASX LISTING RULE 5.8.1
As per ASX Listing Rule 5.8.1 and the 2012 JORC reporting guidelines, a summary of the material used to estimate
the Mineral Resource is detailed below (also in Appendix 1: JORC Table 1, Sections 1-3).
GEOLOGY AND GEOLOGICAL INTERPRETATION
The Tallebung Tin Deposit lies within EL6699 within Girilambone-Wagga Anticlinoral Zone of the Lachlan Fold Belt.
The zone comprises metamorphosed Ordovician aged sediments intruded by Silurian to Devonian granites. The
Tallebung Tin Field is situated in the eastern foothills of the Black Range, a ridge of resistant quartzite and slates
of the Tallebung Group which hosts the Tallebung Tin Deposit. Metamorphosed sediments of this group form the
bedrock to the unconsolidated sediments which host the cassiterite (a tin mineral) bearing buried leads. The
bedrock comprises metamorphosed siltstones and sandstones in altering bands, forming an irregular basement
profile.
The Tallebung Group sediments in the Tallebung Tin Field area outcrop as a sequence of weakly metamorphosed
shales, siltstones, carbonaceous mudstones, and minor quartz-rich sandstones. The rocks are tightly folded,
striking NNW at around 330o
with variable dips. The Tallebung Group has been variously subdivided into five
mappable units by previous workers.
Several potential source granites are present in the region. The Erimeran Granite, a tourmaline and biotite rich
granite crops out to the north and west of the tenement area and is part of an extensive suite of low Ca- high K
granites. The Erimeran Granite is a composite evolved body with both foliated and massive phases and is
considered the probable source of the tin-tungsten mineralised fluids at Tallebung.
5
Figure 3: Plan showing the new MRE with drill-hole collars, previously reported highlight drill intercepts and
highlight drillhole intercepts not included in the new Tallebung MRE are shown over surface geology.
The Erimeran Granite has been dated at 419Ma, but it is likely that a range of Silurian ages is present, and that
further work would subdivide the Erimeran granite into several phases. The massive Derrida Granite is the closest
outcropping granite to Tallebung. This granite is a more mafic high Ca - low K variant that is unlikely to produce tin
mineralisation. The Derrida Granite is thought to be Middle to Late Silurian in age (~420Ma).
The Tallebung Tin Field represents a site of significant tin and tungsten production from high grade, quartz lodes
and their associated alluvial and deep lead deposits. The field has been worked sporadically from the discovery
of lode tin in the 1890’s, through to the large-scale open cut mining of alluvial tin by the Tullabong Tin Syndicate in
the period 1963 to 1971, with mining finally concluding in the mid-1980s.
6
The tin (Sn), tungsten (W) and silver (Ag) bearing quartz reefs on the Tallebung Tin deposit are located on the
western edge of the worked out alluvial open cuts. The lodes form a well-developed quartz vein stock work zone
extending for approximately 2.1km on a 330o
trend and are open along strike. Thicker quartz lodes greater than
0.5m have been selectively exploited in historic shafts and shallow open cuts along the trend.
The meta-sediments are weakly to moderately ‘bleach’ altered with an alteration assemblage of silica-sericite-
chlorite. Bleaching alteration is more strongly developed as selvages to strongly mineralised vein packages. Tin
mineralisation occurs as cassiterite, hosted in mineralised quartz-sulphide veins including, in varying proportions:
pyrite, pyrrhotite, arsenopyrite, sphalerite, galena, scheelite, cassiterite, chalcopyrite, bornite, wolframite.
The geological interpretation shows that tin bearing quartz vein structures occur as discrete moderate east
dipping quartz vein ‘packages’ or ‘lodes’ interpretated to represent zones of structural dilation. The structural
preparation and dilation of the host units is related to folding and deformation processes producing an anticlinal
fold with a series of north-northwest sub-vertical faults. Post mineralisation development of the Cobar Basin has
produced four identified northeast striking fault structures, which are interpreted from regional aeromagnetic
images and confirmed from structural measurements from orientated drill core.
The Tallebung tin mineralisation is hosted in quartz-cassiterite veining within a predominately homogeneous
sequence of less than 1m thick interbeds of sand and siltstones of the Tallebung Group which have been deformed
into tight isoclinal folds. Tin mineralisation is hosted in stockwork quartz veining or larger tensional quartz veins
+/- cassiterite + pyrrhotite + sphalerite + arsenopyrite + scheelite + chalcopyrite + wolframite + silver sulphur-
salts. Within veining at Tallebung, the tin mineralisation occurs as cassiterite and is present as large, often 5-10mm
wide ‘nuggets’, Tungsten is present as large often 20-50mm ‘clots’ and silver is present as coarse disseminations
of silver halides and sulphides commonly associated with blebs of Cu-Pb-Zn sulphides.
DRILLING TECHNIQUES AND DRILL HOLE SPACING
The Mineral Resource Estimate for Tallebung is based only on core samples from diamond drill (DD) holes and drill
chip samples from reverse circulation (RC) percussion holes. Core/sample recovery has been recorded in many
cases and efforts were made to maximise recovery and, therefore, sample representivity. Details of sampling
procedures for earlier holes are limited but from inspection of the core at the W B Clarke Geoscience Centre where
the original drillcore is stored it appears that ‘industry standard’ methods of the time were employed and the drilling
is summarised in Table 2 (further details can be found below in Appendix 1: JORC Code, 2012 - Table 1).
Table 2 – Drill hole summary by year and company.
Year Company Holes Metres Type
Sn
Assays
W
Assays
Ag
Assays
1968-1969 Dominion Mining Ltd 24 1,607.91 DD 1,101 1,101 -
2008 YTC Resources Ltd 7 2,269.4 DD 2,216 2,216 2,216
2019 Sky Metals Ltd. 16 + 1 wedge 4,401.8 RC/DD 4,010 4,010 4,010
2022 Sky Metals Ltd. 34 5,497.2 RC/DD 5,389 5,389 5,389
2023 Sky Metals Ltd. 33 6,456.7 RC/DD 6,382 6,382 6,382
2024 Sky Metals Ltd. 47 8,896.2 RC/DD 8,766 8,766 8,766
2025 Sky Metals Ltd. 195 22,708.0 RC/DD 22,657 22,657 22,657
2026 Sky Metals Ltd. 114 12,693.5 RC/DD 12,728 12,728 12,728
Total 471 64,530.71 63,249 63,249 62,148
7
Generally, drill hole spacing varies from 12m to over 100m. Drill hole spacing is variable across the deposit as the
data spacing has predominately focussed on infill drilling of known extents and identifying new zones of
mineralisation during the feasibility stage of the project. To increase the confidence of the resources in this
updated MRE, a zone of ~60m by ~60m of drilling has been completed to measured status, with spacing of ~12m x
12m to confirm continuity and increase confidence, in an area with previously reported high-grade intervals. Infill
drilling at ~25m x 25m has established continuity of the tin lode in the broader system, however, further infill drilling
is required to increase the confidence for future resource estimations within other zones at ~50m x 50m spacing
completed to date.
SAMPLING, SUB-SAMPLING TECHNIQUES AND SAMPLE ANALYSIS METHOD
For the SKY drill core, sampling is by sawn half PQ & HQ core. Nominal sample intervals are 1m with a range from
0.3m to 2.0m. For RC Drilling, the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is
retained for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
the time of drilling. Historical DD holes, from 1968-1969, were sampled by sawn half core NQ core at intervals up
to 5 metres, although the average length was around 1m or 3 feet. Further sampling of these holes was completed
by YTC Resources (later Aurelia Metals, proceeding owners of the Tallebung Project from 2007-2017) to sample
previously unsampled core in the historic holes via sawn half or quarter NQ core.
Diamond drill holes were drilled as NQ size core for older holes, with triple tube PQ/HQ/NQ for recent SKY and YTC
holes. It is assumed that earlier DD holes were drilled with a standard core barrel. SKY and YTC completed core
orientation where possible but older holes were not orientated. The Reflex core orientation tool was used for the
SKY and YTC holes. All RC drilling were completed using face sampling hammers. RC holes were generally drilled
with a diameter of 144 or 127mm (further details can be found in above Table 2 and Appendix 1: JORC Code, 2012 -
Table 1).
Samples from SKY’s drilling in 2019, 2022, 2024, 2025, 2026 and a minority of samples from 2023 were sent to ALS
Orange for preparation and assaying, included weighing the sample (lab code: WEI-21) and crushing (lab code:
CRU-31) to 70 % passing <2mm. The sample was split (lab code: SPL-22) using a rotary splitter, and pulverised (lab
code: PUL-23). Sn and W were assayed by a lithium borate fusion with an ICP-MS finish (lab code: ME-MS85).
Over limits were assayed by respective ore grade oxidising fusion with an XRF finish analysis (lab codes: Sn-
XRF15b/ME-XRF15b). Historic drilling samples and YTC samples were assayed for Sn and W via glass bead XRF
fusion.
A majority of samples from SKY’s drilling in 2023 were sent to SGS for preparation and assaying, included weighing
the sample, crushing consisting of 70% passing 2mm (lab code: G_CRU_KG). the sample was split and pulverised
(lab code: G_PUL). Sn and W were assayed by a lithium borate fusion with ICP-MS finish (lab code: GE_IMS92A50,).
Over limits were assayed by respective ore grade method (lab code:Sn-GE_ICP92A50 and W by lab
code:GE_ICP92A50 by oxidising fusion with XRF finish). Historic drilling samples and YTC samples were assayed
for Sn and W via glass bead XRF fusion.
For the SKY and YTC samples, Certified Reference Material (CRM) and blanks were inserted at least every 50
samples to assess the accuracy and reproducibility of the results. The results of the standards were to be within
either ±10% variance from known certified results or certified 2 standard deviations depending on the CRM
analysed. If greater than 10% variance or 2 standard deviations, the standard and up to 10 samples each side
were re-assayed. Field duplicates were taken for RC samples and show strong repeatability. ALS and SGS
conducted internal duplicate and check samples every 20 samples as part of their internal QAQC procedures.
QAQC checks and results for standards and blanks are acceptable and demonstrate sufficient accuracy.
For the Sky Metals 2024, 2025 and 2026 drilling programs extensive duplicate sampling was undertaken of selected
intervals from bulk RC field samples. Resampling was completed using a riffle splitter to collect a ~3kg duplicate
8
sample for re-assay through ALS Orange. Results were used to confirm the accuracy of original samples and
assess the nugget effect.
The density for the model was estimated using dry bulk density (DBD) measurements. These were calculated from
weight of drillcore before submersion divided by the drillcore weight before submersion minus the submersed
drillcore weight. This method is effective for fresh rock samples; however, where the sample contained cavities
or extensive clay that could be infiltrated by water, some samples were wrapped in thin plastic cling film to ensure
that the true volume was displaced when submersed in water to obtain a true DBD measurement. These samples
used for DBD measurements were from pieces of representative whole diamond drillcore samples at least 100mm
long.
ESTIMATION METHODOLOGY AND CLASSIFICATION CRITERIA
Data Validation
Collar, survey, and assay files were imported into Leapfrog, where basic validation checks were performed,
including duplicate entries, sample overlaps, unusual assay values, missing intervals, etc. There were 258 missing
intervals and 57 missing values. These intervals were set to 1 ppm for Sn, Ag and W. Assays below the detection
limit were set to 1 ppm for Sn and W and to 0.05 ppm for Ag. Collar elevations were set to the elevation of the Lidar
topographic surface.
The drillhole data used for the Tallebung resource estimate is considered suitable for use in resource estimation.
Domains Used for Resource Estimation
Four faults with an interpreted offset were provided by Sky Metals. These faults were used to generate five fault-
block solids. 50-ppm Sn-grade shells were then generated within each fault block and used as low-grade domains
to constrain grade estimation. There are ten domains, i.e., domains both inside and outside the 50-ppm-grade shell,
for each of the five fault blocks.
The 50-ppm cut-off is well below the previous resource reporting cut-off of 800 ppm and contains almost all the
economically extractable Ag and W mineralisation. The grade shells are presented in Figure 4.
Compositing and Block Model Generation
Most sample lengths are 1 m, and the drillhole data were composited at 1 m intervals. A 1 m composite length is
considered appropriate given the anticipated SMU height of 2.5 m.
Two block modes are required for the LMIK estimate, i.e., an SMU model and a panel model. The panel model
dimensions are 48 m x 48 m x 5 m, and the SMU model dimensions are 8 m x 8 m x 2.5 m.
These models were coded with the above mentioned ten domains using the ten domains mentioned above.
Estimation Method
The mineralisation at Tallebung is complex, with multiple populations and highly skewed distributions. The multiple
populations could not be dominated with an acceptable level of confidence. A resource estimation approach
known as Multiple Indicator Kriging (MIK) is well suited to such mineralisation and was selected by MHGEO for
Tallebung. The MIK estimate will be localised from panels to selective mining unit (SMU) sized blocks; therefore,
it is referred to as a Localised Multiple Indicator Kriging (LMIK) estimate.
MHGEO generated a ground-truth estimate using 12 m x 12 m close-spaced drilling, which was compared with
various domaining and estimation approaches that excluded this close-spaced drillhole data. The estimation
method that most closely matched the ground truth model was an LMIK estimate that was between optimistic and
pessimistic LMIK estimates. This gives confidence that the LMIK approach is appropriate at Tallebung. Learnings
from this work were also used in selecting the domains, variography, estimation parameters, and treatment of
high-grade tails for the LMIK estimate. The LMIK estimation approach is discussed in more detail below.
9
Figure 4. Plan view of > 50 ppm Sn grade shells coloured by fault block and composites coloured by Sn grade.
Estimation of Tin, Tungsten and Silver
The LMIK estimation methodology is as follows:
1. Variography for Sn, Ag and W.
2. Dynamic Anisotropic Kriging (DAK) estimation for Sn, Ag and W in the SMU model for the ten domains.
For a DAK estimate, the variogram and search rotation can vary for each block being estimated to honour
the orientation of the local grade continuity.
3. Define ten 0-1 indicators for Sn, Ag and W (30 indicators in total).
4. Generate variograms of the indicators.
5. DAK estimation of the indicators into the panel model (note the LMIK estimation approach also uses DAK
for the panel kriging). This results in histogram of the Sn, W and Ag grades for every panel.
6. The panel histograms are defined at the point (1 m composite) support. The histograms are changed to an
8 m x 8 m x 2.5 m SMU support using an indirect log-normal correction. During this stage, the stepped
histogram defined by 10 indicators is fitted with a continuous curve, i.e. all values between indicators,
below the lowest indicator and above the highest indicator are defined.
7. The final step is to transfer the histograms of the panels to actual grades within SMU’s. This uses the
grade ranking, from lowest to highest, as determined by the DAK in step 2.
10
Note that the LMIK is performed only within the >50 ppm Sn Domains, and the grades from Step 2 are used in the
<50 ppm Sn Domain. This was because negligible economic mineralisation occurs outside the 50-ppm Sn-grade
shell. All domain boundaries and fault blocks were treated as hard during kriging.
Model Validation
The LMIK estimate was validated by:
1. Comparing the mean Sn, W and Ag grades to isotropic inverse distance and DAK check estimates.
2. Visual comparison of the estimated Sn, W and Ag grades on 40 m spaced sections (for example, Figures
5, 6 and 7).
3. Histogram comparisons for the LMIK, isotropic inverse distance and DAK check estimates.
4. Swath plot comparisons for the LMIK, isotropic inverse distance and DAK check estimates.
These checks confirmed that the estimation has occurred as expected and is valid.
Resource Classification
The resource classification is based on drill spacing. The Inferred resource has been defined using the following
three steps:
• Generate an inverse distance squared estimate of Sn using a 50 m x 50 m x 10 m search with a minimum
of one composite.
• Define the horizontal limits of Inferred by way of a polygon that is based on a drill spacing of approximately
100 m x 100 m or better.
• Define the lower vertical limits of material to be classified as Inferred or higher based on an approximate
drill spacing of 100 m x 100 m using the following coordinate selections:
o Unclassified = RL<110 and Y>6376400 and Y<6376850.
o Unclassified = RL<150 and Y<6376400.
o Unclassified = RL<160 and v2>6376850.
• Combine all three criteria mentioned above and apply them to the panels.
Material classified as Measured has been drilled at 12 m x 12 m intervals, and this classification has been applied
to the SMU block model. A 12 m x 12 m drill spacing is approaching a grade control drill spacing, and the continuity
of the mineralisation can be interpreted at this drill spacing.
The Indicated resource classification was completed by manually wireframing a volume defining the 40 m x 40 m
drilling. MHGEO considered the following criteria when determining that 40 m x 40 m drilling was adequate for
Indicated resource:
• The Competent Persons' experience with other comparable deposits.
• This is a polymetallic deposit, and the classification needs to consider all three variables because all
three variables are economically important.
• Data quality. The data is considered fit for use in the resource estimation.
• An expectation that many more faults exist but have not been able to be defined.
• Limited structural data downhole (drilling is mostly RC).
• High-nuggets and short ranges in variograms. To some extent, the high-nugget probably relates to a
sample size that is too small in the RC drilling.
• Difficulty in interpreting the shape of higher-grade mineralisation in most areas.
• Density and density domains require review.
• Changes to the domaining and estimation methodology materially change the resource estimate.
11
Figure 5: Cross sections of 1m composites and the estimated Sn grades. The sections are 40m thick.
12
Figure 6: Cross sections of 1m composites and the estimated Sn grades. The sections are 40 m thick.
13
Figure 7: Cross sections of 1m composites and the estimated W (above) and Ag (below) grades. The sections are
40m thick.
14
Figure 8: Tallebung Project – Plan view of the Tallebung Deposit coloured by MRE Classification.
CUT-OFF GRADES AND MINING AND METALLURGICAL PARAMETERS
Multi-commodity metal resources within the Tallebung Deposit were defined using a cutoff calculated for a Net
Smelter Return (NSR) equation. This equation combines conservative base-case commodity prices, recovery
factors for each of Sn, W, and Ag, and concentrate payability factors to classify resources.
Tin resources recently estimated in NSW for open pit mining have previously used a 0.05% tin cut-off grade. At a
standalone tin grade of 0.08% Sn, the previous cutoff grade used at Tallebung (SKY ASX Announcement 23 January
2024), an NSR of approximately 23.34 USD/t is given by the equation below in Table 3, hence, to account for the
multicommodity nature of the mineralisation the MRE has used a cutoff of US$20/t as calculated in Table 3 below.
15
Table 3 – Net Smelter Return (NSR) Price and Recovery Factors
Metal Price/Unit Recovery
Concentrate
Payability
Sn US$37,500/t
Sn Grade (%) >0.05% 94.04+(6.43xLoge
(Sn Grade (%)))
95%
Sn Grade (%) <0.05% Sn Grade (%) - 0.015%
Sn Grade (%) <0.015% 0
W US$1,000/MTU 60% 70%
Ag US$50/oz 40% 90%
NSR (USD/t) = (("Sn Grade (%)"*(IF("Sn Grade (%)">0.05,94.04+(6.43*LN("Sn Grade (%)")),IF(("Sn Grade"-0.01)>0,((“Sn Grade
(%)” -0.015)/"Sn Grade (%)")*100,0))/100))*0.95*37500/100)+((("W Grade (ppm)"/10000)*0.6)*0.7*1000)+((("Ag Grade
(g/t)"/31.1034768)*0.9*0.4)*50)
Sn Equivalent (SnEq) = (((((“Sn Grade (%)”)*(IF((“Sn Grade (%)”)>0.05,94.04+(6.43*LN(“Sn Grade (%)”)),IF(((“Sn Grade (%)”)-
0.01)>0,((( “Sn Grade (%)”)-0.015)/( “Sn Grade (%)”))*100,0))/100))/100)*37500)+((( "W Grade
(ppm”)*(231.9/183.9))*0.6)/1000000)*(1000*100)+(( "Ag Grade (g/t)"/ 31.1034768)*0.4)*50)/37500*100
SKY considers the NSR approach and factors above to be conservative based on the shallow nature of the
resources, recovery factors applied, extensive metallurgical testwork completed to date, the nature of metal
zonation within the deposit, likely low-strip ratio, and low-cost processing available based on the exceptionally
favourable metallurgy of the deposit demonstrated through multiple iterations of metallurgical testwork detailed
in previous ASX SKY Announcements including: SKY ASX Announcement 24 October 2022, SKY ASX
Announcement 6 December 2022, SKY ASX Announcement 23 January 2024, SKY ASX Announcement 17
September 2024, SKY ASX Announcement 5 March 2025, SKY ASX Announcement 17 August 2025.
Mining at Tallebung would be via conventional open pit with pit shells generated on fixed mining costs of $5/t (all
prices and costs in AUD), pit walls transitioning from 38 degrees in oxide to 42 degrees in transition to 45 degrees
in fresh rock, informed by geotechnical work already completed by SKY. Metal recoveries and payabilities are as
described above in Table 3, with a total operating cost, including plant, crushing, and associated costs for camp,
water, power, site management, and maintenance, etc., of $19.58/t. Spot prices of $75,700/t Sn, $3,025k/mtu WO3,
and $90/oz Ag were used to provide an ultimate, optimised pit shell. Further details on project economics will be
provided in the imminent Pre-Feasibility Studies to provide more details on the robust potential of the project
economics.
Regarding the exceptionally favourable metallurgy, SKY has conducted extensive metallurgical testwork including
the application of TOMRA Ore Sorting and Dense Medium Separation (DMS). These have shown to significantly
upgrade the tin-tungsten-silver mineralisation by at least 5-10 times or more as shown in the past ASX
Announcements referenced above.
The substantial increase in tin, tungsten, and silver grades and the reduction of mass for more intensive processing
via inexpensive, simple gravity methods by at least 80% have strong potential to make Tallebung tin very