New High-Grade Tin Intercepts at Tallebung
Released
Released
Announcement PDF
:
–
• New high-grade, shallow tin intercepts from ongoing Reverse Circulation (RC) drilling further
enhance the scale and tenor of the Tallebung deposit, with results including:
TBRC153:
15m @ 0.68% tin & 77.2g/t silver from 64m, including:
5m @ 1.22% tin & 219g/t silver from 72m.
TBRC159:
20m @ 0.41% tin from 8m, including:
8m @ 0.66% tin from 8m.
TBRC151:
12m @ 0.56% tin from 58m, including:
4m @ 1.04% tin from 58m.
• Results demonstrate the deposit remains open in all directions, while adding new high-grade
zones within the existing MRE.
• More results will be released over the coming months as the drilling program continues to
target shallow extensions and infill the existing Tallebung MRE.
• Assay results now received for 45 of the 93 holes completed to date, with a further 60
approved holes remaining to be drilled in the coming month.
SKY Managing Director & CEO Oliver Davies commented: “These excellent results provide new, high-grade zones
that will continue to grow our Resources at Tallebung, with these intercepts both expanding and improving the
Tallebung deposit. They reinforce Tallebung’s credentials as an ultra-low-cost potential source of tin supply
thanks to the unique nature of the mineralisation being well-suited to open pit mining and very low-cost
processing.
“Tin continues to trade at more than three times the copper price, accentuating the high-value nature of the nearsurface tin being delineated in this drilling program. Results will continue to flow over the coming months as the
drilling continues, building on the great success the program has already delivered to date.”
Sky Metals Ltd (ASX: SKY) (‘SKY’ or the ‘Company’) is pleased to report the third batch of assay results from the
large Reverse Circulation (RC) drilling program that commenced in mid-April at its flagship 100%-owned Tallebung
Tin Project in central NSW.
TALLEBUNG PROJECT (EL 6699, SKY 100%)
EXTENSIVE RESOURCE GROWTH-FOCUSED RC DRILLING PROGRAM
Assay results for the third batch of samples from ongoing RC drilling at the Tallebung deposit have returned new,
high-grade intercepts in the central area of the deposit, while also expanding the deposit to the east and north.
The deposit continues to remain open in all directions (see Figure 1).
Watch a video summary of this announcement & engage with SKY here
SKY METALS LIMITED
+61 2 6360 1587
2 HAWTHORN PLACE, ORANGE NSW 2800
WWW.SKYMETALS.COM.AU
ABN 46 098 952 035
Figure 1: Plan showing the location of the drill-holes in the latest program, including new assay results, new
extensional drill-holes with assays pending, and selected previously reported highlight drill intercepts. The
boundary of the existing Tallebung MRE is also shown over surface geology.
The latest batch of RC holes (TBRC141-160) were designed to expand the deposit beyond the north-eastern end of
the existing MRE and infill areas of known shallow, high-grade mineralisation.
Drilling successfully discovered shallow extensions to the deposit well beyond the north-eastern margin of the
existing MRE. This demonstrates the deposit remains open and also presents an exciting area to target further
mineralised extensions beyond these drill holes to continue to expand the deposit footprint.
Infill drilling of the south-central zone of the deposit, south and adjacent to the southern open pit, represents a
vital step to increase confidence in the existing MRE. Infill holes have successfully intercepted higher than
anticipated grades of tin in this zone, identifying additional shallow, higher-grade mineralisation, which is likely to
be targeted in the early stages of a future mining operation to facilitate rapid capital payback.
2
The major drilling program continues to rapidly progress, with 91 holes completed to date. A further approximately
60 holes are approved to be drilled over the coming month, with the overall program of approximately 150 holes to
be completed in the next month.
Figure 2: Cross-section of TBRC152 and TBRC153 with previous drilling, showing the shallow dipping
mineralisation near-surface and mineralised vein packages are projected onto the section. Where no intercepts
are shown in the section, the vein packages have been projected from adjacent intercepts. NB: Depth scale on
LHS border is metres from surface.
The remaining holes are designed to further explore the extensions of the Tallebung deposit as new zones continue
to be discovered. Significantly, many of the new zones are located in areas away from historical workings,
suggesting that the best parts of the deposit may be yet to be found. Assays are pending for more than 45
completed holes, with approximately 60 holes yet to be drilled.
A steady stream of results is expected over the next few months as the drilling programs advance. The Company
will continue to provide regular updates as assay results are received.
This announcement is authorised for release by the Board of Sky Metals Limited.
3
Investors:
Oliver Davies – Managing Director & CEO
+61 (0) 430 359 547
Media:
Nicholas Read – Read Corporate
+61 (0) 419 929 046
JOIN SKY METALS’ INTERACTIVE INVESTOR HUB
Visit skymetals.com.au to interact with Sky Metals’ announcements and updates
To watch a video summary of this announcement & engage with SKY click here
About the Tallebung Tin Project (100% SKY)
Tallebung stands as an open-pit, technology enabled, near-term tin development project. Tallebung is uniquely
placed to provide secure tin supply, to feed irreplaceable and rapidly expanding tin demand, essential in semiconductors, electronics and solar PV technologies.
The Tallebung Tin Project is located at the site of large-scale historical tin mining in central Western NSW
where tin was first discovered in the 1890s. SKY is progressively defining a large-scale hardrock tin resource
with recent higher-grade tin zones discovered on the margins of the known deposit and exceptional
metallurgical performance demonstrated across the entire known deposit.
The shallow, open-pit tin veins combined with the ideal nature of the tin, hosted as large, discrete grains of
simple tin-oxide (cassiterite minerals), all ideally lends itself to low-cost tin production advantages, including
exceptional X-ray based ore sorting performance, demonstrated to upgrade the tin up to 44x, prior to low-cost
gravity separation to produce a saleable tin concentrate.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver
Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee and
director of Sky Metals Ltd and has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves.’ Mr. Davies consents to the inclusion in this report of the matters based on his information in the
form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www.asx.com.au). The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
4
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves
and resources, production levels and rates, costs, prices, future performance or potential growth of Sky Metals
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Sky Metals Ltd.
Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may
differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been,
and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining,
and Metallurgy and Australian Institute of Geoscientists.
Table 1: Drillhole coordinates (MGA94 Zone 55).
249
249
253
252
248
248
249
258
269
Total
Depth
(m)
120
120
120
120
120
120
120
120
120
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
-60.97
262.83
120
Completed
285
-60.1
268.11
102
Completed
6376559
286
-59.69
257.64
120
Completed
460705
6376557
287
-60
255.4
120
Completed
TBRC154
460881
6376271
291
-60
250.4
102
Completed
TBRC155
460888
6376289
290
-60
250.4
102
Completed
TBRC156
460905
6376350
291
-60
250.4
102
Completed
TBRC157
460720
6376809
275
-60
240.4
120
Completed
TBRC158
460707
6376785
275
-60
240.4
120
Completed
TBRC159
460709
6376765
275
-60
240.4
120
Completed
TBRC160
460703
6376700
276
-60
240.4
120
Completed
Hole ID
Easting
(MGA)
Northing
(MGA)
RL (m)
DIP
Azimuth
(MGA)
TBRC141
TBRC142
TBRC143
TBRC144
TBRC145
TBRC146
TBRC147
TBRC148
TBRC149
460548
460684
460761
460318
460349
460429
470601
460640
460675
6377017
6377067
6377072
6377098
6377202
6377253
6376717
6376587
6376586
286
281
279
270
281
280
280
285
285
-60
-60
-60
-60
-61
-60
-61
-60
-60
TBRC150
460726
6376611
285
TBRC151
460687
6376633
TBRC152
460666
TBRC153
5
Comment
Table 2: Tallebung Tin Project – Significant Intercepts.
Hole ID
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
(m)
(m)
%
%
g/t
%
%
TBRC140
42
60
18
0.24
0.02
-
-
-
including
50
54
4
0.6
0.04
18.7
-
-
85
87
2
0.11
-
-
-
-
TBRC141
20
27
7
0.33
-
11.4
-
-
TBRC142
1
2
1
0.08
-
-
-
-
TBRC144
0
2
2
0.18
0.03
-
-
-
12
45
33
0.13
0.03
17.8
-
-
including
12
30
18
0.18
0.03
-
-
-
including
15
16
1
1.74
0.05
-
-
-
and
25
26
1
0.5
-
-
-
-
and
41
42
1
0.1
0.19
378
-
-
55
57
2
0.11
-
-
-
-
68
69
1
0.1
0.04
-
-
-
75
76
1
0.12
-
-
-
-
83
84
1
0.1
-
-
-
-
93
94
1
0.29
-
11.2
-
-
TBRC145
20
26
6
0.26
0.02
-
-
-
including
23
24
1
0.77
0.04
-
-
-
37
41
4
0.21
-
-
-
-
40
41
1
0.51
-
-
-
-
93
94
1
0.11
-
-
-
-
TBRC146
10
15
5
0.24
-
-
-
-
including
11
12
1
0.79
-
-
-
-
90
91
1
0.16
-
67.2
-
-
TBRC147
5
18
13
0.24
0.03
-
-
-
including
8
9
1
1.25
0.07
31.8
0.06
-
and
11
12
1
0.97
0.08
11.9
-
-
33
34
1
0.16
0.14
-
-
-
56
57
1
1.02
0.02
-
-
-
79
89
10
0.12
-
-
-
-
79
81
2
0.36
-
-
-
-
95
96
1
0.16
0.05
-
-
-
TBRC148
2
9
7
0.39
0.03
-
-
-
including
3
5
2
0.78
0.04
11.8
-
-
65
66
1
0.11
0.05
-
-
-
7
8
1
0.39
-
-
-
-
47
60
13
0.22
0.02
17
-
-
including
47
48
1
0.69
0.13
-
-
-
and
53
54
1
0.52
0.03
55.1
0.07
-
69
73
4
0.24
0.06
-
-
-
82
83
1
0.11
0.03
-
-
-
88
89
1
0.13
0.1
34.6
0.06
-
104
105
1
0.11
0.5
-
-
1.11
including
including
TBRC149
6
Comment
TBRC150
89
100
11
0.11
0.03
14.7
-
-
including
89
91
2
0.35
0.08
13.6
-
-
TBRC151
11
16
5
0.23
0.05
-
-
-
58
70
12
0.56
0.1
23.8
-
-
58
62
4
1.04
0.2
65
-
-
76
77
1
0.28
0.05
19.3
-
-
TBRC152
9
12
3
0.54
0.05
-
-
-
including
10
11
1
1.28
0.07
-
-
-
25
28
3
0.27
0.05
19.6
-
-
39
46
7
0.42
-
-
-
-
41
42
1
1.67
-
10
-
-
61
62
1
0.11
0.04
-
-
-
67
68
1
0.14
-
-
-
-
70
71
1
0.1
-
-
-
-
72
73
1
0.07
0.91
-
-
-
76
77
1
0.25
0.02
46.9
-
-
82
87
5
0.06
0.28
-
-
-
including
82
83
1
0.1
0.94
-
-
-
TBRC153
20
21
1
0.52
-
-
-
-
64
79
15
0.68
0.04
77.2
0.05
-
including
65
66
1
1.94
0.02
-
-
-
and
72
77
5
1.22
0.08
219
0.13
-
91
102
11
0.13
-
-
-
-
including
99
100
1
0.83
0.02
-
-
-
TBRC154
17
19
2
0.15
-
63.7
-
-
26
31
5
0.15
-
-
-
-
37
49
12
0.15
-
-
-
-
including
37
40
3
0.46
0.02
-
-
-
TBRC155
24
31
7
0.31
-
23.1
-
-
including
24
26
2
0.94
-
41.7
-
-
50
54
4
0.59
0.02
-
-
-
including
51
52
1
1.92
0.02
-
-
-
TBRC156
32
34
2
0.14
-
-
-
-
40
41
1
0.1
-
59.6
-
-
47
48
1
0.24
0.02
10.8
-
-
55
58
3
0.11
-
-
-
-
TBRC157
30
45
15
0.24
0.03
-
-
-
including
38
42
4
0.65
0.05
15.2
-
-
55
68
13
0.16
-
37
-
-
including
56
57
1
1.11
0.03
56.2
-
-
and
64
65
1
0.2
-
350
-
-
including
including
77
94
17
0.12
0.02
-
-
-
including
77
78
1
0.41
0.02
13.1
-
-
and
80
81
1
0.38
0.06
-
-
-
and
85
86
1
0.58
-
-
-
-
and
91
94
3
0.18
0.06
32.4
-
-
7
Tungsten-rich veining
High-grade tin with strong silver
Silver-rich veining
TBRC158
15
24
9
0.24
including
22
23
1
0.73
31
32
1
0.19
40
66
26
0.16
including
46
54
8
including
49
50
and
53
TBRC159
-
-
-
-
-
-
-
0.02
10.9
-
-
-
-
-
-
0.36
-
12.5
-
-
1
1.05
0.02
-
-
-
54
1
1.1
0.03
52.7
-
-
8
28
20
0.41
0.03
-
-
-
including
8
16
8
0.66
0.05
-
-
-
and
25
26
1
2.49
0.14
11
-
-
36
45
9
0.11
0.02
-
-
-
52
61
9
0.33
-
-
-
-
52
55
3
0.84
0.02
11.9
-
-
74
79
5
0.1
-
22.1
-
-
88
101
13
0.2
0.06
58
-
-
including
90
91
1
1.61
0.11
-
-
-
and
99
101
2
-
-
359
-
-
TBRC160
26
27
1
0.27
0.06
-
-
-
32
33
1
0.9
0.02
-
-
-
50
59
9
0.21
0.04
-
-
-
52
53
1
0.82
0.04
-
-
-
90
95
5
0.11
0.03
-
-
0.51
including
including
-
8
Silver-rich veining
JORC CODE, 2012 - TABLE 1
Section 1 Sampling Techniques and Data – TALLEBUNG PROJECT
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling techniques
Explanation
Commentary
•
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry RC Drilling – the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
standard measurement tools appropriate to the minerals under investigation, such as downhole for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
the time of drilling.
gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as
limiting the broad meaning of sampling.
•
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
For RC drilling, assay standards or blanks are inserted at least every 50 samples.
All sample lab received weights show consistency with recovery and interval length.
•
Aspects of the determination of mineralisation that are Material to the Public Report. In cases Each sample was dried, crushed and pulverised as per standard industry practice.
where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a RC Drilling – the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
30 g charge for fire assay’). In other cases, more explanation may be required, such as where
for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
there is coarse gold that has inherent sampling problems. Unusual Commodities or
the time of drilling. Where mineralisation has not been logged, 4m Composites have been made by using
mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information. a spear to Combine equal amounts of samples from each 1m calico.
The primary metal of interest, tin (Sn) and also tungsten (W) were determined by lithium borate fusion
XRF (method ALS – ME-MS85) – considered appropriate for these elements. Multielement assaying was
Completed for 48 elements by 0.25g four-acid digest with ICPMS determination (method ALS – MEMS61)
Reverse circulation (RC) drilling using 110mm rods, 144mm face sampling hammer.
Drilling techniques
•
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, facesampling bit or other type, whether core is oriented and if so, by what method, etc)
Drill sample recovery
•
•
•
Method of recording and assessing core and chip sample recoveries and results assessed.
RC drilling - high capacity RC rig was used to enable dry samples collected. Drill cyclone is cleaned
Measures taken to maximise sample recovery and ensure representative nature of the samples. between rod changes and after each hole to minimise cross-hole contamination.
Whether a relationship exists between sample recovery and grade and whether sample bias may
have occurred due to preferential loss/gain of fine/coarse material
Sample weights are recorded for each sample. Recoveries were generally excellent and consistent,
however, if samples were wet the recoveries were less consistent.
There is no known relationship between sample recovery and grade. Where samples recoveries are less
than 95% there is no relationship observed between grade and sample recovery. Relationships between
sample recovery and grade are not considered significant where recoveries exceeded 95% in fresh rock.
9
Criteria
Logging
•
•
•
Explanation
Commentary
Whether core and chip samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography
The total length and percentage of the relevant intersections logged
Systematic geological and geotechnical logging was undertaken when the holes were originally drilled.
Data collected includes:
•
Nature and extent of lithologies.
•
Relationship between lithologies.
•
Amount and mode of occurrence of ore minerals.
•
Location, extent, and nature of structures such as bedding, cleavage, veins, faults etc.
Structural data (alpha & beta) are recorded for orientated core.
Geotechnical data such as recovery, RQD, fracture frequency, qualitative IRS, microfractures, veinlets and
number of defect sets. For some geotechnical holes the orientation, nature of defects and defect fill are
recorded.
Both qualitative and quantitative data is collected.
RC chips, half core (HQ) & ¾ core (PQ) samples are retained in trays for future reference.
A representative sample of each one metre RC interval is retained in chip trays for future reference.
All chips were geologically logged.
Sub-sampling techniques
and sample preparation
•
•
•
•
•
•
If core, whether cut or sawn and whether quarter, half or all core taken
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry
For all sample types, the nature, quality and appropriateness of the sample preparation
technique
Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples
Measures taken to ensure that the sampling is representative of the in-situ material collected,
including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled
RC drilling - the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
the time of drilling. Where 4m Composites have been made, a spear is used to split equal amounts of
each metre into the 4m Composite.
Samples were dried crushed and pulverised to 90% passing 75 microns. This is considered to
appropriately homogenise the sample to allow subsampling for the various assay techniques.
SKY: Certified Reference Material (CRM) and blanks were inserted at least every 50 samples to assess the
accuracy and reproducibility of the drill core results. The results of the standards were to be within ±10%
variance from known certified result. If greater than 10% variance the standard and up to 10 samples
each side were re-assayed. SGS conducted internal check samples every 20 for multielement assay.
RC drilling - duplicate samples are collected of re-split intervals. Duplicates generally show excellent
repeatability.
Sample sizes are industry standard and considered appropriate
Quality of assay data
and laboratory tests
•
•
•
The nature, quality and appropriateness of the assaying and laboratory procedures used and
Standard assay procedures performed by a reputable assay lab, (ALS), were undertaken. Forty-eight
whether the technique is considered partial or total
elements Ag, As, Cu, Fe, Pb, S, Zn are digested by four-acid digest then analysed by ICPMS (method MEFor geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in
MS61).
determining the analysis including instrument make and model, reading times, calibrations
factors applied and their derivation, etc
Sn and W assays were generated by lithium borate fusion XRF (method ME-MS85) – considered
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
appropriate for these elements.
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision have
been established
No geophysical tools were used in the determination of assay results.
Certified reference material or blanks were inserted at least every 50 samples. Standards are purchased
10
Criteria
Explanation
Commentary
from Certified Reference Material manufacture Companies: Standards were purchased in foil lined
packets of between 60g and 100g. Different reference materials were used to cover high grade, medium
grade, low grade, and trace ranges of elements, with a primary focus on Sn and Cu.
Verification of sampling •
and assaying
•
•
•
Drill data is Compiled and collated and reviewed by senior staff. External consultants do not routinely
The verification of significant intersections by either independent or alternative Company
verify exploration data until resource estimation procedures are deemed necessary. The intersection
personnel.
calculations were viewed by >1 geological personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data storage (physical
Twinned holes have been used by past explorers to validate the results achieved and have confirmed
and electronic) protocols.
these historic results.
Discuss any adjustment to assay data
Drill Hole Data including: meta data, any gear left in the drill hole, lithological, mineral, survey, sampling,
magnetic susceptibility was collected and stored as physical and electronic copies or entered directly into
an excel spread sheet using drop down codes. When Complete the spreadsheet was Combined into a
master excel spreadsheet as the drill hole database.
Assay data was provided by ALS via .csv spreadsheets. The data was validated using the results received
from the known certified reference material. Hard copies of the assay certificates were stored with drill
hole data such as drillers plods, invoices, and hole planning documents.
Assay data is not adjusted.
Location of data points
•
•
•
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
Specification of the grid system used
Quality and adequacy of topographic control
Historic drill hole collars were located using either a licenced surveyor or on a local imperial or metric
grid. Conversion of the local grid co-ordinates has been undertaken by previous exploration Companies.
SKY has used DGPS surveying of drillholes (± 0.1m) to accurately locate them.
All coordinates are based on Map Grid Australia Zone 55E, Geodetic Datum of Australia 1994.
Historic drill hole collars were located using either a licenced surveyor or on a local imperial or metric
grid. SKY has used DGPS surveying of drillholes (± 0.1m) to accurately locate them, or handheld GPS (+/3m). Where handheld GPS has been used, SKY will DGPS them at a later date.
Data spacing and
distribution
•
•
•
Data spacing for reporting of Exploration Results
At this stage, drilling of the MRE area of the project has been drilled to at least approximately 80m x 80m
Data spacing for reporting of Exploration Results Whether the data spacing, and distribution is down to 40m x 40m for inferred and indicated resources respectively. Outside of the MRE are, data
sufficient to establish the degree of geological and grade continuity appropriate for the Mineral spacing is variable as the focus is on geological mapping and identifying new zones of mineralisation.
Resource and Ore Reserve estimation procedure(s) and classifications applied
Whether sample Compositing has been applied
The maiden MRE was estimated to inferred and indicated and increases in resource confidence will
require tighter spaced drilling, such as some of the drilling completed in this program.
Sample Compositing is not applied.
Orientation of data in
relation to geological
structure
•
•
Whether the orientation of sampling achieves unbiased sampling of possible structures and the Drilling was orientated to cross the mineralisation trend at moderate to high angles, perpendicular to
extent to which this is known, considering the deposit type
mineralisation. The use of orientated core allows estimates of the true width and orientation of the
If the relationship between the drilling orientation and the orientation of key mineralised
mineralisation to be made accurately.
structures is considered to have introduced sampling bias, this should be assessed and reported
if material
No sample bias due to drilling orientation is known. The structural controls on mineralisation is
considered well understood and consistent.
11
Criteria
Explanation
Commentary
Sample security
•
The measures taken to ensure sample security
Sample chain of custody has been managed by the employees of Sky Metals who Commissioned the
drilling and transport samples from the drilling rig to assay laboratory.
All samples are bagged in tied numbered calico bags, grouped into larger tied polyweave bags, or placed
in a stillage box and transported to ALS in Orange by SKY personnel. All sample submissions are
documented via ALS tracking system and all assays are reported via email.
Sample pulps are returned to site and stored for an appropriate length of time (minimum 3 years). The
Company has in place protocols to ensure data security.
Audits or reviews
•
The results of any audits or reviews of sampling techniques and data
The Company has external consultants to verify exploration data for the resource estimation process.
Further details for the MREs can be found in SKY ASX Announcement 22 Match 2023 and SKY ASX
Announcement 23 January 2024.
Section 2 Reporting of Exploration Results – TALLEBUNG PROJECT
(Criteria listed in the preceding section also apply to this section)
Criteria
Explanation
Mineral tenement and
land tenure status
Exploration done by
other parties
Commentary
•
Type, reference name/number, location and ownership including agreements or material issues The Tallebung Project is described by NSW Exploration Licence 6699
with third parties such as joint ventures, partnerships, overriding royalties, native title interests, The tenement is 100% owned by Stannum Pty Ltd, a 100% owned subsidiary of Big Sky Metals Pty Ltd
historical sites, wilderness or national park and environmental settings.
and a 100% owned subsidiary of Sky Metals Ltd.
The Tallebung tenement is overlain by Native Title Determination Application No NC12/1 (Federal Court
No NSD 415/12). A determination of extinguished native title was received over a portion of the
Tallebung Tin Field.
An agreement between for the remainder of the tenement where Native Title has not been
extinguished, an agreement has been reached between Stannum and the Native Title Applicant to allow
access to the remainder of the tenement.
•
The security of the tenure held at the time of reporting along with any known impediments to
obtaining a licence to operate in the area
Stannum Pty Ltd have previously Commenced a Right to Negotiate Process (RTN) with the claimant
group with respect to Application No NC12/1 (Federal Court No NSD 415/12). These negotiations have
resulted in a land access agreement to be sign with Stannum Pty Ltd. A determination of extinguished
native title was received over a major portion of the Tallebung Tin Field and Stannum has also signed an
access agreement with the Native Title Applicant for access to