Second Rig Mobilising to Accelerate Drilling at Tallebung
Released
Released
Announcement PDF
SKY METALS LIMITED
+61 2 6360 1587 2 HAWTHORN PLACE, ORANGE NSW 2800 WWW.SKYMETALS.COM.AU ABN 46 098 952 035
ASX: SKY
ASX ANNOUNCEMENT
26 November 2025
Watch a video summary of this announcement & engage with SKY here
SECOND RIG MOBILISING TO ACCELERATE DRILLING
PROGRAM AT TALLEBUNG
• Second drill rig mobilising to join the large-scale drilling program of more than 100 holes
currently advancing at Tallebung.
• Priority drilling to test extensions of the exceptional high-grade silver-tin intercept in
TBRC171 on the south-eastern margin of the deposit:
TBRC171: 3m @ 686.3g/t silver & 0.96% tin from 24m.
• First assay results expected in December, with progressive updates to follow over the
coming months as drilling results continue to be returned.
• Drilling looking to expand the newly discovered high-grade zones and complete in-fill
drilling to support an updated Mineral Resource Estimate (MRE) and improve confidence in
the shallow mineralisation.
• Updated MRE and mining studies scheduled for completion early next year, incorporating
data from more than 300 holes (current MRE based on only 115 holes).
CORPORATE
• $592,000 received from Directors and Management following AGM approval of participation
in the latest placement, reinforcing the continued strong support from the SKY Board.
• Sky Metals remains well-funded to advance bulk metallurgical testwork and environmental
studies in parallel with a multi-rig drilling program, supporting future mining approvals.
SKY Managing Director & CEO Oliver Davies commented: “The mobilisation of a second rig represents another
important step in accelerating our drilling campaign at Tallebung to unlock the full potential of this exceptional tin-
silver-tungsten system. We are looking forward to receiving the first assay results in the coming weeks and
commencing work on an updated Mineral Resource Estimate, targeted for completion in Q1 next year. With strong
Board support and a strengthened funding position, we are also well placed to advance mine development studies
early next year, which will be based on the upgraded MRE.”
2
Sky Metals Limited (ASX: SKY) is pleased to advise that it continues to make excellent progress with the major
new drilling program at its 100%-owned Tallebung Tin Project in central-western New South Wales, with a
second drill rig mobilising to accelerate drilling of over 100 holes planned to deliver resource growth and improved
confidence in the shallow mineralisation. This program marks a key step in advancing the project in parallel with
mine development studies.
TALLEBUNG TIN PROJECT (EL 6699, SKY 100%)
TALLEBUNG RC DRILLING CONTINUES TO INTERSECT SHALLOW, HIGH-GRADE TIN-SILVER ZONES
The new RC drilling program is well advanced with over 20 holes already completed. The first holes are designed
to in-fill existing resources before progressing to test extensions to the exceptional high-grade silver-tin intercept
in TBRC171, located on the south-eastern margin of the deposit (see Figure 2).
Figure 2: Plan showing the location of the latest drill-holes with assays pending and planned drill-holes in the
latest program. Selected previously reported highlight drill intercepts, with results from the successful preceding
program shown in orange. The boundary of the existing Tallebung MRE is also shown over surface geology.
3
This intercept highlights the outstanding potential for high-grade zones within the broader Tallebung system:
TBRC171: 3m @ 686.3g/t Ag & 0.96% Sn from 24m
With this priority work completed, drilling will now move to expand other newly discovered high-grade zones on
the deposit margins and complete in-fill drilling to underpin an updated Mineral Resource Estimate (MRE).
The addition of a second drill rig in the coming weeks will accelerate drilling progress and deliver diamond drill
core for structural and geotechnical data essential for mine design.
First assay results are expected in December, with ongoing updates to follow.
An updated MRE and mining studies remain on track for completion early next year, incorporating data from more
than 300 holes, a significant increase from the 115 holes used for the existing MRE (see SKY ASX Announcement
31July 2025).
Drilling Program Details
• Over 100 drill-holes planned, comprising a mix of Reverse Circulation (RC) and diamond drilling with two
drill rigs soon to be on-site until at least the end of the year and potential for a third drill rig to be added in
the New Year.
• RC drilling will rapidly test shallow extensions and in-fill zones including those highlighted above.
• Diamond drilling will provide structural and geotechnical data to support open-pit mine design and
feasibility studies.
CORPORATE
Additional placement proceeds totalling $592,000 have been received from Directors and Management following
the recent AGM approval, reinforcing strong board support. Combined with existing cash reserves from the recent
$6.1 million capital raise (see SKY ASX Announcement 31July 2025), SKY remains well-funded to advance
metallurgical testwork and environmental studies in parallel with drilling, ensuring that all critical components for
future mining approvals progress together.
This announcement is authorised for release by the Board of Sky Metals Limited.
Investors:
Oliver Davies – Managing Director & CEO
+61 (0) 430 359 547
Media:
Nicholas Read – Read Corporate
+61 (0) 419 929 046
JOIN SKY METALS’ INTERACTIVE INVESTOR HUB
Visit skymetals.com.au to interact with Sky Metals’ announcements and updates
To watch a video summary of this announcement & engage with SKY click here
4
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver
Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee and
director of Sky Metals Ltd and has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves.’ Mr. Davies consents to the inclusion in this report of the matters based on his information in the
form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www.asx.com.au). The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves
and resources, production levels and rates, costs, prices, future performance or potential growth of Sky Metals
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Sky Metals Ltd.
Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may
differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been,
and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining,
and Metallurgy and Australian Institute of Geoscientists.
About the Tallebung Tin Project (100% SKY)
Tallebung stands as an open-pit, technology enabled, near-term tin development project. Tallebung is uniquely
placed to provide secure tin supply, to feed irreplaceable and rapidly expanding tin demand, essential in semi-
conductors, electronics and solar PV technologies.
The Tallebung Tin Project is located at the site of large-scale historical tin mining in central Western NSW
where tin was first discovered in the 1890s. SKY is progressively defining a large-scale hardrock tin resource
with recent higher-grade tin zones discovered on the margins of the known deposit and exceptional
metallurgical performance demonstrated across the entire known deposit.
The shallow, open-pit tin veins combined with the ideal nature of the tin, hosted as large, discrete grains of
simple tin-oxide (cassiterite minerals), all ideally lends itself to low-cost tin production advantages, including
exceptional X-ray based ore sorting performance, demonstrated to upgrade the tin up to 44x, prior to low-cost
gravity separation to produce a saleable tin concentrate.
Share your feedback
Discover