Doradilla Project - Large Expansion of REE Mineralisation
Released
Released
Announcement PDF
ASX: SKY
ASX ANNOUNCEMENT
4 July 2023
DORADILLA PROJECT
LARGE EXPANSION OF REE MINERALISATION
Assay results for the aircore drilling program of 63 holes for total of 3,062m have been
received, successfully expanding the rare earth element (REE) mineralisation at the
Doradilla Project.
Assay results have extended the DMK Line strike by 4km, with further REE
mineralisation discovered at Midway and over the Midway Granite. Results include:
MWAC031: 24m @ 3,871ppm (0.39%) TREO from 44m, including;
8m @ 10,191ppm (1.02%) TREO from 48m.
MWAC018: 20m @ 3,463ppm (0.35%) TREO from 69m, including;
7m @ 5,682ppm (0.57%) TREO from 73m.
MWAC052: 14m @ 1,983ppm (0.20%) TREO & 0.45% Tin from 17m, including;
3m @ 6,854ppm (0.69%) TREO & 0.26% Tin from 17m.
High concentrations of valuable REE are seen throughout and averages over 20%
MREO (Nr+Pr+Tb+Dy), highlighted in MWAC031 intercept of 8m @ 10,191ppm (1.02%)
TREO from 48m which averages over 34% MREO.
Testwork is ongoing to develop extraction pathways for the high value REE and Tin
mineralisation, samples from this program will be sent to ANSTO for this testwork.
SKY CEO Oliver Davies commented: “This program has shown a significant expansion of the high value REE
mineralisation with all results contained in the +50m deep clays from surface over the broad 16km strike at
Doradilla. Crucially, these results confirm the very valuable mix of REE present at Doradilla, with an average of
+20% Nd+Pr+Tb+Dy. The REE mineralisation has now been extended over the Midway Granite, to the north of the
DMK Line and further mineralisation has been discovered along the previously untested 4km strike between
Doradilla and Midway. This demonstrates the extraordinary size and continuity of the REE and tin mineralisation
and the potential for the ongoing growth of the already expansive Doradilla Project. SKY will continue working on
pathways to extract the high value REE and tin mineralisation from this large potential source of REE and tin.”
The Board of Sky Metals Limited (‘SKY’ or ‘The Company’) is pleased to provide an update on the results of the
aircore drilling to expand the high value REE and Tin-polymetallic mineralisation at the Doradilla Project.
DORADILLA PROJECT (EL 6258, SKY 100%)
RARE EARTH ELEMENT MINERALISATION – AIRCORE DRILLING PROGRAM
Results for the aircore drilling program completed at the Doradilla Project in April this year have been received
for all 63 holes for a total of 3,062m. The program has successfully expanded the strike of the DMK Line by 4km
between the Doradilla and Midway Deposits and discovered REE mineralisation over the Midway Granite.
SKY METALS LIMITED
+61 2 6360 1587
2 HAWTHORN PLACE, ORANGE NSW 2800
WWW.SKYMETALS.COM.AU
ABN 46 098 952 035
Figure 1: Doradilla Project – Map shows the large strike extension of the previously undrilled and untested strike between Midway and Doradilla on the DMK Line
and the previous strike extent with recent aircore drilling intercepts overlaid on the mapped and interpreted geology.
2
The program was focussed on testing the Midway Deposit and along strike extension of the DMK Line for REE
and Tin mineralisation as Midway has the highest grade REE and tin identified along the DMK Line to date. This
program was also designed to test the outcropping Midway Granite for potential REE mineralisation.
The program commenced with drilling two traverses on a southeast-northwest orientation commencing from the
DMK line and progress across the surface outcrop of the Midway Granite. Another traverse was then completed
southwest-northeast over the Midway Granite outcrop to test the volume of the weathered Midway Granite for
potential mineralisation.
Results from these traverses intercepted exceptionally high grade REE mineralisation in the DMK Line through
the Midway Deposit (Figures 1 and 2 and Table 2), results included:
MWAC031: 24m @ 3,871ppm (0.39%) TREO from 44m, including;
8m @ 10,191ppm (1.02%) TREO from 48m.
MWAC018: 20m @ 3,463ppm (0.35%) TREO from 69m, including;
7m @ 5,682ppm (0.57%) TREO from 73m.
Figure 2: Doradilla Project – Cross-section from MWAC029 to MWAC031 showing the DMK line Skarn above the
Midway Granite with the Midway Granite coming to surface and outcropping to the northwest.
3
Drilling then continued along the Midway Deposit with multiple traverses of angled aircore holes to confirm the
historic drilling results throughout the Midway Deposit completed in the 1970s and 1980s. These results also
confirmed the re-assaying completed by SKY of the historic drill pulp samples. Numerous high-grade and broad
zones of REE and Tin mineralisation were confirmed throughout the Midway Deposit (Figures 1 and 3 and Table 2),
results included:
MWAC052: 41m @ 822pm (0.08%) TREO & 0.33% Tin from 4m, including;
14m @ 1,983ppm (0.20%) TREO & 0.45% Tin from 17m, including;
3m @ 6,854ppm (0.69%) TREO & 0.26% Tin from 17m.
1m @ 10,114ppm (1.01%) TREO & 0.08% Tin from 17m.
MWAC044: 32m @ 1,054ppm (0.11%) TREO & 0.41% Tin from 32m, including;
15m @ 1,081ppm (0.11%) TREO & 0.75% Tin from 12m, and;
6m @ 2,266ppm (0.23%) TREO & 0.51% Tin from 23m.
MWAC053: 15m @ 2,673ppm (0.27%) TREO, 0.08% Tin & 0.03% Tungsten from 15m.
Figure 3: Doradilla Project – Cross-section from MWAC050 to MWAC052 showing the multiple skarns of the
DMK line associated with REE and tin mineralisation above the Midway Granite which underlies the area.
Finally, a traverse of three (3) angled aircore holes were drilled for a 1.5km along strike step out southwest from
Midway and 2.5km along strike to the northeast from Doradilla, testing the 4km of untested strike of the DMK Line
between the Midway and Doradilla Deposits. These holes successfully intercepted the DMK Line and REE and tin
4
mineralisation. This extends the strike of the DMK line over an additional 4km between the previous untested strike
of the DMK Line Doradilla and Midway (Figure 1 and Table 2), results included:
MWAC061: 29m @ 593ppm (0.06%) TREO from 32m.
MWAC062: 13m @ 620ppm (0.06%) TREO from 44m.
MWAC063: 25m @ 0.18% Tin & 0.71% Zn from 40m, including;
9m @ 0.41% Tin & 0.77% Zn from 56m, including;
3m @ 1.08% Tin from 62m.
This strike extension between the Midway and Doradilla Deposits further demonstrates the remarkable
opportunity to continue to expand the DMK Line’s high value REE and tin mineralisation at Doradilla.
This aircore program has successfully:
– Discovered complimentary REE mineralisation over the Midway Granite,
– Confirmed and expanded the REE and tin mineralisation at the Midway Deposit and,
– Substantially extended the REE and tin mineralisation of the DMK Line, showing the DMK Line is
continuous over an additional 4km of previously untested strike between the Midway and Doradilla
Deposits.
This program highlights exceptional opportunity to continue to grow this large and high value potential source of
REE and tin-polymetallic mineralisation.
METALLUGICAL TESTWORK PROGRAM
Samples from this aircore drilling program will be promptly sent to ANSTO to test extraction of the REE via AS
(ammonium sulphate) leaching or for investigation with other extraction methods if required. However, the Midway
Granite samples and other areas of the Midway Deposit, possibly represents a discrete type of REE mineralisation
and, therefore, different chemistry from the previously tested mineralisation. Therefore, it is possible that this
mineralisation will be more amenable REE extraction via AS leaching than previous samples tested.
More broadly, SKY is continuing to progress the preliminary work on the nature and potential metallurgical
pathways for the extraction of the high value REE and tin mineralisation at Doradilla. This has commenced with
the REE mineralisation characterisation work and review of past metallurgical work currently being completed at
ANSTO and UNSW to begin investigating potential metallurgical pathways.
A first pass trial of ammonium sulphate (AS) leaching at a solution pH of 4 and pH of 3 by ANSTO for samples from
the DMK Line has not shown promise for economic extraction of REE via this method. However, this in one of many
possible alternatives for economic extraction can be investigated. It is likely that a number of other extraction
pathways will be available given the strong grades and the high value of mineralisation present at the project.
SKY will continue to work with ANSTO, along with other experts, to further test a broad range of methods available
to extract the REE, tin and polymetallic mineralisation on the DMK Line and mineralisation more widely discovered
at Doradilla.
5
Table 1: Doradilla Project – Drillhole Collar Details.
Hole ID
Easting
(MGA)
Northing
(MGA)
RL (m)
DIP
Azimuth
(MGA)
Total Depth
(m)
MWAC001
MWAC002
MWAC003
MWAC004
MWAC005
MWAC006
MWAC007
MWAC008
MWAC009
MWAC010
MWAC011
MWAC012
MWAC013
MWAC014
MWAC015
MWAC016
MWAC017
MWAC018
MWAC019
MWAC020
MWAC021
MWAC022
MWAC023
MWAC024
MWAC025
MWAC026
MWAC027
MWAC028
MWAC029
MWAC030
MWAC031
MWAC032
MWAC033
MWAC034
MWAC035
MWAC036
MWAC037
MWAC038
MWAC039
MWAC040
MWAC041
MWAC042
MWAC043
MWAC044
MWAC045
MWAC046
MWAC047
MWAC048
MWAC049
MWAC050
MWAC051
MWAC052
MWAC053
MWAC054
MWAC055
MWAC056
438757
438711
438636
438579
438521
438456
438467
438473
438472
438481
438510
438535
438538
438427
438401
438862
438882
438910
438935
438955
438299
438262
438209
438160
438108
438279
438404
438429
438501
438573
438617
438350
438371
438392
438412
438439
438289
438224
438164
438116
440207
440232
440261
441011
441030
441049
441088
440999
441162
441210
441229
441257
441341
441357
441396
441417
6645730
6645781
6645830
6645880
6645928
6645947
6646022
6646094
6646166
6646231
6646312
6646383
6646464
6645870
6645794
6645729
6645699
6645664
6645627
6645598
6645619
6645549
6645472
6645412
6645347
6645574
6645686
6645639
6645589
6645528
6645469
6645253
6645214
6645195
6645158
6645131
6645791
6645869
6645916
6645957
6646752
6646727
6646698
6647248
6647228
6647208
6647259
6647264
6647491
6647441
6647427
6647385
6647436
6647526
6647478
6647462
180
180
180.1
180.1
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
180
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-60
-60
-60
-60
-60
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-60
-60
-60
-60
-60
-60
-90
-90
-90
-90
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
-60
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
325
326
326
326
326
0
0
0
0
0
0
0
0
0
0
325
326
326
325
325
325
10
10
10
10
325
325
325
325
325
325
325
325
325
325
325
325
325
325
325
325
78
76
77
50
68
62
42
60
59
63
39
78
66
22
2
57
44
89
66
67
2
36
36
33
38
9
20
22
60
60
87
36
39
71
78
53
1
55
3
28
53
33
62
36
62
78
61
20
77
20
20
45
34
40
13
45
6
Comment
Abandoned
Abandoned
Easting
(MGA)
441455
441500
441551
439647
437165
437129
437106
Hole ID
MWAC057
MWAC058
MWAC059
MWAC060
MWAC061
MWAC062
MWAC063
Northing
(MGA)
6647415
6647353
6647311
6646266
6644101
6644135
6644150
RL (m)
DIP
180
180
180
180
180
180
180
-60
-60
-60
-60
-60
-60
-60
Azimuth
(MGA)
325
325
325
325
325
325
325
Total Depth
(m)
78
48
45
49
80
66
65
Comment
Table 2: Doradilla Project – Significant Drillhole Intercepts.
Hole ID
From
To
Interval
TREO
MREO
Sn
W
Cu
Zn
In
Ag
(m)
(m)
(m)
ppm
%
%
%
%
%
g/t
g/t
MWAC001
36
56
20
593
23
-
-
-
-
-
-
MWAC002
20
32
12
1016
20
-
-
-
-
-
-
MWAC004
28
40
12
753
21
-
-
-
-
-
-
4m composite samples
MWAC005
20
36
16
712
24
-
-
-
-
-
-
4m composite samples
MWAC006
16
28
12
526
24
-
-
-
-
-
-
4m composite samples
MWAC007
24
40
16
602
24
-
-
-
-
-
-
4m composite samples
MWAC008
36
44
8
634
26
-
-
-
-
-
-
4m composite samples
MWAC009
36
48
12
519
22
-
-
-
-
-
-
4m composite samples
MWAC011
12
24
12
494
26
-
-
-
-
-
-
4m composite samples
MWAC012
58
61
3
493
23
-
-
-
-
-
-
MWAC013
32
40
8
541
22
-
-
-
-
-
-
MWAC014
8
22
14
691
21
-
-
-
-
-
-
MWAC016
33
46
13
2142
20
0.04
-
-
-
-
-
including
34
38
4
3998
20
0.03
-
0.07
0.2
-
-
43
45
2
625
20
0.15
-
-
-
-
-
MWAC017
4
16
12
556
18
0.21
-
-
-
12.6
-
4m composite samples
including
12
16
4
1038
5
0.33
-
-
-
25.6
-
4m composite samples
31
34
3
831
19
-
-
-
-
-
-
MWAC018
16
89
73
1355
15
0.16
-
-
-
-
-
4m composite and 1m samples
including
16
36
20
640
21
0.33
-
-
-
24.5
-
4m composite samples
69
89
20
3463
26
0.09
-
-
0.4
-
-
including
73
80
7
5682
27
0.04
-
-
0.52
-
-
including
84
89
5
1379
24
0.18
-
-
-
10.2
-
MWAC019
36
60
24
563
25
-
-
-
0.24
-
-
4m composite and 1m samples
MWAC020
40
44
4
495
30
-
-
-
-
-
-
MWAC021
1
2
1
416
15
-
-
-
-
-
-
MWAC022
29
36
7
1016
22
-
-
-
-
-
-
MWAC023
20
24
4
516
19
-
-
-
-
-
-
4m composite samples
EOH at 2m, drilled into shallow
hard granite
EOH at 36m, drilled into flank
of granite
4m composite samples
MWAC024
25
28
3
469
16
-
-
-
-
-
-
MWAC025
20
28
8
524
24
-
-
-
-
-
-
MWAC026
6
7
1
616
14
-
-
-
-
-
-
MWAC027
4
5
1
465
17
-
-
-
-
-
-
7
Comment
Open to EOH, 4m composite
samples
4m composite samples
4m composite samples
4m composite samples & 2m
composite
4m composite samples
Hole ID
From
To
Interval
TREO
MREO
Sn
W
Cu
Zn
In
Ag
Comment
(m)
(m)
(m)
ppm
%
%
%
%
%
g/t
g/t
MWAC028
12
17
5
802
22
-
-
-
-
-
-
MWAC029
28
40
12
559
21
-
-
-
-
-
-
MWAC030
41
42
1
878
24
-
-
0.07
-
-
-
MWAC031
44
68
24
3871
30
-
-
-
-
-
-
4m composite samples
including
48
56
8
10191
34
-
-
-
-
-
-
4m composite samples
MWAC032
12
16
4
529
40
-
-
-
-
-
-
4m composite samples
MWAC034
44
68
24
629
20
0.13
-
0.04
-
-
-
4m composite samples
MWAC035
56
72
16
1325
22
0.1
-
-
-
-
-
4m composite samples
including
56
64
8
2143
29
0.1
-
-
-
-
-
4m composite samples
MWAC038
24
40
16
705
20
-
-
-
-
-
-
MWAC041
36
43
7
744
24
-
-
-
-
-
-
MWAC042
16
27
11
1976
26
-
-
-
0.26
-
-
MWAC043
20
32
12
1189
28
-
-
-
-
-
-
45
52
7
2077
24
-
-
-
0.4
-
-
including
46
48
2
4557
28
0.17
-
-
0.23
-
-
MWAC044
4
36
32
1054
22
0.41
-
-
0.31
24.6
-
including
12
27
15
1081
23
0.75
-
-
0.38
43.6
-
including
23
29
6
2266
22
0.51
-
-
0.66
32.3
-
MWAC045
28
54
26
673
20
0.37
-
-
-
24.6
-
including
48
54
6
1729
24
0.09
-
0.06
0.38
-
-
MWAC046
48
64
16
652
28
-
-
-
-
-
-
74
78
4
-
-
0.19
-
-
-
20.6
-
MWAC047
16
61
45
560
22
0.58
-
-
-
20.9
-
including
36
61
25
563
20
1.03
-
0.08
0.2
37.4
-
including
52
59
7
947
23
0.67
-
0.08
0.29
29.2
-
MWAC048
16
20
4
1587
32
-
-
-
-
-
-
MWAC049
12
32
20
653
25
-
-
-
-
-
-
4m composite samples
4m composite and 1m samples
4m composite and 1m samples
4m composite samples
4m composite and 1m samples
4m composite samples
MWAC050
0
20
20
1347
24
-
-
-
-
-
-
MWAC051
12
20
8
1466
27
-
-
-
-
-
-
MWAC052
4
45
41
822
23
0.33
-
-
-
-
-
including
17
31
14
1983
25
0.45
-
-
0.28
19.8
-
including
17
20
3
6854
25
0.26
-
-
0.27
11.3
-
including
17
18
1
10114
29
0.08
-
-
0.33
-
-
MWAC053
19
34
15
2673
19
0.08
0.03
-
-
-
-
MWAC054
20
37
17
694
23
-
-
-
-
-
-
MWAC056
16
20
4
534
18
-
-
-
-
-
-
4m composite sample
MWAC057
28
32
4
610
23
-
-
-
-
-
-
4m composite sample
MWAC058
15
21
6
525
25
-
-
-
-
-
-
27
42
15
480
20
-
-
-
-
-
-
MWAC059
21
41
20
956
20
-
-
-
-
-
-
MWAC060
20
37
17
1784
22
0.07
-
-
0.35
-
-
4m composite and 1m samples
34
45
11
643
16
0.1
-
-
0.19
-
-
Tin intercept
MWAC061
32
61
29
593
23
-
-
-
-
-
-
MWAC062
44
57
13
620
24
-
-
-
0.35
-
-
8
Hole ID
From
To
Interval
TREO
MREO
Sn
W
Cu
Zn
In
Ag
(m)
(m)
(m)
ppm
%
%
%
%
%
g/t
g/t
MWAC063
40
65
25
-
-
0.18
-
-
0.71
-
-
including
56
65
9
-
-
0.41
-
-
0.77
-
-
including
62
65
3
-
-
1.08
-
-
0.22
-
-
9
Comment
4m composite and 1m samples
This report has been approved for release by the Board of Directors.
ABOUT SKY (ASX: SKY)
SKY is an ASX listed public company focused on the exploration and development of high value mineral resources in Australia.
SKY’s project portfolio offers exposure to the tin, gold, and copper markets in the world class mining jurisdiction of NSW.
TIN PROJECTS
TALLEBUNG PROJECT (EL6699, 100% SKY)
The Tallebung Project is located ~70km north-west of Condobolin in central NSW. The project encompasses the historic
Tallebung Tin Mining Field at the northern extent of the Wagga Tin Belt within the central Lachlan Orogen where SKY has
now defined a maiden MRE of 10.2Mt @ 0.18% Tin*. SKY plans to advance the Tallebung by increasing the resource to the
16-21Mt* Exploration Target and progress development for future mining (*SKY ASX Announcement 22 March 2023).
DORADILLA PROJECT (EL6258, 100% SKY)
The Doradilla Project is located ~ 30km south of Bourke in north-western NSW and is a large and strategic REE and tin
project with excellent potential for associated polymetallic mineralisation (tungsten, copper, bismuth, indium, nickel, cobalt).
NARRIAH PROJECT (EL9524, 100% SKY)
The Narriah Project is located ~70km west of West Wyalong in western NSW and represents a large tin project with
multiple historic workings prospective for tin, tungsten and lithium mineralisation with limited drill testing completed to date.
NEW ENGLAND PROJECT (EL9200 & 9210, 100% SKY)
Two exploration licences in the New England Orogen covering areas of significant historical tin production.
COPPER GOLD PROJECTS
IRON DUKE (EL6064, BALMAIN; EL9191 100% SKY)
The Iron Duke project is located ~10km southeast of Tottenham in central NSW and covers
at least 4 significant historic copper-gold
mines. High grade copper-gold mineralisation
intersected by previous explorers (e.g. 13m @
1.56% Cu & 4.48g/t Au).
GALWADGERE (EL6320, 100% SKY)
The Galwadgere project is located ~15km
south-east of Wellington in central NSW. An
open MRE of 3.6Mt @ 0.78% Cu and 0.28g/t Au
defined at Galwadgere with numerous targets
with limited drilling testing adjacent to the MRE.
GOLD PROJECTS
CULLARIN / KANGIARA projects (EL7954;
EL8400 & EL8573, DVP farm-in)
The Cullarin Project contains equivalent host
stratigraphy to the McPhillamys deposit with a
similar geochemical, geophysical & alteration
signature. ‘McPhillamys-style’ gold results
from previous drilling at the Cullarin Project.
SKY’s maiden drill program was successful,
including HUD002 which returned 93m @ 4.2 g/t
Au from 56m.
CALEDONIAN / TIRRANA PROJECTS
(EL8920, EL9048, EL9120 100% SKY)
Highlight, ‘McPhillamys-style’ gold results
from previous exploration include 36m @ 1.2
g/t Au from 0m to EOH in drillhole LM2 and 81m
@ 0.87g/t Au in a costean on EL8920 at the
Caledonian Project.
Figure 4: SKY Tenement Location Map
10
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Rimas
Kairaitis, who is a Member of the Australasian Institute of Mining and Metallurgy. Rimas Kairaitis is a Director of
Sky Metals Ltd and has sufficient experience which is relevant to the style of mineralisation and type of deposit
under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves’.
Mr Kairaitis consents to the inclusion in this report of the matters based on his information in the form and context
in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www. asx.com.au). The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves
and resources, production levels and rates, costs, prices, future performance or potential growth of Sky Metals
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Sky Metals Ltd.
Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may
differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been,
and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining,
and Metallurgy and Australian Institute of Geoscientists.
11
JORC CODE, 2012 - TABLE 1
Section 1 Sampling Techniques and Data – DORADILLA PROJECT
(Criteria in this section apply to all succeeding sections)
Criteria
Sampling techniques
Explanation
Commentary
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised industry All pulps, AC chips and drill cores were submitted to ALS Orange for preparation and assaying. Nominal
standard measurement tools appropriate to the minerals under investigation, such as downhole sample intervals are 1m and4m composite samples were also made of samples which did not have
gamma sondes, or handheld XRF instruments, etc). These examples should not be taken as
favourable geology or pXRF readings from the 1m samples taken from the drill rig.
limiting the broad meaning of sampling.
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
Aspects of the determination of mineralisation that are Material to the Public Report. In cases Each sample was dried, crushed and pulverised as per standard industry practice.
where ‘industry standard’ work has been done this would be relatively simple (e.g. ‘reverse
circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised to produce a AC Drilling – the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
30 g charge for fire assay’). In other cases, more explanation may be required, such as where
for future use if required. 1m intervals are split using a cone splitter on the rig into a separate calico at
there is coarse gold that has inherent sampling problems. Unusual commodities or
the time of drilling 4m composite samples were also made of samples which did not have favourable
mineralisation types (e.g. submarine nodules) may warrant disclosure of detailed information. geology or pXRF readings from the 1m samples taken from the drill rig.
For AC, assay standards or blanks are inserted at least every 50 samples. All sample lab received weights
show consistency with core recovery and interval length.
Pulps were also pulverised to ensure the sample is homogenised.
REE (principally: La, Ce, Nd, Pr, Sm, Eu, Gd, Tb, Dy, Ho, Er, Tm, Lu, Yb Y) are analysed at ALS via MEMS81h by lithium meta-borate fusion and ICP-MS. Overlimit samples are analysed via ME-XRF30 fusion.
Forty-eight elements including Ag, As, Cu, Fe, In, Pb, S, Zn are digested by four-acid digest then analysed
by ICPMS (method ME-MS61).
Drilling techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka,
Aircore (AC) drilling using 76.2mm rods was completed with aircore bit capable of drilling through
sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails, face- weathered rock until bit refusal at fresh rock or other material too hard for the bit such as quartz
sampling bit or other type, whether core is oriented and if so, by what method, etc)
veining.
Drill sample recovery
Method of recording and assessing core and chip sample recoveries and results assessed
Measures taken to maximise sample recovery and ensure representative nature of the samples Drill cyclone and sample buckets are cleaned between rod changes and after each hole to minimise
cross-hole contamination and all sampling instruments are cleaned thoroughly to minimise any
possibility of contamination. There is no known relationship between sample recovery and grade. Where
samples recoveries are less than 95% there is no relationship observed between grade and sample
recovery. Relationships between sample recovery and grade are not considered significant where
recoveries exceeded 95% in fresh rock.
Whether a relationship exists between sample recovery and grade and whether sample bias may There is no known relationship between sample recovery and grade. Where no sample has been
have occurred due to preferential loss/gain of fine/coarse material
recovered within the intercepts, intercepts have been calculate assuming 0ppm TREO grade for the
interval.
12
Sample quality is assessed by the sampler by visual approximation of sample recovery and if the sample
is dry, damp or wet.
Criteria
Logging
Sub-sampling techniques
and sample preparation
Quality of assay data
and laboratory tests
Explanation
Commentary
Whether core and chip samples have been geologically and geotechnically logged to a level of
detail to support appropriate Mineral Resource estimation, mining studies and metallurgical
studies
Systematic geological and geotechnical logging was undertaken by SKY when the holes were originally
drilled. Data collected includes:
Nature and extent of lithologies.
Relationship between lithologies.
Amount and mode of occurrence of ore minerals.
Location, extent, and nature of structures such as bedding, cleavage, veins, faults etc.
Structural data (alpha & beta) are recorded for orientated core.
Geotechnical data such as recovery, RQD, fracture frequency, qualitative IRS, microfractures,
veinlets and number of defect sets. For some geotechnical holes the orientation, nature of
defects and defect fill are recorded.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
photography
Both qualitative and quantitative data is collected.
AC chips are retained in trays for future reference
The total length and percentage of the relevant intersections logged
N/A
If core, whether cut or sawn and whether quarter, half or all core taken
N/A
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry
AC drilling - the total sample (~20-30kg) is delivered via cyclone into a large plastic bag which is retained
for future use if required. 1m intervals are split using a riffle splitter on the rig into a separate calico at
the time of drilling. 4m composite samples were also made of samples which did not have favourable
geology or pXRF readings from the 1m samples taken from the drill rig and composited into calico bags.
For all sample types, the nature, quality and appropriateness of the sample preparation
technique
Samples were dried crushed and pulverised to 85% passing 75 microns. This is considered to appropriate
homogenise the sample to allow subsampling for the various assay techniques.
Quality control procedures adopted for all sub-sampling stages to maximise representivity of
samples
Certified Reference Material (CRM) and blanks were inserted at least every 30-50 samples to assess the
accuracy and reproducibility of the results. The results of the standards were to be within ±10% variance
from known certified result. If greater than 10% variance the standard and up to 10 samples each side
were re-assayed. ALS conducted internal check samples every 20 for multielement assay.
Measures taken to ensure that the sampling is representative of the in-situ material collected,
including for instance results for field duplicate/second-half sampling.
Field duplicates were taken for AC samples with spear sampling every 50 samples, previously assayed
samples were also reassayed to compare with recent assaying. Duplicates performed well. The sample
was crushed and pulverised to 90% passing 75 microns. This was considered to appropriately
homogenise the sample.
Whether sample sizes are appropriate to the grain size of the material being sampled
Sample sizes are industry standard and considered appropriate
The nature, quality and appropriateness of the assaying and laboratory procedures used and
whether the technique is considered partial or total
Standard assay procedures performed by a reputable assay lab, (ALS Group), were undertaken. REE are
analysed at ALS via ME-MS81h by lithium meta-borate fusion and ICP-MS. Ov
Share your feedback
Discover