DEVELOPING LARGE SCALE
TIN DEPOSITS IN NSW –
TO FEED GLOBAL
ELECTRIFICATION
MAY 2023
ASX: SKY
DISCLAI ME R - IMPORTANT INFORMATI ON
Disclaimer
Forward-looking information is subject to known and unknown risks, uncertainties and other factors that may cause actual results to be materially different from those expressed or implied by such forward looking information, including risks
associated with investments in private and publicly listed companies such as the Company; risks associated with general economic conditions; the risk that further funding may be required but unavailable for the ongoing development of the
Company’s projects or future acquisitions; changes in government regulations, policies or legislation; unforeseen expenses; fluctuations in commodity prices; fluctuation in exchange rates; litigation risk; restrictions on the repatriation of earnings
by the Company’s subsidiaries; the inherent risks and dangers of mining exploration and operations in general; risk of continued negative operating cashflow; the possibility that required permits may not be obtained; environmental risks;
uncertainty in the estimation of mineral resources and mineral reserves; general risks associated with the feasibility and development of each of the Company’s projects; foreign investment risks in Australia; changes in laws or regulations; future
actions by government; breach of any of the contracts through which the Company holds property rights; defects in or challenges to the Company’s property interests; uninsured hazards; disruptions to the Company’s supplies or service providers;
reliance on key personnel and retention of key employees.
Forward-looking information is based on the reasonable assumptions, estimates, analysis and opinions of management of the Company made in light of their experience and their perception of trends, current conditions and expected
developments, as well as other factors that management believes to be relevant and reasonable in the circumstances at the date that such statements are made, but which may prove to be incorrect. The Company believes that the assumptions
and expectations reflected in such forward-looking information are reasonable.
Assumptions have been made regarding, among other things: the Company’s ability to carry on its future exploration, development and production activities, the timely receipt of required approvals, the price of gold, copper and base metals, the
ability of the Company to operate in a safe, efficient and effective manner and the ability of the Company to obtain financing as and when required and on reasonable terms. Readers are cautioned that the foregoing list is not exhaustive of all
factors and assumptions which may have been used. Although the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking information, there may be other
factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such
information. Accordingly, readers should not place undue reliance on forward-looking information. The Company does not undertake to update any forward-looking information, except in accordance with applicable securities laws.
No Liability/Summary Information
The Company has prepared the Presentation Materials based on information available to it at the time of preparation. No representation or warranty, express or implied, is made as to the fairness, accuracy or completeness of the information,
opinions and conclusions contained in the Presentation Materials. To the maximum extent permitted by law, the Company, its related bodies corporate (as that term is defined in the Corporations Act 2001 (Commonwealth of Australia)) and the
officers, directors, employees, advisers and agents of those entities do not accept any responsibility or liability including, without limitation, any liability arising from fault or negligence on the part of any person, for any loss arising from the use of
the Presentation Materials or its contents or otherwise arising in connection with it. Post 1989, exploration results detailed in this presentation have previously been reported to the ASX or in the independent geologist report contained in the
Prospectus lodged on 18 April 2019. References to metal endowments are current to January 2017. Endowment = current resource plus production. Coordinate system on maps is MGA94 Zone55 unless otherwise stated.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee of Sky Metals Ltd and has
sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr. Davies consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
The information in this report that relates to the Mineral Resource Estimate was prepared by Luke Burlet, who is a Member and Chartered Professional (Geology) of the Australasian Institute of Geoscientists. Luke Burlet is a Director of H & S
Consultants and has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2012 Edition of the
2
‘Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves.’ Mr Burlet consents to the inclusion in this report of the matters based on his information in the form and context in which it appears.
ASX: SKY
SKY’S T E AM
EXPERIENCED AND PROVEN MANAGEMENT
NORMAN SECKOLD | Chairman
RICHARD HILL | Non-Executive Director
CAPITAL STRUCTURE
30+ years in the full-time management of natural resource
companies. Past Chairman and Director of listed companies
including Bolnisi Gold NL, Timberline Minerals Inc.,
Perseverance Corporation Ltd, Valdora Minerals NL,
Palmarejo Silver, Kings Minerals NL, Mogul Mining NL and
Gold Corp. Currently Chairman of Santana Minerals Ltd and
Alpha HPA Ltd and Deputy Chairman of Nickel Industries
Ltd.
25+ years experience in the mineral resources sector as a
geologist and solicitor. Mr. Hill has a successful track record
of guiding ASX listed mining companies from the exploration and
discovery phase through to development in a range of
commodities. These have included past roles as founding Director
for Aurelia Metals Ltd, Strandline Resources Ltd and as Chairman
of Genesis Minerals Ltd as well as current Chairman of New
World Resources.
Shares on issue
Options & Performance Rights
Share price (close 10 May 2023)
Market capitalisation
Cash (31 Mar 2023)
Debt
RIMAS KAIRAITIS | Non-Executive Director
OLIVER DAVIES | CEO
25+ years experience in minerals exploration and resource
development in gold, base metals and industrial minerals.
In his most recent role, Mr. Kairaitis was founding Managing
Director and CEO of Aurelia Metals (ASX: AMI), which he
steered from a junior exploration company to a profitable NSW
based gold and base metals producer. Mr. Kairaitis is also the
Managing Director of Alpha HPA Limited.
Geologist with SKY since listing in 2019. Previously in exploration
and operational roles with Evolution Mining and Alkane
Resources in NSW and Qld. Mr. Davies has worked closely on
several successful NSW exploration projects including Evolution
Mining’s significant expansion of the Lake Cowal gold resource
and Alkane’s exploration success at Tomingley and Boda.
376.8M
39.4M
~$0.05
~$18.8M
~$1.3M
Nil
BOARD AND MANAGEMENT
EXPERT GUIDANCE | SKY’s Consultants
Norm Seckold
Richard Hill
Rimas Kairaitis
Richard Willson
Oliver Davies
Chairman
Non-Executive Director
Non-Executive Director
Company Secretary
Chief Executive Officer
SHAREHOLDERS
Aurelia Metals
Board and Management
Top 20 holders
6%
10%
50.0%
Tallebung Metallurgy – Gunn Metallurgy, TOMRA Ore Sorting Solutions and ALS Burnie engaged to conduct metallurgical testwork.
Tallebung Resource Estimation – H&S Consultants modelled and estimated the maiden Inferred MRE and Exploration Target and advising on upcoming drilling.
Doradilla Tin and REE Metallurgy – ANSTO and UNSW conducting testwork utilising their expertise in hydrometallurgical processes and REE deposits.
3
ASX: SKY
TIN MARKET
Visible Global Tin Stockpiles
TIN: THE FORGOTTEN ELECTRIFICATION METAL
– GLOBAL SUPPLY CONSTRAINTS
Inelastic tin price driven by irreplaceable demand in
electronics sector and global electrification.
Record low stockpiles – US strategic stockpile
depleted, Chinese stockpiling is ongoing, currently less
than 2-3 days tin supply stock on LME.
Source: LME – 25 March 2023
Global Tin Supply by Country (tpa)
Myanmar recently announced suspending tin mining –
4th largest supplier producing 10% of world tin supply.
+30 year under investment in tin supply, metal shortages
looking inevitable, growing tin price.
Limited ethical and reliable sources.
4
ASX: SKY
TALLEBUNG TIN PROJECT
MAJOR HISTORIC TIN OPERATION
•
Tin discovered in the 1890s and mined into
the mid-1980s.
•
Small shafts and open pits mined hardrock
tin veins until large scale alluvial mining
production in the 1960s-70s.
•
Infrastructure already in place from previous
mining includes:
•
•
Powerlines to Site.
•
Haul roads constructed to site.
Large scale, hardrock tin deposit still in
place and only minor selective mining
historically.
5
ASX: SKY
TALLEBUNG TIN PROJECT
LARGE HARDROCK TIN RESOURCE
• Maiden MRE completed, March 2023:
10.2 Mt @ 0.18% Tin for 18kt of contained Tin.
• Initial Exploration Target estimate:
16 – 21 Mt @ 0.16 – 0.20% Tin
• Tin mineralisation highly amenable to 3x upgrade
using TOMRA Ore Sorting.
• 1.6km strike of Exploration Target; +2km strike
potential of tin mineralisation shown in gravity survey,
showing significant growth potential.
• MRE and Exploration Target open along strike and
both up and down dip – only limited by drilling.
• High impact resource expansion campaign imminent .
Schematic Plan View - Tallebung Tin Mine
6
ASX: SKY
TALLE B UN G TIN PROJECT
Cassiterite Ore from Tallebung – Scale in mm
TOMRA – GAME CHANGER
Black Tin – cassiterite “nuggets”
detected by ore sorter and accepted
• TOMRA Ore Sorting more than triples
grade.
Host rock and quartz vein without tin
are rejected by ore sorter
• Grade increases from 0.18% Tin x 3 =
over 0.5% Tin with +98% tin recovery
Schematic of a TOMRA XRT Ore Sorter
• +67% of mined mass rejected upfront.
• Reduced mass means smaller, lower
plant costs to produce the same
quantity of saleable tin concentrate.
Accepted
Rejected
7
ASX: SKY
TALLE B UN G TIN PROJECT
TOMRA – PROVEN TECHNOLOGY
• Renison Tin Mine, Australia’s largest
operating tin mine, uses TOMRA ore sorters to
increase tin grade and decrease mass for
processing.
• TOMRA Ore Sorters commissioned 5 years
ago at Rension in 2018 and operate 24/7, all
year round, processing a 1Mtpa ROM.
• Sorting started with rejecting 10-15% of mass,
increasing to 20-25% of mass after the first
year of operation showed strong results.
• Ore Sorting at Renison allows a mining rate of
up to 1Mtpa while still using the existing
750ktpa plant.
TOMRA Ore Sorters in operation at the Renison Tin Mine, Tas.
8
ASX: SKY
TALLE B UN G TIN PROJECT
EXCEPTIONAL, CONSISTENT
TOMRA ORE SORTING RESULTS
• TOMRA Ore Sorting first tested on drill chips,
demonstrated:
• Successful upgrading of 0.19% tin to 0.70% tin
• +96% recovery of tin
• 74% mass reduction.
• Bulk testwork repeated these exceptional results,
showing:
• 0.29% tin upgraded to 0.89% tin
• +98% recovery of tin from a 542kg bulk sample
• 67% mass reduction.
• Repeatability of TOMRA ore sorting results,
combined with historic mining records and
petrographic studies, all show consistent nature of
coarse cassiterite-hosted tin at Tallebung.
9
ASX: SKY
TALLE B UN G TIN PROJECT
SIMPLE METALLURGY –
LOW-COST PROCESSING
• Simple gravity circuit produces a desirable +60%
tin concentrate for sale.
• With TOMRA and DMS, only a quarter of mined
mass require downstream processing with over
+95% of the tin recovered in ore sorting upgrade.
Cassiterite Ore from Tallebung – Scale in mm
• Environmentally best practice, only water is need
for the gravity concentration and no chemicals or
water required for TOMRA Ore Sorting.
• Significant reduction in CapEx and OpEx from ore
sorting mass reduction and simple processing.
• Dense Medium Separation (DMS) reduces fines
mass by over 91% with +95% total recovery of tin.
Simplified Schematic Processing Flowsheet
10
ASX: SKY
TALLE B UN G TIN PROJECT
RESOURCE GROWTH POTENTIAL AND
SHALLOW HIGH-GRADE START UP
• Gravity anomaly coincident with tin mineralisation
extends well beyond current extent of drilling.
• Shallow, at surface high-grade tin zone identified for
fast payback potential at commencement of mining.
Schematic Cross-Section of Shallow High-Grade Zone
Plan View Aerial Image of the Tallebung Project
11
ASX: SKY
TALLE B UN G TIN PROJECT
UPCOMING DRILLING PROGRAM:
INCREASING CONFIDENCE
• Drilling program aimed to increase Inferred Resource
and potential Indicated Resource categories.
• Infill drilling will target areas for highest impact and
under significant historic workings.
• Resource extension drilling south along strike will
target recent high-grade tin intercepted, including:
TBRC042:
11m @ 0.81% Tin from 27m.
• Diamond drilling planned for geotechnical studies
and for further bulk ore sorting and metallurgical
testwork across the deposit.
• Resource geologists consulted to ensure the
program delivers highest impact on resource.
Plan View Aerial Image of the Tallebung Project
12
ASX: SKY
TALLE B UN G TIN PROJECT
NEXT STEPS
Expand the maiden MRE and
convert +20Mt Exploration Target.
Drill high-grade tin zones and
grow an Indicated Resource for
Mine Scoping Studies.
Bulk sampling across the deposit,
growing confidence in low cost
sorting upgrade and metallurgy.
Release Mine Scoping Studies.
Drone Photo of the Tallebung Tin Mining Field
13
ASX: SKY
WORK PROGRA M
UPCOMING WORK PROGRAM
• Assess the mining economics at
Tallebung once Indicated
Resources have been defined.
• Expand the Tallebung Resource and
convert the Exploration Target into
Resources.
• Commence baseline environmental
studies at Tallebung.
• Assess Doradilla to host economic
Tin and REE deposits.
• Metallurgical testwork on Tin and
REE extraction at Doradilla.
Indicative Work Program Timeline
FY2023
Project
Activities
Tallebung
Resource Infill and
Extension Drilling Program
Tallebung
Mine Concept Studies
Tallebung
Second Resource
Estimate
Tallebung
Mine Scoping Studies
Tallebung
Baseline Environmental
Studies
Tallebung
Resource Extension
Drilling Program
Q4
FY2024
Q1
Q2
14
DEVELOPING LARGE SCALE
TIN DEPOSITS IN NSW –
TO FEED GLOBAL
ELECTRIFICATION
ASX: SKY
APPE NDIX : DORADILLA PROJECT
DORADILLA – 16km
MINERAL-POWERHOUSE
SCHEMATIC LONG SECTION
ASX: SKY
APPE NDIX : DORADILLA PROJECT
TIN AND REE POTENTIAL
• Three tin deposits previously discovered in the
1970s, namely Doradilla, Midway and 3KEL, the
16km strike of these is named the ‘DMK’ Line.
• SKY has discovered REE within the tin deposits
in all three deposits on the ‘DMK’ Line.
• Best mineralisation to date is at the Midway
deposit, which is closest to the source of the
mineralisation – the underlying Midway Granite.
• REE Mineralisation is hosted in the +60m thick
clays over the DMK Line.
• TREO intercepts average over 20% Nd + Pr + Dy
+ Tb with some intercepts over 40% Nd + Pr +
Dy + Tb, particularly high at Midway.
17
ASX: SKY
APPE NDIX : DORADILLA PROJECT
NEXT STEPS
Further assaying of previous historic drilling for
REE – 100s of holes drilled for tin along the DMK
Line, SKY has only assayed 46 holes for REE so far.
Drilling program planned to test Midway Granite
targets and to infill between Midway-Doradilla.
REE mineralisation characterisation to begin
metallurgical testwork, ANSTO to commence
metallurgical testing on samples and identify
pathways to process the large tin resources.
Cross-Section of AMW 10 hole at Midway.
18
ASX: SKY
APPE NDIX : TIN MARKET
TIN: THE FORGOTTEN ELECTRIFICATION METAL
Inelastic tin price driven by irreplaceable demand in electronics sector
20-year 3M tin price (AUD/tonne) (source: LME).
ASX: SKY
APPE NDIX : TIN MARKET
TIN: KEY TECHNOLOGY METAL
Supply crunch driven by 30+ year under investment & growing demand for
tin primarily within EVs, Renewable Energy and all electronic goods.
Demand Increase with Emerging Technologies
Share your feedback
Discover