STRONG TRENCHING RESULTS IDENTIFY KEY AREAS FOR BULK
SAMPLING AT TALLEBUNG TIN PROJECT
MULTIPLE ZONES OF TIN MINERALISATION ENCOUNTERED, OUTLINING AREAS FOR UPCOMING BULK SAMPLING
PROGRAM AND LARGE-SCALE METALLURGICAL TESTWORK
Trenching results have successfully identified four zones which are suitable to extract bulk
samples for a total of approximately 50 tonnes of tin mineralisation to test metallurgical
optimisation on varying tin grades and mineralisation throughout the entire deposit.
Assays from the six trenches (T4-T9) excavated in late 2024 confirm that all trenches
intersected tin mineralisation at surface and across the entire project area.
The upcoming bulk sample and large-scale metallurgical testwork program will provide SKY
with an outstanding opportunity to:
Optimise the entire metallurgical flowsheet in a pilot-scale plant;
Produce tin concentrate for ongoing marketing, end-user engagement;
Increase confidence in resource estimation with tin produced from the bulk
samples to be reconciled with the grade estimate to validate the MRE model.
The bulk sampling program is scheduled to commence in the coming fortnight.
SKY Managing Director & CEO Oliver Davies commented: “Now that we have received the results from this
successful trenching program, the second phase of excavating bulk samples for metallurgical testwork can begin.
The bulk sampling program will mimic the mining process, with the bulk samples to be taken directly below the
trenches, crushed and then run through a large-scale metallurgical testwork program using full-size ore sorting
equipment and a pilot-scale gravity plant to produce a tin concentrate from the bulk samples. This program will be
of immense benefit to SKY, providing exceptional insights into how the ore sorting and low-cost gravity processing
components of the flowsheet can be further optimised. This will help us to continue to accelerate SKY towards the
low-cost, near-term tin production opportunity being developed at Tallebung.”
Sky Metals Ltd (ASX: SKY) (‘SKY’ or the ‘Company’) is pleased to report results from the trenching channel sampling
program completed at its flagship 100%-owned Tallebung Tin Project in central NSW in late 2024.
TALLEBUNG PROJECT (EL 6699, SKY 100%)
TRENCHING AND BULK SAMPLING PROGRAM
Results have been received for the successful trenching program comprising six (6) trenches (T4-T9) for total of
approximately 201m of trenching. The trenching sites were selected to target variation of deposit tin grades and
traverse zones across the entire footprint of the currently defined extent of the Tallebung tin mineralisation.
SKY METALS LIMITED
+61 2 6360 1587
2 HAWTHORN PLACE, ORANGE NSW 2800
WWW.SKYMETALS.COM.AU
ABN 46 098 952 035
Figure 1: Plan showing the results of the latest trenching program in orange as well as existing drilling, highlight
drill intercepts and the boundary of the Tallebung exploration target shown over geology map.
All trenches successfully intersected tin mineralisation at surface, providing valuable insights into the geology at
Tallebung (see Figure 1 and Table 2). Results included:
T4:
3m @ 0.16% Sn from 12m along trench.
T5:
10m @ 0.15% Sn & 0.02% W from 22m along trench (NB: includes 2.8m from 28-30.8m with no
sample and recorded as 0% Sn), including:
6m @ 0.20 % Sn & 0.02% W from 22m along trench, including:
1m @ 0.44% Sn & 0.03% W from 22m along trench.
T6:
1m @ 0.19 % Sn & 8.41g/t Ag from 41m along trench.
T7:
4.9m @ 0.37% Sn from 8m along trench (NB: intercept was terminated on zone of historic selective
mining which had already deeply excavated the zone immediately adjacent to the intercept), including:
0.9m @ 1.15% Sn from 12m along trench (immediately adjacent to selectively mined zone).
T8:
1m @ 0.15% Sn & 12.1g/t Ag from 2m along trench; and
2m @ 0.18% Sn & 0.03% W from 30m along trench.
T9:
6m @ 0.08% Sn, 0.03% W & 48.3g/t Ag from 11m along trench, including:
1m @ 0.24% Sn, 0.10% W & 221g/t Ag from 11m along trench.
2
In the case of the best two results in T5 and T7, both trenches had zones where the trench did not have bedrock
to be sampled. In T5, an erosional channel had removed a zone within the mineralised tin intercept, and in T7
historic selective mining had extracted a section of the bedrock immediately adjacent to where the best trenching
assay result was returned.
As a result of these factors, the results from of these trenches might have been significantly higher in grade and
width had these areas been intact and present to be sampled. Regardless, the trenching results will be
incorporated into the geological model to increase both the size and confidence in the MRE.
In addition to improving the MRE, the trenching results have been used to identify four (4) zones for bulk sampling.
To mimic mining, the bulk samples will be taken from directly below these trenches, in a deeper cut underneath
and also perpendicular to the strike of the mineralisation. This will ensure representative bulk samples of the
Tallebung tin mineralisation are extracted for metallurgical testwork.
Following sampling in the next fortnight, the bulk samples will be crushed and sorted via XRT ore sorting at the
full-scale ore sorter at the TOMRA Ore Sorting Test Facility in Sydney. The sorted samples will then be sent to ALS
Burnie in Tasmania for grinding and processing in a pilot-scale gravity plant to produce a tin concentrate.
The tin concentrate from this program will provide sample concentrate to use for marketing purposes and
customer engagement for the tin concentrate to be produced at Tallebung. Given the favourable nature of the tin
mineralisation at Tallebung, it is anticipated that the tin concentrate will be very desirable for downstream markets.
Results for the bulk sampling metallurgical testwork will be continuously reported on as work progresses over the
coming months.
This announcement is authorised for release by the Board of Sky Metals Limited.
Investors:
Oliver Davies – Managing Director & CEO
+61 (0) 430 359 547
Media:
Nicholas Read – Read Corporate
+61 (0) 419 929 046
JOIN SKY METALS’ INTERACTIVE INVESTOR HUB
Visit skymetals.com.au to interact with Sky Metals’ announcements and updates
3
About the Tallebung Tin Project - (100% SKY)
Tallebung stands as an open-pit, technology enabled, near-term tin development project. Tallebung is uniquely
placed to provide secure tin supply, to feed irreplaceable and rapidly expanding tin demand, essential in semiconductors, electronics and solar PV technologies.
The Tallebung Tin Project is located at the site of large-scale historical tin mining in central Western NSW
where tin was first discovered in the 1890s. SKY is progressively defining a large-scale hardrock tin resource
with recent higher-grade tin zones discovered on the margins of the known deposit and exceptional
metallurgical performance demonstrated across the entire known deposit.
The shallow, open-pit tin veins combined with the ideal nature of the tin, hosted as large, discrete grains of
simple tin-oxide (cassiterite minerals), all ideally lends itself to low-cost tin production advantages, including
exceptional X-ray based ore sorting performance, demonstrated to upgrade the tin up to 44x, prior to low-cost
gravity separation to produce a saleable tin concentrate.
Competent Persons Statement
The information in this report that relates to Exploration Results is based on information compiled by Mr. Oliver
Davies, who is a Member of the Australasian Institute of Geoscientists. Mr. Oliver Davies is an employee and
director of Sky Metals Ltd and has sufficient experience which is relevant to the style of mineralisation and type
of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral Resources and
Ore Reserves.’ Mr. Davies consents to the inclusion in this report of the matters based on his information in the
form and context in which it appears.
Previously Reported Information
The information in this report that references previously reported exploration results is extracted from the
Company’s ASX market announcements released on the date noted in the body of the text where that reference
appears. The previous market announcements are available to view on the Company's website or on the ASX
website (www.asx.com.au). The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially modified from
the original market announcements.
Disclaimer
This report contains certain forward-looking statements and forecasts, including possible or assumed reserves
and resources, production levels and rates, costs, prices, future performance or potential growth of Sky Metals
Ltd, industry growth or other trend projections. Such statements are not a guarantee of future performance and
involve unknown risks and uncertainties, as well as other factors which are beyond the control of Sky Metals Ltd.
Actual results and developments may differ materially from those expressed or implied by these forward-looking
statements depending on a variety of factors. Nothing in this report should be construed as either an offer to sell
or a solicitation of an offer to buy or sell securities.
This document has been prepared in accordance with the requirements of Australian securities laws, which may
differ from the requirements of United States and other country securities laws. Unless otherwise indicated, all
ore reserve and mineral resource estimates included or incorporated by reference in this document have been,
and will be, prepared in accordance with the JORC classification system of the Australasian Institute of Mining,
and Metallurgy and Australian Institute of Geoscientists.
4
Table 3: Trench coordinates (MGA94 Zone 55) with start and end with name and length of trench.
START
TRENCH
ID
END
LENGTH
EASTING
NORTHING
RL
EASTING
NORTHING
RL
6376278
6376641
294
283
460855
460760
6376288
6376653
292
281
25
T5
460832
460726
T6
460617
6376449
289
460672
6376461
291
56
T7
460440
6377163
266
460466
6377175
265
28
T8
460500
6376841
287
460529
6376856
288
32
T9
460112
6377204
295
460133
6377211
294
24
T4
COMMENTS
36
Table 2: Trenching Program – Significant Intercepts. Samples are located by metres along the trench from
southwest to northeast.
Trench
ID
From
To
Interval
Sn
W
Ag
Cu
Zn
(m)
(m)
(m)
%
%
g/t
%
%
T4
12
15
3
0.16
-
-
-
-
T5
22
32
10
0.15
0.02
-
-
-
including
22
28
6
0.2
0.02
-
-
-
including
T6
22
41
23
42
1
1
0.44
0.19
0.03
-
-
-
-
T7
8
12.9
4.9
0.37
-
-
-
-
including
12
12.9
0.9
1.15
-
-
-
-
T8
T9
2
30
11
3
32
17
1
2
6
0.15
0.18
0.08
0.03
0.03
12.1
48.3
-
-
including
11
12
1
0.24
0.1
221
0.07
-
5
Comment
Includes where a deep erosional channel was
intercepted and 2.8m of no sample (28-30.8m)
was attributed 0% Sn.
Intercept ends on the margin of the erosional
channel (no sample between 28-30.8m).
Intercept ended where historic mining activity
had selectively mined out tin mineralisation for
2.8m (12.9-15.7m).
JORC CODE, 2012 - TABLE 1
Section 1 Sampling Techniques and Data – TALLEBUNG PROJECT
(Criteria in this section apply to all succeeding sections)
Criteria
Explanation
Sampling techniques
Sample were from approximately 50mm x 50m
Nature and quality of sampling (e.g. cut channels, random chips, or specific specialised
industry standard measurement tools appropriate to the minerals under investigation, such 0.5-1m deep x 1m trench and sampling was pa
as downhole gamma sondes, or handheld XRF instruments, etc). These examples should not only.
be taken as limiting the broad meaning of sampling.
All samples were submitted to ALS Orange for
Include reference to measures taken to ensure sample representivity and the appropriate
calibration of any measurement tools or systems used.
Standards are insert every 50 samples.
All sample lab received weights show consiste
any interval within an assayed interval.
Aspects of the determination of mineralisation that are Material to the Public Report. In
cases where ‘industry standard’ work has been done this would be relatively simple (e.g.
‘reverse circulation drilling was used to obtain 1 m samples from which 3 kg was pulverised
to produce a 30 g charge for fire assay’). In other cases, more explanation may be required,
such as where there is coarse gold that has inherent sampling problems. Unusual
commodities or mineralisation types (e.g. submarine nodules) may warrant disclosure of
detailed information.
Each sample was dried, crushed and pulverise
crushed to sub 2mm, split and then 2-3kg pulv
Samples were taken at nominally 1m, but with
interval and sample was dried, crushed and pu
Standard assay procedures performed by a re
Ag, As, Cu, Fe, In, Pb, S, Zn are digested by fou
and W assays were generated by lithium bora
these elements and by XRF fusion for +1% ore
Drilling techniques
Drill type (e.g. core, reverse circulation, open-hole hammer, rotary air blast, auger, Bangka, N/A – no drilling results reported
sonic, etc) and details (e.g. core diameter, triple or standard tube, depth of diamond tails,
face-sampling bit or other type, whether core is oriented and if so, by what method, etc)
Drill sample recovery
N/A – no drilling results reported
Method of recording and assessing core and chip sample recoveries and results assessed.
Measures taken to maximise sample recovery and ensure representative nature of the
samples.
Whether a relationship exists between sample recovery and grade and whether sample bias
may have occurred due to preferential loss/gain of fine/coarse material
Whether core and chip samples have been geologically and geotechnically logged to a level Systematic geological and geotechnical loggin
of detail to support appropriate Mineral Resource estimation, mining studies and
excavated. Data collected includes:
metallurgical studies
Nature and extent of lithologies.
Whether logging is qualitative or quantitative in nature. Core (or costean, channel, etc)
Relationship between lithologies
photography
Amount and mode of occurrence
The total length and percentage of the relevant intersections logged
Location, extent, and nature of st
data (alpha & beta) are recorded
Logging
Both qualitative and quantitative data is collec
6
Criteria
Sub-sampling techniques
and sample preparation
Explanation
Quality of assay data
and laboratory tests
Verification of sampling
and assaying
Commentary
Each channel sample was dried, crushed and pulverised as per standard industry practice with the entire
If core, whether cut or sawn and whether quarter, half or all core taken
If non-core, whether riffled, tube sampled, rotary split, etc and whether sampled wet or dry sample crushed to sub 2mm, split and then 2-3kg pulverised to >90% passing 75um.
For all sample types, the nature, quality and appropriateness of the sample preparation
Field duplicates show excellent repeatability of sampling.
technique
Quality control procedures adopted for all sub-sampling stages to maximise representivity of Sample weights were consistent and reconciled with length of interval sampled.
samples
Channels were cut in metre-to-metre process of as straight a sample as possible to ensure best
Measures taken to ensure that the sampling is representative of the in-situ material collected,
representivity of the sample for each interval.
including for instance results for field duplicate/second-half sampling.
Whether sample sizes are appropriate to the grain size of the material being sampled
Large sample sizes (7-10kg) were taken and considered appropriate, however, this work will form the basis
for a larger program to better understand sample representativity at the Tallebung. See body of
announcement.
The nature, quality and appropriateness of the assaying and laboratory procedures used and Standard assay procedures performed by a reputable assay lab, ALS Orange - Forty-eight elements including
Ag, As, Cu, Fe, In, Pb, S, Zn are digested by four-acid digest then analysed by ICPMS (method ME-MS61). Sn
whether the technique is considered partial or total
For geophysical tools, spectrometers, handheld XRF instruments, etc, the parameters used in and W assays were generated by lithium borate fusion XRF (method ME-MS85) – considered appropriate for
determining the analysis including instrument make and model, reading times, calibrations these elements and by XRF fusion for +1% ore grade assays.
factors applied and their derivation, etc
Nature of quality control procedures adopted (e.g. standards, blanks, duplicates, external
No geophysical tools were used in the determination of assay results.
laboratory checks) and whether acceptable levels of accuracy (i.e. lack of bias) and precision
have been established
Certified reference material or blanks were inserted at least every 50 samples. Standards are purchased
from Certified Reference Material manufacture companies: Standards were purchased in foil lined packets
of between 60g and 100g. Different reference materials were used to cover high grade, medium grade, low
grade, and trace ranges of elements, with a primary focus on Sn and W.
The verification of significant intersections by either independent or alternative company
personnel.
The use of twinned holes.
Documentation of primary data, data entry procedures, data verification, data storage
(physical and electronic) protocols.
Discuss any adjustment to assay data
Drill data is compiled, collated and reviewed by senior staff and external consultants. The calculations were
viewed by >1 personnel.
Twinned holes have been used by past explorers to validate the results achieved and have confirmed these
historic results.
Drill Hole Data including: meta data, any gear left in the drill hole, lithological, mineral, survey, sampling,
magnetic susceptibility was collected and stored as physical and electronic copies or entered directly into an
excel spread sheet using drop down codes. When complete the spreadsheet was combined into a master
excel spreadsheet as the drill hole database.
Assay data was provided by ALS Burnie via spreadsheets. The data was validated using the results received
from the known certified reference material. Hard copies of the assay certificates were stored with drill hole
data such as drillers plods, invoices, and hole planning documents.
Assay data is not adjusted.
Location of data points
Accuracy and quality of surveys used to locate drill holes (collar and down-hole surveys),
trenches, mine workings and other locations used in Mineral Resource estimation.
Specification of the grid system used
Quality and adequacy of topographic control
7
SKY has used DGPS surveying of across the trenches (± 0.1m) to accurately locate them.
All coordinates are based on Map Grid Australia Zone 55E, Geodetic Datum of Australia 1994.
Criteria
Data spacing and
distribution
Explanation
Commentary
Data spacing for reporting of Exploration Results
At this stage, drilling of the MRE area of the project has been drilled to at least approximately 80m x 80m
Whether the data spacing, and distribution is sufficient to establish the degree of geological down to 40m x 40m for inferred and indicated resources respectively. Outside of the MRE are, data spacing
and grade continuity appropriate for the Mineral Resource and Ore Reserve estimation
is variable as the focus is on geological mapping and identifying new zones of mineralisation.
procedure(s) and classifications applied
Whether sample compositing has been applied
The maiden MRE was estimated to inferred and indicated and increases in resource confidence will require
tighter spaced drilling, such as some of the drilling completed in this program.
Sample Compositing is not applied.
Orientation of data in
relation to geological
structure
Whether the orientation of sampling achieves unbiased sampling of possible structures and
the extent to which this is known, considering the deposit type
If the relationship between the drilling orientation and the orientation of key mineralised
structures is considered to have introduced sampling bias, this should be assessed and
reported if material
Trenches were orientated to cross the mineralisation trend at moderate to high angles perpendicular to
strike. As the trench is along the surface, not adjust can be made for the dip of the mineralisation, a near
horizontal trench is not ideal to intercept the shallow dipping veins at Tallebung but cannot be changed and
is a factor of using trenching.
No sample bias due to trench orientation is known. The structural controls on mineralisation is considered
well understood and consistent.
Sample security
The measures taken to ensure sample security
Sample chain of custody has been managed by the employees of Sky Metals who commissioned the
trenching and transport samples from the site to test facilities.
The Company has in place protocols to ensure data security.
Audits or reviews
The Company has external consultants to verify the metallurgical testwork and exploration data for the
resource estimation process. Further details for the MREs can be found in SKY ASX Announcement 22 Match
2023 and SKY ASX Announcement 23 January 2024.
The results of any audits or reviews of sampling techniques and data
Section 2 Reporting of Exploration Results – TALLEBUNG PROJECT
(Criteria listed in the preceding section also apply to this section)
Criteria
Explanation
Mineral tenement and
land tenure status
Commentary
Type, reference name/number, location and ownership including agreements or material The Tallebung Project is described by NSW Exploration Licence 6699
issues with third parties such as joint ventures, partnerships, overriding royalties, native The tenement is 100% owned by Stannum Pty Ltd, a 100% owned subsidiary of Big Sky Metals Pty Ltd and a
title interests, historical sites, wilderness or national park and environmental settings.
100% owned subsidiary of Sky Metals Ltd.
The Tallebung tenement is overlain by Native Title Determination Application No NC12/1 (Federal Court No NSD
415/12). A determination of extinguished native title was received over a portion of the Tallebung Tin Field.
An agreement between for the remainder of the tenement where Native Title has not been extinguished, an
agreement has been reached between Stannum and the Native Titla Applicant to allow access to the remainder
of the tenement.
8
Criteria
Exploration done by
other parties
Explanation
Commentary
The security of the tenure held at the time of reporting along with any known
impediments to obtaining a licence to operate in the area
Stannum Pty Ltd have previously Commenced a Right to Negotiate Process (RTN) with the claimant group with
respect to Application No NC12/1 (Federal Court No NSD 415/12). These negotiations have resulted in a land
access agreement to be sign with Stannum Pty Ltd. A determination of extinguished native title was received
over a major portion of the Tallebung Tin Field and Stannum has also signed an access agreement with the
Native Title Applicant for access to the entire lease.
Acknowledgment and appraisal of exploration by other parties
The Tallebung Project area was subject to a modern, large-scale alluvial/colluvial mining by the Tullebong Tin
Syndicate in the period 1963-1972. The Tullebong Syndicate Completed a program of 24 short diamond holes in
1968-69 designed to test the lode mineralisation at Tallebung.
Pruessag Completed a large-scale assessment of the alluvial tin deposits in 1984-85, including RC drilling,
identifying the potential for a large, low grade alluvial deep lead.
In recent exploration, YTC Resources (now Aurelia Metals Ltd) Completed trenching, diamond drilling, aircore
drilling of tailings, and resistivity geophysics (EH4) at the Tallebung tin field. YTC recognised the continued
potential for both shallow high grade, and large scale low-grade porphyry-style- tin mineralisation.
Geology
Drill hole Information
Deposit type, geological setting and style of mineralisation
The Ordovician aged Tallebung Group sediments in the Tallebung Tin Field area outcrop as a sequence of weakly
metamorphosed shales, siltstones, carbonaceous mudstones and minor quartz-rich sandstones. The rocks are
tightly folded, striking NNW at around 330o with variable dips. The tin mineralisation is thought to be sourced
from the Silurian-aged Erimeran granite, which outcrops 2km south of the Tallebung Tin Field. The Tallebung Tin
Field represents a site of significant tin and tungsten production from high grade, quartz lodes and their
associated alluvial and deep lead deposits. The field has been worked sporadically from the discovery of lode tin
in the 1890’s, through to the large-scale open cut mining of alluvial tin by the Tullabong Tin Syndicate in the
period 1963 to 1971. The Tallebung Tin Field contains significant, tin bearing, unconsolidated sediments which
are alluvial to elluvial in nature, poorly sorted and contain coarse bedrock fragments up to 15cm in a matrix of
sandy/silty clay with some iron oxides and cemented layers. Sediment thickness varies from 5m to 36 metres.
The east-trending, tin bearing leads and deep leads draining the Tallebung lode deposits are the dominant
source of historic tin production from the field. The Tallebung site is now a large-scale derelict mining
environment with approximate at least 1.6km strike of shallow open cuts, large scale tailings dam and decaying
mine site housing and infrastructure.
The tin and tungsten bearing quartz reefs are located on the western edge of the worked out alluvial open pits.
The lodes form a well-developed quartz vein stock work zone extending for approximately at least 1.6km on a
330o trend. Thicker quartz lodes >0.5m have been selectively exploited in historic shafts and shallow open cuts
along the trend.
A summary of all information material to the understanding of the exploration results
including
a tabulation of the following information for all Material drill holes:
easting and northing of the drill hole collar
elevation or RL (Reduced Level–elevation above sea level in metres) of the drill hole
collar
dip and azimuth of the hole
down hole length and interception depth
hole length
9
See body of announcement.
Criteria
Data aggregation
methods
Explanation
Commentary
If the exclusion of this information is justified on the basis that the information is not
Material and this exclusion does not detract from the understanding of the report, the
Competent Person should clearly explain why this is the case.
In reporting Exploration Results, weighting averaging techniques, maximum and/or
Where reported, trenching results from the Tallebung Project have been length weighted. Grades greater than
minimum grade truncations (e.g. cutting of high grades) and cut-off grades are usually 500ppm Tin have been used to calculate intercepts. No high cut-off has been applied for exploration data,
Material and should be stated.
however, a top cut is used for resource calculations (please see SKY ASX Announcement 22 Match 2023 and SKY
Where aggregate intercepts incorporate short lengths of high-grade results and longer lengths of ASX Announcement 23 January 2024 for further details).
low grade results, the procedure used for such aggregation should be stated and some typical
examples of such aggregations should be shown in detail.
Intercepts are length weighted with no cutting of grades. This may lead to elevation of intercept grades due to
The assumptions used for any reporting of metal equivalent values should be clearly stated
the presence of a narrow interval of high-grade material. Such high grade zones are reported as included
intercepts inside the broader intercept.
No metal equivalences quoted.
These relationships are particularly important in the reporting of Exploration ResultsAt Tallebung, orientated drill core has been used to allow determination of orientation of structures and
if the geometry of the mineralisation with respect to the drill hole angle is known, its mineralisation. Lode orientation of the Tallebung is well constrained by previous drilling and outcrop. Drilling
nature should be reported.
intercepts lodes at or very close to perpendicular and reported intercepts are therefore estimated true
if it is not known and only the down hole lengths are reported, there should be a clear thickness, trenching may intercept at higher angles.
statement to this effect (e.g. ‘down hole length, true width not known’).
Relationship between
mineralisation widths
and intercept lengths
Diagrams
Appropriate maps and sections (with scales) and tabulations of intercepts should be
included for any significant discovery being reported These should include, but not be
limited to a plan view of drill hole collar locations and appropriate sectional views.
Balanced reporting
See body of announcements and previous releases on Tallebung.
Where Comprehensive reporting of all Exploration Results is not practicable,
representative reporting of both low and high grade and/or widths should be practiced to
avoid misleading reporting of Exploration Results.
Other substantive
exploration data
Other exploration data, if meaningful and material, should be reported including (but not See body of announcement SKY ASX Announcement 22 March 2023, SKY ASX Announcement 22 June 2023, SKY
limited to): geological observations; geoph